英语人>网络例句>arch bridge 相关的网络例句
arch bridge相关的网络例句

查询词典 arch bridge

与 arch bridge 相关的网络例句 [注:此内容来源于网络,仅供参考]

The arch bending on the top of the original main arch ring corresponds to every arch rib and the bottom beam on its landscape orientation. As a result it becomes a down arc frame similar to slab-and-beam floor system. On the arch bending and bottom beam just established, standing pillar, main beam, horizontal rib beam and bridge front-panel would be built subsequently. Both ends of the main beam would then be put off the new hat beam made of reinforced concrete. Now, it becomes an upper slab-and-beam floor system. Two decks will be joined together on the middle of the bridge, which forms the ability of spanning and loading.

在原主拱圈拱肋相应位置处增设拱伏,横向增设底梁,形成一个下层弧形的类似肋梁楼盖的结构;在已浇筑好的拱伏与底梁上,继续现浇立柱、主梁和横向肋梁、桥面板,主梁的两端搁置在桥台处新增加的钢筋混凝土台帽梁上,形成一个上层肋梁楼盖结构,并且上下两层楼盖在桥梁跨中互为渗透结合成一个牢固的整体,共同完成了跨越和承载的能力。

Products factory operators; Steyr, Steyr Wang, Hao Wo main bridge shell rear axle, bearing blocks, cross the bridge cover, Steyr wheel shell, shift cylinder, rear axle sudden yuan, ZF Clutch fork shaft, swing rod, before and after the brake hub, Steyr various separation fork, gear room covered ,67-68 pulley, bridge sudden yuan, steel plate, parallel to shell axis, double-H shift shaft , 0503 Steyr-axis between the shell bad, bad Steyr 0198 Inter-axis shell, oil seal and seat, steel plate before and after the hanging ears, rear wheel, shift box assembly, double H shift rocker, one, two block I. block F99588, shift box casing, drive shaft telescopic forks, steel slide, shift cylinder, a variety of connecting plates, gearbox sudden yuan, three, blockIntroduction F99589, Steyr cylinder cover, double-H shift dial head, adjust the lever fork, wheel cover, FL clutch fork, FL Clutch fork shaft, Steyr after the output shaft bearing support, flywheel shell, fork and seat connection, Steyr Cylinder Head,ácover ,67-68 water pipe joints, rear brake camshaft bracket, rear axle minus the main shell, minus the shell of the main bridge, bearing seat, adjust the lever forks, brackets, brake lane joystick arm, gearbox sudden yuan, clutch pedal arm, oil block at the end of care, single head, double-headed rocker, gear room covered, decelerationround, adjust the lever forks, shift box casing, double H shift dial head, Double H shell, gear room covered, separation lever plate before and after the hanging ears, double-H shift shaft, decelerationround,áBushing, Steyr 10 file clutch shell, the bridge box, minus the shell after the main bridge , Bearing Block, the bridge cover, Steyr wheel shell, shift cylinder, after the sudden the bridge element, ZF Clutch fork shaft, swing rod, steel slide, shift box casing series products .

本厂经营产品;斯太尔,斯太尔王,豪沃后桥主桥壳,轴承座,过桥箱盖,斯太尔轮边壳,换挡汽缸,后桥突元,ZF离合器拨叉轴,摆杆,前后制动毂,斯太尔各种分离拨叉,齿轮室盖,67-68皮带轮,中桥突元,钢板垫板,平行轴壳,双H换挡轴,斯太尔0503轴间差壳,斯太尔0198轴间差壳,油封及座,钢板前后吊耳,后轮毂,换挡盒总成,双H换挡摇臂,一,二挡导块F99588,换挡盒套管,传动轴伸缩叉,钢板滑座,换档汽缸,各种连接盘,变速箱突元,三,四挡导块F99589,斯太尔汽缸盖,双H换挡拨头,杠杆调整叉,轮边盖板,FL离合器拨叉,FL离合器拨叉轴,斯太尔输出轴后轴承座,飞轮壳,连接叉及座,斯太尔汽缸盖(欧II,平衡轴盖板,67-68水管接头,后制动凸轮轴支架,后桥主减壳,中桥主减壳,轴承座,杠杆调整叉,托架,行车制动操纵杆臂,变速箱突元,离合器踏板臂,油底托块,单头,双头摇臂,齿轮室盖,减速轮垫片,杠杆调整叉,换挡盒套管,双H换挡拨头,双H壳体,齿轮室盖,分离杠杆,钢板前后吊耳,双H换挡轴,减速轮垫片,平衡轴衬套,斯太尔10档离合器壳,过桥箱,后桥主减壳,轴承座,过桥箱盖,斯太尔轮边壳,换挡汽缸,后桥突元,ZF离合器拨叉轴,摆杆,钢板滑座,换挡盒套管等系列产品。

Of the top of the superior aortic recess extended to the level of the aortic arch from which the branchiocephalic trunk arises. At the level of the aortic arch, 100%of the lymph nodes of superior vena cava were located among the aortic arch, superior vena cava and trachea. At the level of azygos vein, 100%of the lymph nodes of azygos vein and the superior aortic recess were located among the superior vena cava, arch of azygos vein, trachea and concavity of aortic arch.

主动脉弓和奇静脉弓在同一横平面占20.00%±7.30%,40.00%±8.94%的奇静脉弓在主动脉弓凹面平面;②80.00%±7.30%的主动脉上隐窝上界位于主动脉弓右前端头臂干起始处;③在主动脉弓平面,腔静脉后淋巴结位于主动脉弓、上腔静脉和气管之间,出现率为100%;④在奇静脉弓平面,奇静脉弓淋巴结和主动脉上隐窝位于上腔静脉、奇静脉弓、气管和主动脉凹面所围成的气管前间隙内。

A brief discussion on seismic design of high arch dams is made through the following three aspects:interaction of arch dams-foundation-reservoir water,dynamic stability of high arch dam abutment ,effect of transverse slots on seismic design of high arch dam,and those aspects referred to above is not enough for seismic design of high arch dam.

对高拱坝的抗震设计进行了分析,包括拱坝坝体-地基-库水动力相互作用分析、高拱坝坝肩抗震稳定分析、横缝对高拱坝抗震设计的影响,仅对高拱坝抗震设计研究的几个方面进行了概括总结。

The stress and stability analysis of arch dam and abutment are the main task of traditional arch dam design. Nowadays there are two kinds of analysis method to use. One method is the arch-cantilever load-distribution method, in which the arch dam stress and abutment thrust are calculated, while the stability of abutment is evaluated by rigid body method or other method. The other is FEM method, which evaluates the arch dam stress and stability of abutment at the same time.

作为拱坝常规设计的主要任务—坝身和坝肩的应力和稳定分析,当今大体有两套体系可用:①用拱梁分载法分析坝身应力和坝肩推力,结合刚体法或其他方法进行坝肩稳定审核;②用有限元法对坝身应力和坝肩稳定同时进行审核。

The internal forces of the main arch springers are calculated in different rise-span ratios of top and bottom arch ribs. The internal forces of arch ribs and deformations of main spans are calculated in 1/5, 1/4 rise-span ratios of top and bottom stacked arch ribs and in 1/5 rise-span ratio of dumb-bell arch ribs.

给出上、下拱肋为不同矢跨比情况下的主拱拱脚截面内力,当叠合拱桥的上、下拱肋矢跨比分别采用1/5、1/4与矢跨比为1/5的哑铃拱拱肋的内力和主梁及拱顶变形计算结果。

A conclusion is given that the cable-stayed arch bridge is novel and artistic. It is more important that the arch axile force of the cable-stayed arch bridge may adjust, thus, the bridge may develop to the great span direction.

由此得到结论:斜拉拱组合桥不仅桥型新颖美观,更重要的是拱肋轴力可调,该拱桥桥型可以向大跨度方向发展。

According to the method of determining the safe thickness of arch ring which is reinforced by adding a new arch ring,this paper proposes a method for determining the thickness of inner arch ring under the arch bridge.

参照拱圈上增设拱圈叠合受力加固法新设拱圈厚度的确定方法,对拱圈下内套拱圈厚度的确定提出设想,对拱圈安全厚度提出建议和确定方法。

Backgrounded by the main bridge of Zhanhe River Bridge at Chengdonghe Road,Pingdingshan City,the software MIDAS/Civil is used to establish a 3-dimensional finite element calculation model for the double X-shape arch bridge and the effect of arch rib sloping angle changes on the dynamic performance of the type of the bridge is studied respectively for six design alternatives.

以平顶山市城东河路湛河桥主桥为工程背景,采用有限元软件MIDAS/Civil建立该桥的空间有限元计算模型,分6种设计方案研究了拱肋倾角变化对斜靠式拱桥动力性能的影响。

Six Bridge": Lu Chan wearing street railway bridge and highway bridge, railway bridge Beihuan wear, road wear of a road bridge, never to wear Western street railway bridge and highway and bridge construction of six bridges."

六桥":露禅大街穿铁路桥和公路桥、北环路穿铁路桥、名园路穿公路桥、永洋大街穿铁路桥和公路桥等六座地道桥建设。"

第2/500页 首页 < 1 2 3 4 5 6 7 8 9 ... > 尾页
相关中文对照歌词
Arch Your It
Kisses Down Low
Arch N Point
Arch & Point
London Bridge Is Falling Down
Caroline
Under The Bridge
Take It To The Bridge
My Arms Are The Brooklyn Bridge
Imagination
推荐网络例句

Finally it offers the analysis of the fault-tolerance system as well as its test verification.

这样,运行于空间环境中的系统的设计目标就是在保证系统实时性

However, it is still difficult to find out the real reason of the increase of the keratinized gingiva during the orthodontic extrusion whether it is due to the proliferation of the gingival tissue or to its elastic nature, that is because the proliferation of the fibroblasts as well as the connective tissue changes in volume and the intra-fibers spaces were all immeasurable in most of the studies.

然而,仍然难以找到真正的原因增加的角化牙龈在正畸挤压它是否是由于扩散的牙龈组织或其弹性性质,这是因为增殖的成纤维细胞以及作为结缔组织的变化量和内部纤维空格都是不可估量的,大多数的研究。

By east-west into the western mountain front or in Landrace, Xing'an Mountain front to forest-steppe sub-zone and Songnen plain black or plain meadow steppe chernozem Songnen sub-regions.

按东西向分为西部山前台地或长白、兴安山前台地森林草原黑土亚区和松嫩平原或松嫩平原草甸草原黑钙土亚区。