查询词典 ash tray
- 与 ash tray 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The influences of the addition of ground limestone,fly ash and the mixed addition of ground limestone and fly ash on the chloride diffusivities of the high strength concrete are studied by using NT BUILD 492 method.
我国石灰石粉来源丰富,价格低廉,并已广泛用作水泥工业的混合材和混凝土的矿物掺和料。
-
A process of dosing 98% sulfuric acid into a neytralization tank built at the outlet of the ash ground of a heat & power plant was decided based on a study on the acid-neutralization treatment of the ash-bearing wastewater from the heat and power plant.
通过对热电厂冲灰水加酸中和处理方案的研究,确定了在灰场排放口建中和池投加98%H2SO4的工艺流程。
-
My company sells supplies (PE, PVDF fluorocarbon, SMP-modified, HDP Weather resistance, PVC) coating thickness: 0.18 0.326 0.35 0.376 0.4 0.426 0.45 0.476 0.5 0.526 0.55 0.576 0.6 0.7 0.8 0.9 1.0 1.2 1.5 2.0 Width: 760 914 1000 1200 1219 1220 1250 substrate: hot dip galvanized, electric galvanized,, cold rolling, bar-hard, hot bar Color: Cleansing gray, lightà, dark blue, light blue, satin ash, lead ash, carbon black , light gray white, sea blue, crimson,°×, horse plastic white, plain, stone white, brick red, sand yellow, dark gray, light blue, blue, Baoshan Iron and Steel blue, night blue, Baoshan Iron and Steel gray matter and white silver gray, light silver, bone white, imperial white, cloud white, green, barley white, light camel, silver gray, silver, ironà, sky blue, broad-leaved green, porcelain blue, ivory, orange,, Oxford blue, white and other colors can be customized according to customer color card.
我公司销售供应(PE、 PVDF氟碳、SMP硅改性、HDP耐气候性、PVC)彩涂厚度:0.18 0.326 0.35 0.376 0.4 0.426 0.45 0.476 0.5 0.526 0.55 0.576 0.6 0.7 0.8 0.9 1.0 1.2 1.5 2.0 宽度:760 914 1000 1200 1219 1220 1250 基板:热镀锌、电镀锌、镀铝锌、冷扎、扎硬、热扎颜色:洁面灰、浅青灰、深蓝、亮蓝、缎灰、铅灰、碳黑、浅灰白、海蓝、绯红、白灰、马胶白、浅白、石白、砖红、沙黄、深绿灰、浅青蓝、纯蓝、宝钢蓝、夜蓝、宝钢灰、白银灰、亮银、骨白、帝王白、云白、黄绿、大麦白、浅驼、银灰、银色、铁青灰、天蓝、阔叶绿、瓷蓝、象牙、橘黄、土黄、牛津蓝、雪白等,颜色可按照客户色卡定做。
-
The test results showed that the optimum conditions to adsorb the lead with fly ash were as followings:The time was 12 hours,the fly ash and waste water ratio was 1∶10,the pH value was 7.5,the temperature was 30℃.
试验表明,粉煤灰吸附铅的最佳条件为:时间为12h,灰水比为1∶10,pH值为7.5,温度为30℃。
-
By the result of study, if the furnace temperature can be controlled under about 950℃, the distribution of lead in fly ash and reaction ash might reduce 1.16% and 6.64%, and the TCLP leachate could keep under the regulation control standards.
由研究结果,若能於实厂操作时,透过一次及二次空气量之调节,将炉温控制於约950℃以下,降低飞灰与反应生成灰中铅分布比例1.16%、6.64%,其TCLP溶出量将可有效控制在法规之管制标准以下。
-
In addition, the three ashes of the chloride concentration were significant decline (18.9%→ 8.2%, 16.0%→ 6.7%, 2.3%→ 0.07%). The results showed that the lead of electrodeposition fly ash could pass TCLP standard limits, and the electrodeposition fly ash was worthful used as the resources.
另外在电沈积法的作用下,三种飞灰之氯盐浓度皆有明显的下降(18.9%→8.2%、16.0%→6.7%、2.3%→0.07%),且电沈积灰皆通过TCLP标准值,显示电沈积灰颇值得朝资源化再利用方向应用。
-
This paper systematically explores the strong character of lime-ash and the influence of the time forming the condition and containing water on the mechanical behavior of lime-ash.
但由于粉煤灰颗粒较细,含水量的大小会影响其粘聚力和内部结构及整体性,因此要严格控制掺入石灰的量、掌握好压实时间和含水量,来提高其抗剪强度、整体性和稳定性,增强软土路基的处理效果。
-
However, there are some difficulties in controlling lime-ash soil construction quality, especially the lime content , fewer researches are done to inspect lime content as well as lime content decaying in lime-ash soil and most inspections on the construction spot are based on lime-soil.
但是对于二灰土施工质量控制特别是灰剂量的控制难度较大,灰剂量的测定和二灰土灰剂量的衰减问题方面的研究较少,施工现场检测大多基于石灰土。
-
This paper studies the change of lime reduction of lime-ash soil under the following three conditions in an inside experiment,such as low temperature,stable temperature and exposed found. The relations among the different condition,lime content and ages in lime-ash soil construction process are drawn,which can provide reference for construction units to grasp its changes rules,and lay a foundation for making feasible construction plan and measurement criterion.
通过室内试验对二灰土在恒温箱低温养生、养护室标准养生和暴露养生这三种养护条件下石灰剂量的衰减规律进行试验研究,得出的二灰土底基层施工中养护条件、实测灰剂量与龄期之间的相互关系,可为施工单位掌握二灰土石灰剂量变化情况提供依据,并为制定出科学可行的施工组织计划和检测标准打下基础。
-
Lime-ash technique (cinder ash mixed with lime or cement) using for roadbed condition has many virtues.
用粉煤灰、生石灰填筑公路路基有许多优点,二灰土具有较高强度、整体性好、良好的水稳性和抗低温能力、施工方便、造价相对较为经济、提高土源利用率优点,因此,在北方具备条件的地方,比较广泛的采用二灰土这种材料作为道路底基层或基层,收到良好的经济与社会效益。
- 相关中文对照歌词
- Baraka
- Now Is The Time
- Ash And Ember
- Blunt Ashes
- The Ashgrove
- Sinkemlow
- I Luv It
- Big Truck Driver
- The Memory Remains
- The Pledge (Remix)
- 推荐网络例句
-
You can buy sweetened beverages, if that suits you.
你若喜欢的话,可以买些含有糖精的混合饮料。
-
As many of you are probably aware, Nick and Vanessa were recently faced with an embarrasing sex scandal after naked pictures of the two getting jiggy with it in a hot tub surfaced the net.
正如很多你可能知道,尼克和 Vanessa 最近面临一个尴尬的绯闻事件后,赤裸裸的图片两个越来越jiggy与它在浴缸中的一个热点浮现净。
-
The difference. But you don抰 use diagonals when photographing do you.
所以,如果你要摄影的话,请不要用天顶镜。