英语人>网络例句>balanced step 相关的网络例句
balanced step相关的网络例句

查询词典 balanced step

与 balanced step 相关的网络例句 [注:此内容来源于网络,仅供参考]

Meanwhile, the concentration of Pb,Zn and other heavy metals is rather high in the oxidation zone and decreasesdownward to levels that are unbelievably low for Pb-Zn mine tailings. Theseobservations suggest that heavy metals should be re-immobilized by secondaryminerals, rather than primary minerals, in the oxidation zone, and could be leachedout from suboxic environment due to low rate oxidative dissolution which preventsthe precipitation of secondary minerals in significant amount. Thus, cover scenarioswhich establish a suboxic environment beneath the cover layer might not always beeffective in preventing heavy metal release from mine tailings.Sequential extraction studies indicate that, in addition to heavy metal leaching,oxidation of the mine tailings increased the mobility of residual Zn, and Cu, while Pb remains immobile due to the formation of anglesite (PbSO4). Using the seven-step extraction technique developed by Dold (J. Geochem. Explor., 2003, 80: 55-68), galena dissolves in significant amount at step 2 most probably due to the strong complexing of Pb2+ by acetate, while other metal sulfides dissolve at step 6, which suggest that this extraction technique could not be used to evaluate the mobility of lead in natural environment

重金属含量均低于新鲜尾矿,但以硬化层中的含量最高(Pb、Zn含量分别为0.47%和0.93%),往下大幅度降低,表明尾矿风化过程中形成的次生矿物对Pb、Zn等重金属元素有较强的固定作用,而次氧化带的淋溶作用造成了金属元素的大量流失;(4)与新鲜尾矿相比,硬化层中铅的可迁移性大大降低,硬化层之下尾矿样品中铅的可迁移性也不同程度降低,这是由于硫化物氧化产生的硫酸根与尾矿中的铅反应形成铅矾(PbSO_4)的缘故;(5)氧化作用使尾矿中的zn、Cu等重金属的可迁移性不同程度地增大,其中对锌的可迁移性影响最大,铜的可迁移性与铁比较相似,铅则容易与硫化物氧化形成的SO_4~(2-)反应形成铅矾(PbSO_4);(6)为了减少尾矿污染和修复矿山环境,人们提出了各种不同的尾矿覆盖方案,本文的研究结果表明,这些方法不一定能够有效地阻滞污染元素的迁移。

Statistic analysis result shows that the time step is the most important influence factor of simulation precision, and there is relation between simulation error and the setup value of restitution coefficient which the greater the setup value is, the less the simulation error is. Although there is no effect to the total contact time in the course of collision, the value of the time step decides the total contact step, and there is a logarithmic linear correlativity between them.

统计分析结果表明:计算时步是影响模拟精度最重要的因素;模拟误差还同恢复系数的设定值有关,设定值越大,模拟误差就越小;计算时步的大小虽然对碰撞过程的总接触时间影响不大,但是却决定了碰撞过程的总接触时步数,二者之间存在对数线性相关关系

With the reform step of the commercial bank has expedited, new institutional and constant renew from time to time, conditionality system is step by step to perfect, the management of the fixed assets is request more and more.

随着商业银行改革步伐的加快,新制度的不变更新,相应制约机制的不断完善,对固定资产的管理提出了新的要求。

Because of the problem of convergence, the key techniques to complete the one step simulation were explored thoroughly. The geometry mapping method based on finite element model and inverse deformation was developed to get the approximate initial blank for one step simulation. The effective selection of convergence factor in Newton-Raphson method was studied. The divergence criterion in iterative process for one step simulation was put forward. Also the countermeasure to ill equations coefficient matrix was studied.

由于存在收敛性的问题,本文重点研究了一步模拟方法计算机实现的关键技术:提出了基于有限元模型的几何映射方法和反向变形方法来确定初始毛坯的近似解,研究了带收敛因子的Newton-Raphson方法中如何高效地选取收敛因子,提出了一步模拟迭代求解过程中的发散准则,并研究了病态方程组系数矩阵的修正方法。

Carried on my backpack, grasped my crabstick, move up step by step carefully, every step, the race made me toppleing, the river seemed to show the last stateliness.

打好背包,抓紧手杖一步一步小心翼翼向前挪动着脚步,每踏出一步,汹涌的急流就冲得我摇摇欲坠,好象在向我显示着它最后的威严。

Described above is the computer power switch in the open for cold start when all initialization to complete the work, if we under DOS by Ctrl + Alt + Del combination of keys (or select from Windows to restart your computer) to hot start, then the POST will be the course of the past jump directly from the beginning of the third step, another step-by-step detection of the fifth CPU and memory tests would no longer be carried out.

上面介绍的便是计算机在打开电源开关进行冷启动时所要完成的各种初始化工作,如果我们在DOS下按Ctrl+Alt+Del组合键(或从Windows中选择重新启动计算机)来进行热启动,那么POST过程将被跳过去,直接从第三步开始,另外第五步的检测CPU和内存测试也不会再进行。

By making comparison between three-step method and four-step method of Gram stain,the author found that the stain progress of three-step method is simple,and is easy to hold decolor time.

对革兰氏染色三步法和四步法进行了试验比较,发现三步法染色过程操作简单,脱色时间易于掌握,便于学生操作和控制,且染色效果较好,明显提高了实验效率,值得在教学中推广使用。

In view of the above steps a second phenomenon, clone the operating system is to store the default camera driver in C: \ Windows \ Driver \ Camera \ 301P the following folder, when you click on the new CD-ROM drive to install the camera, the system will not prompt already exists there and the camera drivers to uninstall this driver, please find this folder and removed; step II, first to install a new camera driver, and then plug in the camera loaded with hardware, the installation is complete restart the computer after normal use; step three, repeat the above two steps do not directly click on the new CD-ROM installation the latest drivers, plug in the camera after the system detects new hardware and auto-complete loading hardware drivers; step four, entered the Device Manager, can see the image processing equipment has been successfully installed, but when you open the "AMCAP" Preview images can not be preview, black and white, black phenomenon; five steps to the right mouse button on the image processing equipment "Vimicro USB PC Camera (ZC0301PL)" update driver, a dialog box appears choose "from the list or designated as the location of the installation steps to choose the next six to choose "Do not Search" and enter "to install from the floppy disk interface.

针对以上第二种现象步骤一、克隆操作系统是将摄像头驱动默认存放在C:\Windows\Driver\Camera\301P文件夹下面,当你点击新的摄像头驱动光盘安装时,系统不会提示已经存在有摄像头驱动并把此驱动卸载,请把这个文件夹找到并删除掉;步骤二、先安装新的摄像头驱动,再插上摄像头装载硬件,安装完成后重新启动电脑后可以正常使用;步骤三、不需重复以上两个步骤,直接点击新的光盘安装最新的驱动,插上摄像头后系统检测到新硬件,并自动完成硬件驱动装载;步骤四、进入到设备管理器中,,可以看到图像处理设备已经成功安装,但当你打开"AMCAP"预览图像时会出现无法预览、白屏、黑屏现象;步骤五、把鼠标右键放在图像处理设备的"Vimicro USB PC Camera(ZC0301PL)"更新驱动程序,出现对话框后选择"从列表或指定为位置安装步骤六选择下一步后选择"不要搜索",进入"从软盘安装界面。

In order to meet the required simulation precision and meet the real-time simulation in ballistic simulation calculation,this paper analyzes the selection method of the simulation step,and then introduces variable step integration methods in Runge-Kutta to Adams and educes Adams variable step integral formulas,and then put forwards a method by seeking zero of condition function in discontinuous nonlinear system of the ballistic simulation.

在弹道仿真计算中,为了既达到要求的仿真精度又能满足实时仿真,分析了仿真步长的选择方法,然后在龙格-库塔转阿当姆斯法中引入变步长积分方法,推导了阿当姆斯变步长积分公式,同时对弹道仿真中的间断非线性系统提出条件函数求零的方法来解算弹道。

Although treatment success with either step-up or step-down treatment is similar, the step-up strategy is more cost effective at 6 months for initial treatment of patients with new onset dyspeptic symptoms in primary care.

结 论 在新发消化不良的初级保健中,尽管升序治疗与降序治疗的成功率相似,但在6个月时升序治疗策略显得更为经济划算。

第9/500页 首页 < ... 5 6 7 8 9 10 11 12 13 ... > 尾页
相关中文对照歌词
Step By Step
Step By Step
March Nigga Step
My Shoes
Step Your Game Up
Take Another Step
Step Up
Step By Step
Step
One Step Ahead Of The Devil
推荐网络例句

Article 144 The Government of the Hong Kong Special Administrative Region shall maintain the policy previously practised in Hong Kong in respect of subventions for non-governmental organizations in fields such as education, medicine and health, culture, art, recreation, sports, social welfare and social

第一百四十四条香港特别行政区政府保持原在香港实行的对教育、医疗卫生、文化、艺术、康乐、体育、社会福利、社会工作等方面的民间团体机构的资助政策。原在香港各资助机构任职的人员均可根据原有制度继续受聘。

Small wonder, then, that the Chinese spend more in the shop than any other group of foreign visitors do .

这样的小惊喜,使中国顾客比任何国家的人消费得更多。

A heavy dark cloud presaging rain or a storm .

预兆雨或暴风雨的沉重的黑云。