英语人>网络例句>be cast up on 相关的网络例句
be cast up on相关的网络例句

查询词典 be cast up on

与 be cast up on 相关的网络例句 [注:此内容来源于网络,仅供参考]

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

Secondly, it summarizes development and gradual progress about operational risk measurement. Analyzes and compares two main categories at present: bottom-up and top-down, and Loss Distribution Approach of top-down and Income Model of bottom-up is studied deeply, then finds out the main challenges of operational risk measure methods. Thirdly, taking examples for Shanghai Pudong Development Bank and Shenzhen Development Bank, it demonstrates operational risk measurement of our banking using Basic Indicator Approach and Income Model of bottom-up. And by comparing its effects with analysis result of concrete loss incidents of operational risk, it is approved that to apply operational risk measurement to our banking is feasibility. Finally, the paper analyzes difficulties to measure operational risk, such as weak consciousness of measuring operational risk, short of effective modern measuring model, behindhand of loss data collection and lack of perfect inside management mechanism of measurement, and then gives some advices.

接着总结了操作风险度量方法的发展演进过程,对目前度量操作风险的两类主流方法&自下而上&法和&自上而下&法进行了详细的分析和比较,分别选取&自下而上&的损失分布法和&自上而下&的收入模型法展开深入研究,并剖析了操作风险度量方法面临的主要挑战;接着以&浦东发展银行&和&深圳发展银行&为例,选用&自上而下&的基本指标法和收入模型法进行了操作风险度量的实证分析,并将分析结果与使用具体损失事件的实际操作风险分析结果进行了比较,证实了操作风险度量方法应用于我国的可行性;最后文章对我国银行业度量操作风险中存在的现实困难进行了深入探讨,指出了我国存在操作风险度量认识障碍、缺乏适用的现代操作风险度量模型、损失数据收集工作滞后以及操作风险度量缺乏完善的内部管理机制保证四大方面的现实问题,并提出了对策建议。

As to the mate lag problems in loom beat up mechanism,comparing traditional four bar linkages with quick return four bar linkages beat up mechanism,the latter can solve the lag problems effectively.A CAD method of designing the quickreturn four bar linkages beat up mechanism is pointed out,and the design mathematics model and the kinematic analysis model are also presented.

针对现有织机打纬机构和开口机构在运动配合上存在的滞后问题,比较了传统的四连杆打纬和具有急回特性的四连杆打纬机构,基于后者能有效地改善配合上的滞后问题,提出了精确设计具有急回特性的四连杆打纬机构的CAD方法,给出了设计的数学模型、机构运动分析的数学模型。

Charge sound blowing up The battle drum strikes up and shout War cries up, 600 cavalry from the high-tilt down the slope, suddenly playing Everywhere looks for the tooth Yuan,Civilian clown Tsam Ma was also under the legislation.

冲锋号吹起来,战鼓擂起来,杀声喊起来,六百铁骑从高坡上倾斜而下,顿时打得袁军满地找牙,文丑也被立斩马下。

While the up-flow reactor is the key equipment in medium- and high-consistency clean bleach process, including oxygen delignification、hydrogen peroxide bleach、chlorine dioxide bleach、 ozone bleach, the flow characteristics of the medium consistency pulp in up-flow reactor have significant impact on the quality and the efficiency of the bleach reaction. In this work, a series of equipments are designed and manufactured for a systematic and deep study on the flow characteristics of the medium consistency pulp in up-flow reactor.

而升流式反应器是中高浓清洁漂白工艺(包括氧气脱木素、过氧化氢漂白、二氧化氯漂白、臭氧漂白等工艺)中的大型关键设备,中浓纸浆在升流式漂白反应器中的流动特性与漂白反应的质量、效率都有密切关系,因此本研究自行设计和制造了相关的实验设备,对中浓纸浆在升流式反应器中的流动特性进行了较为系统、深入的研究。

CRT as a booster pump and transfer pump sea water treatment and other abrasive liquids, reliable performance, and in the industry with the most extensive product line, flow up to 2200 l / h, pressure head of up to 250 meters ( specially designed high-pressure pump up to 450 meters).

CRT泵在作为增压泵和传送泵处理海水和其它磨蚀性液体时,性能可靠,而且在该行业中具有最广的产品系列,流量最高可达2200 l/h,压头最高为250米(特制的高压泵可达450米)。

Shou first, outstanding achievement of partial medium company is good, carry brace up medium board piece the person is angry, xin country installs the half annual report that (000839) issues to show in, the company realizes business income first half of the year 1.128 billion yuan, relatively go up growth of year of the corresponding period 27.31%; Net profit 137 million yuan, relatively go up growth of year of the corresponding period 44.20%.

首先,部分传媒公司业绩良好,提振了传媒板块的人气,中信国安(000839)发布的半年报显示,公司上半年实现营业收入11.28亿元,较上年同期增长27.31%;净利润1.37亿元,较上年同期增长44.20%。

Check on it 歌手 beyonce 请帮我翻译; you need to stop playing round with all them clowns and the wangstas.good girls gotta get down with them gangstas go head girl put some back and some neck up on it while i stand up in the background and check up on it ohh boy you looking like what you see.

你需要停止所有这些小丑和wangstas.good女孩一轮gotta着手与他们gangstas去把一些女孩头部背部和脖子上有它,而我站起来,并在后台检查它ohh男孩你寻找您所看到的一样。

Business signs up for dispatch although money signs up for Alibaba first quarter this year,indication net profit breaks up times to 300 million yuan of RMB, but president Wei Zhe still expects to pass the collaboration with Intel to divide a cup of a thick soup again on hardware, enlarge gain space.

商报讯尽管阿里巴巴今年一季度财报显示净利润翻倍至3亿元人民币,但总裁卫哲仍期望通过和英特尔的合作在硬件上再分一杯羹,扩大盈利空间。

第491/500页 首页 < ... 487 488 489 490 491 492 493 494 495 ... > 尾页
相关中文对照歌词
I'm Gonna Move Among You
La Fête Des Mères
Cast The First Stone
Non Coupable
Disque D'or
Everything To Lose
I'll Cast A Shadow
The Spell That You Cast
Cast The Spirit
Mama, I'm Satan
推荐网络例句

The shaping method of noncircular part and the tool holder's radial motion characters in noncircular turning process are discussed in detail in the thesis.

论文详细研究了非圆零件的成型方法和加工过程中刀架的径向运动规律。

I have not really liked him,I do not like his this kind of disposition.

我没有真的喜欢他,我不喜欢他的这种性格。

As we know the price of traditional product is composed of the cost and the profit of the company involving market competition, monopolizes and many other factors.

我们知道作为传统的商品,定价的模式往往是在成本的基础上增加厂商的预计利润而形成其价格,当然也要考虑到市场竞争、垄断等其他方面的因素。