查询词典 assembled
- 与 assembled 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Ludlow: Proprietary name of a display-size typesetting machine for which the matrices are assembled by hand and the type is cast in line slug.
勒德罗排铸机:标题字排铸机的专利名称。它用手工执排字模,然后铸成单个铅字。和。。。成直线,排成一行
-
Ludlow: Proprietary name of a display-size typesetting machine for which the matrices are assembled by hand and the type is cast in line slug.
勒德罗排铸机:标题字排铸机的专利名称。它用手工执排字模,然后铸成单个铅字。帕姆用手工缝了这件衣服。
-
The company's products for the mining, airports, military units, logistics and distribution, supermarkets and other units, through continuous improvement of design and manufacturing, has assembled, the overall combination of one Type Rack product line.
本公司的产品面向工矿、机场、部队、物流配送、超市等单位,经过不断完善的设计制造,拥有组装式、整体式货架组合一式产品系列。
-
Each time the troop assembled the leader counted nose.
部队每次集合时队长一定要清点人数。
-
One cycle of operation to take Silo body construction, the construction procedure as follows: steel banding to Silo body gantry beams assembled below -→ one-time pouring concrete 700mm high -→ early slide three trips (that is 75mm high)-→ check off the concrete slipform system appropriate degree and working conditions -→ continue pouring concrete 500mm high -→ then slip trip or three -→ pouring concrete to template missing -→ normal sliding each slide or 500mm high -→ stratified cross - lap steel banding -→ pouring concrete 500mm high -→ Waterloo or 500mm high -→ 4 in accordance with the procedure after Silo body pouring until the completion of cycle.
其中筒身施工采取循环作业,其施工程序为:绑扎筒身钢筋至组装好的门架横梁下面—→一次性浇筑混凝土700mm 高—→初滑三个行程(即75mm 高度)—→检查滑出混凝土合适度及滑模系统工作状况—→继续浇筑混凝土500mm 高—→再滑升三个行程—→浇筑混凝土至模板上口—→转入正常滑升,每次滑升500mm 高—→分层交圈绑扎钢筋—→浇筑混凝土500mm 高—→滑升500mm 高—→按后四道程序循环往复直至筒身浇筑完成。
-
One cycle of operation to take construction, the construction procedure as follows: steel banding to gantry beams assembled below -→ one-time pouring concrete 700mm high -→ early slide three trips (that is 75mm high)-→ check off the concrete slipform system appropriate degree and working conditions -→ continue pouring concrete 500mm high -→ then slip trip or three -→ pouring concrete to template missing -→ normal sliding each slide or 500mm high -→ stratified cross - lap steel banding -→ pouring concrete 500mm high -→ Waterloo or 500mm high -→ 4 in accordance with the procedure after pouring until the completion of cycle.
其中筒身施工采取循环作业,其施工程序为:绑扎筒身钢筋至组装好的门架横梁下面—→一次性浇筑混凝土700mm 高—→初滑三个行程(即75mm 高度)—→检查滑出混凝土合适度及滑模系统工作状况—→继续浇筑混凝土500mm 高—→再滑升三个行程—→浇筑混凝土至模板上口—→转入正常滑升,每次滑升500mm 高—→分层交圈绑扎钢筋—→浇筑混凝土500mm 高—→滑升500mm 高—→按后四道程序循环往复直至筒身浇筑完成。
-
Trigger unit is assembled on a separate removable base that also incorporates a trigger guard.
触发单元集成在一个单独的移动基地也纳入了扳机护。
-
December 7, 1939: The crew of the Streonshalh assembled between the two quadruple 21 (533mm) torpedo launchers on the stern of the Admiral Graf Spee.
1939年12月7日,商船Streonshalh号的船员被安排斯佩海军上将号的舰艉甲板,图中可见两具21英寸(533mm)的鱼雷发射器。
-
The top chord components of beam string structure are fabricated in factory and assembled on site.
该张弦梁上弦构件在工厂分段制作,现场拼装。
-
Cobalt phthalocyanine was synthesized and self-assembled on the surface of nanoscale tin dioxide (SnO2) by in-situ process, marked as i, and Co-O interaction was verified to conjugate axially between macromolecule and SnO2 in CoPc/SnO2.
报道了酞菁钴分子原位自组装于纳米 SnO2 颗粒表面, CoPc 大环分子与 SnO2 表面形成 Co—O轴向相互作用,测定了原位合成方法制备的 CoPc/SnO2与浸渍法制备 CoPc/SnO2间的结合特性,并进行了可见光光催化表征及 CoPc 敏化机理探讨。
- 推荐网络例句
-
The split between the two groups can hardly be papered over.
这两个团体间的分歧难以掩饰。
-
This approach not only encourages a greater number of responses, but minimizes the likelihood of stale groupthink.
这种做法不仅鼓励了更多的反应,而且减少跟风的可能性。
-
The new PS20 solar power tower collected sunlight through mirrors known as "heliostats" to produce steam that is converted into electricity by a turbine in Sanlucar la Mayor, Spain, Wednesday.
聚光:照片上是建在西班牙桑路卡拉马尤城的一座新型PS20塔式太阳能电站。被称为&日光反射装置&的镜子将太阳光反射到主塔,然后用聚集的热量产生蒸汽进而通过涡轮机转化为电力