英语人>网络例句>air-heating 相关的网络例句
air-heating相关的网络例句

查询词典 air-heating

与 air-heating 相关的网络例句 [注:此内容来源于网络,仅供参考]

But when the flame went out, the air inside the bottle cooled and contracted . The air pressure outside the bottle was greater than the air pressure inside. That caused the egg, and some air, to get sucked inside.

但当火苗熄灭后,瓶里的空气冷却下来并开始收缩,此时瓶外的气压大於瓶内的气压,所以瓶口的蛋和部份空气便会被吸入瓶内。

Before fire lift room establishment positive pressure supply-air outlet, when after fire prevention alarm system warning, opens the related spot positive pressure supply-air outlet by the fire controller control, the linkage opening positive pressure air feeder, will possess the operation signal returns fire prevention control room; When opens the gusty area by the manual operation organization, can also the linkage opening positive pressure air feeder.

在消防电梯前室设置正压送风口,当消防报警系统报警后,由消防控制器控制打开相关部位正压送风口,联动开启正压送风机,将所有动作信号返回消防控制室;当由手动操作机构打开风口时,也能联动开启正压送风机。

Before fire lift room establishment positive pressure supply-air outlet, when after fire prevention alarm system warning, opens the related spot positive pressure supply-air outlet by the fire controller control, the linkage opening positive pressure air feeder, will possess the operation signal returns fire prevention control room; When opens the gusty area by the manual operation organization, can also the linkage opening positive pressure air feeder.

在消防电梯前室设置正压送风口,当消防报警系统报警后,由消防控制器控制打开相关部位正压送风口,联动开启正压送风机,将所有动作信号返回消防控制室;当由操作机构打开风口时,也能联动开启正压送风机。

The project area has three shopping malls in a row not to fight the fire area, with a total length of the circumference of more than 1 / 3, Road fire engines from the inside edge of the wing wall construction materials to highlight the edge of not less than 5.00m, and fire engines to meet the Road Fire The largest car turning radius of 12m, to fight the fire site with a width of 18m, and this is not tall tree planting; and fire fighting facilities of not more than 5% of the slope, fire engines, fire fighting facilities should be able to carry a large set of fire engines Weight; Combined air-conditioning unit: for department stores, supermarkets, large bays, such as the lobby room, a new unit set up wind, ventilation and air return, setting up a new, back to the wind and the proportion of exhaust valve, according to the outdoor temperature of the new regulation, the ratio of air return, Back to the water main unit based PI control valve and in accordance with return air-conditioning temperature valve opening.

本项目商场三个面设有不连续消防扑救面,总长度大于周长的1/3,消防车道内边路缘距建筑外墙突出物边缘不小于5.00m,且消防车道满足消防车最大12m 的转弯半径,消防扑救场地的宽度为18m,且此范围内没有种植高大乔木;此外消防扑救场地的坡度不大于5%,消防车道、消防扑救场地应能承载大型消防车的载重量;组合式空调机组:用于百货商场、超市、大厅等大开间房间,机组设新风、回风及排风,设新、回风及排风比例调节阀,根据室外温度调节新、回风比例,机组回水管设比例积分调节阀并根据回风温度调节水阀开度。

The air is divided into primary air, secondary air, burning rice husk, the one, secondary air ratio of 50:50, a cold wind from the furnace chamber 2 side of the water entering through the fabric wind deflector hood holes into the combustion chamber.

空气分为一次风、二次风,燃烧稻壳时,一、二次风之比为50:50,一次风从炉膛水冷风室二侧进入,经布风板风帽小孔进入燃烧室。

The new wind in the engine room within the system and return air mixture, and then dealt with by the combined air-conditioning unit will focus on air handling mixed after the state sent to the air supply.

新风在机房内与系统的回风混合,再由组合式空调处理机组集中将混合空气处理至送风状态后送出。

The main difficulty in maintaining the low-flying, right before the target stopped before there are some mountains, trees also more than the flying height, waiting for the alarm, flying low over the tree would die a hurry, here is a pattern even distracted skills tree from the woods and trees around the gap between the wearing, wearing a back end, failed several times, the requirements of high technology is,豁出去later, and is not even a few fighter planes like you play, the beginning fly, warning a short while, and soon the hills, two aircraft from put a red 4 missiles, missile thought more terrible, the result was even easy to flash, I saw a missile fly in front of the explosion really fun, in fact, the missile is a good hide, and more attention after the perspective to observe the missile position, when the missile away from you, almost 100 distance of 100 -200 m,(their estimate of the distance from there anyway) who has risen sharply and optional, you can play to stimulate the rapid decline in almost a sudden sharp rise in the ground, of course, elections are the rapid turn right turn left, air giant slalom, flip aircraft line, multi-练练, the computer is the point of missile小意思, nothing after playing air combat, interesting ah ~~~~ even the highest record was 28 to avoid a meeting, including surface-to-air missiles, the computer told me to fly by the tail I am thrown to the ground the trees the mountains 11 miles or a word and the computer novice and more air play than the simple low wear and more trees to the

难度主要在保持低空飞行,快到目标前有一些高山挡住,树还特别多,飞的比树高,等着报警把,飞的比树低想死着急,这里偶愣是用花样技巧,从树林里树与树的缝隙之间穿了过来,最后又穿了回去,失败几次,要求技术实在是高,后来豁出去了,不就是几架战斗机偶就跟你们玩玩,一开始就高飞,不一会报警了,快到山头, 2架飞机冲过来放了4导弹,原以为导弹多可怕,结果,被偶轻松闪过,看见导弹飞到我前面爆炸真好玩,其实导弹是很好躲的,注意多用后视角,观察导弹位置,当导弹离你差不多100-200米百距离,(自己估计的反正有段距离)可选者急速上升,还可以玩刺激急速下降快到地面时突然急速上升,当然选者急速右转左转,空中大回转,翻转飞机都行,多练练,电脑那点导弹完全是小意思,以后没事耍空战,有意思啊~~~~偶最高纪录是1次避了28枚导弹包括地对空,电脑跟我机尾飞被我甩在地上山上树上海里11次总之新手还是和电脑多玩玩空战比起超低空穿树简单的多的去了

1990S, I assume the hospital Second Ring Road, North Eastern, Western civil air defense engineering design, in particular with the General Staff Corps of Engineers four large-scale joint commitment to the national air defense projects -"Shuncheng Street air defense projects," the design was on the State's Air-defense Office Award for outstanding design.

九十年代,我院承担了北二环路东区、西区人防工程的设计,特别是与总参工程兵四所联合承担的全国大型人防工程――&顺城街人防工程&的设计被国家人防办评为优秀设计一等奖。

"The new car air-conditioning system maintenance self-Reading," a brief introduction of the new type of vehicle air conditioning system structure and working principle, detailing the common automobile air conditioning repair tools, instruments and equipment and its use will highlight the air-conditioning system maintenance, fault diagnosis and rule out the .

新型汽车空调系统检修自学读本》简单介绍了新型汽车空调系统的结构与工作原理,详细介绍了常用汽车空调检修工具、仪器设备及其使用方法,重点讲述了空调系统的检修、故障诊断与排除。

In the technology of the mobile air conditioning room,the heat barrier is used to isolate work- ers from the hot environment and the cooling air is supplied for the mobile air-conditioning room by the turbine- typed air cooler whose cooling source and ventilating power come from cooling energy and potential energy stored in the water in constant temperature zone.

矿井移动空调室技术的实质是利用热幛将作业者与环境隔离,再用一种水轮机式空气冷却器向移动空调室内供冷。水轮机式空气冷却器的冷源和通风动力均来自矿井恒温带。通过实验得知:环境温度为32℃时,以1.6 m~3/h的速度供给水温为18℃的冷水启动空气冷却器10 min后,矿井移动空调室内干球温度可降至24℃;空气冷却器停止工作后30 min,矿井移动空调室内的空气温度仍可维持在28℃以下

第35/100页 首页 < ... 31 32 33 34 35 36 37 38 39 ... > 尾页
相关中文对照歌词
Air For Life
What Temperature Does Air Freeze At?
Love Is In The Air
The Air That I Breathe
Lighter Than Air
Still No Air
Air & Angels
I Feel Something In The Air (Magic In The Air)
Di Mata Air Tidak Ada Air Mata
Nike Air (Hands In The Air)
推荐网络例句

Singer Leona Lewis and former Led Zeppelin guitarist Jimmy Page emerged as the bus transformed into a grass-covered carnival float, and the pair combined for a rendition of "Whole Lotta Love".

歌手leona刘易斯和前率领的飞艇的吉他手吉米页出现巴士转化为基层所涵盖的嘉年华花车,和一双合并为一移交&整个lotta爱&。

This is Kate, and that's Erin.

这是凯特,那个是爱朗。

Articulate the aims, objectives and key aspects of a strategic business plan.

明确的宗旨,目标和重点战略业务计划。