查询词典 backfill
- 与 backfill 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
This feature is useful for simulation of thick seams, over-stressed pillars, abutments, backfill and creep response.
因此这项功能可以用来模拟厚煤层,过分强调支柱,坝肩,回填和蠕变响应。
-
Backfill grouting is a key process during shield tunnel construction.
壁后注浆是盾构施工的关键工序。
-
Build high anti-seep vertical well dam backfill cannel and fill concrete,etc..
建筑高抗渗竖井,大坝回填槽,填充混凝土等
-
The jet-grouting is one kind uses the high-pressured water or the high-pressured size forms the high speed spraying striation. Impact, cutting, stave stratum soil body. Among and by the cement matrix size backfill, mixes mixes. Forms the pile or the wooden fence shape congealment body. With enhances the ground to guard against infiltrates or the bearing capacity construction technology.
高压喷射灌浆是一种采用高压水或高压浆液形成高速喷射流束,冲击、切割、破碎地层土体,并以水泥基质浆液充填、掺混其中,形成桩柱或板墙状的凝结体,用以提高地基防渗或承载能力的施工技术。
-
The paper makes an analysis on the main influence factors to mining subsidence in strip mining as well as the stability and function mechanism of backfill body in backfilling mining .
文中对充填采矿条件下的充填体的稳定性和作用机理进行了分析,并对条带开采条件下地表沉陷的主要影响因素进行了探讨。
-
Important natural geological analogues are volcanic glass and meteoric glass(anal-ogues of solidified mass), clay minerals (natural analogues of backfill material), iron meteorite and copper deposits (natural analogues of waste containers), natural nuclear reactors, uranium deposits, iron deposits containing Th and REE and contact zones between igneous rocks and other rocks (natural geochemical analogues of HLW repository).
目前已有的地质类比研究对象主要有火山玻璃,陨石玻璃,粘土矿物,铁陨石,铜矿床,铀矿床,含含Th和REE的铁矿床,天然核反应堆和火成岩接触带等。
-
According to special geological conditions of the beach-backfill area of the Donghai Great Bridge pier pre-fabrication field and construction time requirements, author provides a design plan and relevant consruction methods to construct a comprehensive whart under these special geological conditions.
针对东海大桥墩身预制场回填海滩区特殊的地质条件和工期要求,提出了修筑综合码头的设计方案和施工方法。
-
In the later half of the article, we adopt random analysis method to make preliminary study to the backfilled foundation and then analysis random influence factors that effect the settlement degree of gantry crane foundation. We used JC method to study the reliability of the settlement and Non-Uniform settlement degree of gantry crane foundation based on factors which influence the last settlement degree of railway foundation, and the same time, we utilized backfill construction parameter and the actual statistics data of earth backfilled on site.
本文后半部分,应用随机分析方法对该回填基础进行了初步的研究,分析了影响高架门机基础沉降量的随机影响因素,确定了沉降分析的计算模型,结合影响轨道基础最终沉降量的多种因素,利用施工现场实测回填土土性数值和回填施工参数,对高架门机基础沉降量和不均匀沉降进行了可靠性评价。
-
Has included filling of 3000 vials and stoppering on line; another stage included filling 3000 vials, transportation to the lyophilizer and then stoppering; a third stage included the filling of 3000 vials, loading in the lyophilizer, and exposure to a portion of the nitrogen flush and then stoppering.Since lyophilizer sterilization and sterilization of the nitrogen system used to backfill require separate validation, media fills should primarily validate the filling, transportation and loading aseptic operations.
第一部分是灌装3000瓶并且加塞,第二部分是灌装3000瓶,传递到冻干机中再全加塞,第三部分是灌装3000瓶,排放到冻干机内,暴露在氮气流下冻干机的灭菌和用于回填的无菌氮气系统分别进行验证,培养基灌装主要验证灌装、传递和摆放的无菌操作。
-
Mechanical tampers shall not be used until backfill in place is at least 600 mm over the pipe.
回填高度到管道之上至少600毫米处方才可以使用机械压土机。
- 推荐网络例句
-
In the negative and interrogative forms, of course, this is identical to the non-emphatic forms.
。但是,在否定句或疑问句里,这种带有"do"的方法表达的效果却没有什么强调的意思。
-
Go down on one's knees;kneel down
屈膝跪下。。。下跪祈祷
-
Nusa lembongan : Bali's sister island, coral and sand beaches, crystal clear water, surfing.
Nusa Dua :豪华度假村,冲浪和潜水,沙滩,水晶般晶莹剔透的水,网络冲浪。