查询词典 be fault-finding
- 与 be fault-finding 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Second, by analyzing the strain of northsouth blocks of the fault, we find an asymmetric displacement distribution between the two sides of the rupture, and the two blocks are subject to compressional and tensional stress respectively. It is a pattern that cannot be explained with the linear elastic theory. However, laboratory experiments and in situ measurements in boreholes have shown that many crustal rocks exhibit a nonlinear elastic behavior in compression and tension with a dependence of the Young's modulus on the minimum principal stress. So we suggest that the nonlinear displacement distribution should be considered when dislocation and hypocentral parameters are analyzed.
进而通过对地震南北盘同震应变的分析,发现了昆仑山地震的南北两盘分别受挤压和拉张两种应力作用,研究表明多种岩石在拉张和压力作用下其最小主应力下的杨氏模量表现出非线性弹性特征,从而提出对昆仑山地震地表位移及震源特征参数分析时应考虑非线弹性介质导致的非线性弹性位移分布特征。
-
Every one is to be accountable for his own actions, and no man is to be laid under a suspicion or odium for the fault of another.
每个人对他自己的行为负责,没有人因为他人的错误而置于被怀疑和责难的境地。
-
I make "419 roads " going to , passing round north tetracylie sees the "Beijing National Stadium" time be probably 17:40 since traffic control , possessions run by all passing round of the "Beijing National Stadium" north bus,this moment the tetranuclear people of north is not many ,"the intelligent bridge circles in the air from safety" to "strengthening neither having many person bridge " inside, because of but the personnel has controlled face to face ,"the intelligent bridge circles in the air to "strengthening only when the people who holds a ticket can enter secondary safety" bridge " area, Entering mansion , our thereby having stood for one in a nearest fault street overline bridge will be, what all fails to see basically.
还是决定去鸟巢附近看看,由于交通管制,所有走鸟巢北边的公交全绕行,我做419过去的,绕行北四环看到鸟巢大概是17:40,这时候北四环人还不是很多,从安慧桥到健翔桥里面也没什么人,但是对人员也管制了,只有持证的人可以进入安慧桥到健翔桥区域从而进入场馆,我在最近的一个天桥站了一会,基本什么都看不到
-
Before you can properly train your first sheepdog, you should have some knowledge of the way their minds work and be prepared to take the blame for nearly everything that goes wrong because it will, in all probability, be your fault.
在你能够正确地训练你的第一只牧羊犬之前,应该对他们的思维方式有一定的了解,还要准备好为几乎所有的意外事件负责,因为十有八九,错误是你犯的。
-
It is found that the maximum fault current may be produced when the DGS with synchronous generators are installed at the outlet of the feeder. The critical installation capacity of DGS and the minimum impedance of the step-up transformer can be derived easily and verified by the computer simulation.
经由本文的研究可发现,同步发电机型式的分散式电源并联於馈线口所产生之故障电流最大,增加升压变压器的阻抗与降低分散式电源的容量皆可降低故障电流大小至限制范围内。
-
Stripping and slicing in group, execute presiding ask duty government of county Party committee of the high mountain that make a day, county divides entire county work into 16 chunk, 4 team leader divides the county accordingly to execute person specially assigned for a task to be in charge of making for 15 groups, right the working content of every group and responsibility made specific provision, the group leader of every group parts to be held the position of by member of team of vice secretary of county Party committee, members of standing committee and subprefect and National People's Congress, the Chinese People's Political Consultative Conference, strengthen the transverse communication chime between to move at the same time, every is involved piece with piece when the problem between, through the county main leader holds joint meeting of relevant group group leader to solve, those who prevent occurrence job rupture and fault.
切块分组,实行首席问责制天峨县委、县政府将全县工作分成16大块,县四家班子领导相应地分为15个组实行专人负责制,并对每个组的工作内容和责任作了明确规定,每个组的组长分别由县委副书记、常委和副县长以及人大、政协班子成员担任,同时加强横向之间的沟通和协调,凡涉及到块与块之间的问题时,通过县主要领导召开相关小组组长联席会议解决,防止出现工作的断裂和断层。
-
By analyzing the key generation equations of Trivium and determining 52 bit of its interior state which need to be altered, and then fault injections are used to alter these 52 bit and a faulty key stream can be obtained.
通过分析Trivium密钥流生成方程,确定需要改变Trivium 288 bit内部状态中的52 bit,使用错误注入改变所确定的52 bit,并生成密钥流,与原始密钥流进行差分。
-
In the Law of Tort,the dispute about whether the unlawful should be distinguished from the fault and whether the unlawfulness should be existed as an independent part of the Law of Tort has lasted for several centuries.
侵权行为法中,违法性是否应该与过错相区别而作为构成要件一部分的争论已经延续了数个世纪。
-
In cards and membership cards, not only in black and white printed on them, or you can color business card printing and membership card making, cards and membership cards making machines, Business card printing and membership card making object read in an informal, information may be made by wire to a surface and even can rotate 360 ° and fault correction features that make suffered defaced or damaged barcodes reversal may be recognized, misreading rate is 6 1 0 0 in a few cases, 2-dimensional barcode also has stock in ensuer megasporogenesis,抗损, high safety may fax and photocopying, information hiding, and go with the product information.
在制卡和会员卡制作上,不仅可在白纸上印黑字,也可以彩色制卡和会员卡制作,对制卡和会员卡制作机器、制卡和会员卡制作对象不拘,资料的读取可由线到面甚至可以旋转360°,并可采用故障订正功能,可使遭受污损或破损的条形码复原识别,误读率为6 1 0 0 万分之几,二维条形码还具有储存量大、抗损性强、安全性高、可传真和影印、资料隐蔽性好、信息随着产品走等特点。
-
Some methods aiming at the two problems have been researched. First, the optimal number of ATE site can be calculated based on a cost model of DAT-ATE. Second, the problem of test schedule which is equitant with two-dimensional Bin-Packing problem is presented. Then a TCG denotation satisfied with T-admissible rule is more convenient for combinational optimization. With Simulated annealing algorithm, better test scheduling results can be achieved; but there is no great optimization space because the efficiency of scheduling is greater than 90%. Third, A novel test compression method——Multi-capture testing is proposed to compress the stimuli. And the ATPG results show that MC achieves high compression ratio which is greater than 90% in some large-scale circuits. MISR, widely used in LBIST, is employed to compress the responses. The aliasing analysis demonstrates that the fault coverage reduction is little due to the existence of aliasing. Fourth, an improved TIC (called S-TIC) aiming at structured test is proposed based on ARM's TIC. A MC scheduling algorithm is proposed to compute the SoC test time and combine MC vectors to SoC test vectors. The scheduling results shows that test time is greatly reduced when using the proper scheduling priority.
首先,给出了低成本ATE的成本模型,根据此模型得到最低测试成本时系统级测试调度的基本参数——测试Site数;其次,本文将DAT-Scan方式的SoC测试调度等价为两维BP问题,为有效地求解该问题,将该BP问题表示为TCG图并通过模拟退火算法解决其求解过于复杂的问题,调度的结果表明该方法在测试时间上有一定改善,并指出DAT-Scan测试调度效率已经大于90%,进一步优化的空间较小;第三,本文尝试通过测试压缩来解决激励所需的测试带宽,提出了Multi-capture结构并解决了MC测试过程中的&矢量&退化问题,MC测试的ATPG结果表明其测试压缩率很高(大电路接近90%);第四,在激励获得很高压缩比的情况下,测试响应也需压缩,本文采用LBIST中常用的MISR作为MC测试的响应压缩电路,理论分析和实验结果都证明了MC测试的别名对故障覆盖率影响较小(小于2%),并对两类别名的成因做了具体分析;第五,在MC测试及其响应压缩的基础上,本文改进了ARM公司的测试控制器TIC使之适合于MC测试,为了解决MC测试矢量合成问题,本文抽取了MC测试模型,通过固定优先级的MC测试调度模拟将MC矢量合成为ATE矢量,并模拟出了总的MC测试时间。
- 推荐网络例句
-
I didn't watch TV last night, because it .
昨晚我没有看电视,因为电视机坏了。
-
Since this year, in a lot of villages of Beijing, TV of elevator liquid crystal was removed.
今年以来,在北京的很多小区里,电梯液晶电视被撤了下来。
-
I'm running my simile to an extreme.
我比喻得过头了。