英语人>网络例句>air time 相关的网络例句
air time相关的网络例句

查询词典 air time

与 air time 相关的网络例句 [注:此内容来源于网络,仅供参考]

Small noises and high performance air-tightness: the door is adopting the two-ties conductor rails and PVC close fitting strip, so it avoids of intermetallic attrition; at the same time, it is assured of close-fitting strip of the door.

噪音小、密闭性能高:门框由于采用双重导轨(钢导轨及 PVC 导轨)并加 PVC 密封板,这样就避免了金属间的磨擦而造成的噪音及对门漆的破坏、同时又保证了门的整体密封性。

Services at home part-time professional cleaning range hood clean professional wood floor waxing and nursing home kitchen clean, oil and surface cleaning leather sofa cleaning, care, maintenance of air cleaning, maintenance, repair the family to move around the wasteland clean clean clean factory wasteland testing room, car pollution ( Such as: formaldehyde, benzene, ammonia exceeded) Indoor pollution treatment carpet cleaning, chemical carpet cleaning house cleaning external cleaning the family, shopping malls, office cleaning and monthly Iron and Steel Co., rust wall paint renovation renovation beauty, nutrition consultant professional beauticians-site service providers, long-short-haul freight moving business to undertake 1.5T and 0.8T

服务项目家居清洁卫生钟点专业清洗抽油烟机专业家居实木地板打蜡及护理厨房清洁、油面清洁真皮沙发清洗、护理、保养空调清洗、保养、维修家庭开荒清洁搬家前后清洁工厂开荒清洁检测室内、车内污染室内污染治理地毯清洁、化纤地毯清洁别墅清洁外墙清洗家庭、商场、写字楼清洁及包月钢铁制品除锈翻新装修工程墙面粉刷美容、营养咨询顾问专业美容师上门服务提供长短途货运1.5T和0.8T承接搬家业务

Through the flue gas and air characteristic analysis in supercharged boiler,the results showed that the value of parameters would increase with the increase of fuel consumption.And volume heat load of the furnace, fuel consumption, heat change between flue gas and convective heating surface and evaporation value would increase with the increase of compression ratio.The heat calculation would be different because of dissimilar thermal calculation in the turbo-compressor when the boiler load was changed.As the boiler load increased,heat loss in the turbo-compressor would increase and the efficiency of the boiler would decrease.The results of the boiler start-up simulation showed that the time of start-up would decrease with the increase of flue consumption ,but instantaneous pressure amplitude would increase.Steam water"s dymamic diversification would be more complex than flue gas"s,and dynamic characters of their parameters would be changed due to different boiler load and disturbance variable,which was shown by results of the simulation when boiler load was changed.

通过分析增压锅炉内的空气、烟气参数特性,发现随着锅炉负荷的增加,空气和烟气的各项参数值都相应的增加;炉膛容积热负荷、锅炉的燃料负荷随着增压比的提高成比例增加;随着增压比的增大,烟气与对流受热面的换热增加,蒸发量随之增加;由于涡轮增压机组在不同负荷下的热力计算不同而造成增压锅炉在不同负荷下的热平衡计算的不同;锅炉增压机组的总的热损失随着锅炉负荷的增加而增加,而增压锅炉的热效率随着锅炉负荷的增加而减少;锅炉启动模拟仿真结果中发现,锅炉启动时燃料量增加,锅炉的启动时间就会减少,但是瞬时升压速度会增加;而动态负荷变化模拟仿真结果中发现,锅炉汽水侧的变化相比烟气侧更为复杂,且在不同负荷和不同扰动量下,烟气侧和汽水侧的重要参数动态特性是不同的。

When the air flux was different function of time, integral of pressure change was different.

我们的理论推导结果表明,描记箱内压力积分并不与空气的容量变化成正比,而受输入空气容量和频率共同影响。

From the above seems to show the failure, the author estimated that the fault is mostly the work of the subsidiary CRT circuit damage occurred because the cathode-ray tube voltage of the focus is very prone to failure similar to the above phenomenon, the phenomenon that gave rise to such failure is due mainly to display work over time, then the CRT focus very near the jack attached to a lot of dust very easily, which encountered wet dust easily lead to the air tubes of focus very significantly decrease the performance of socket contacts, then a cathode-ray tube focus to the natural voltage decline will be affected down, so that we could monitor the performance will be prone to poor focus, image display is a relatively vague.

从上面的显示故障现象来看,笔者估计该故障现象多半是显像管附属的工作电路发生了损坏,因为显像管的聚焦极电压十分容易发生类似上面的故障现象,引起这种故障现象的原因主要是显示器工作时间一长,那么显像管的聚焦极插孔附近很容易附着不少灰尘,这些灰尘遇到潮湿的空气后容易导致显像管的聚焦极插孔接触性能大大下降,那么一来显像管的聚焦极电压自然就会受到影响而下降下来,这样的话显示器也就容易出现聚焦性能不好、图象显示比较模糊的现象了。

Asked for help a 3 D with stronger PSP function, the machine body of this time's setting up a mold would be very outstanding, currently 《the 皇 card air battle X 》of show up a machine body an amount to still can not know so far, but DSuperTomcats F-14, TornadoF3,, F2-a and Foxhounds MIG-31s 4 will be definitely to show up collectively.

借助了PSP较强的3D机能,本次的机体建模将会十分出色,目前为止《皇牌空战X》的登场机体数量目前还不得而知,但F-14DSuperTomcat,TornadoF3,,F2-a以及MIG-31Foxhound四架集体将会铁定登场。

Our company has manufactured the tester and automatic assembly line for Mini Circuit Breaker, moulded case circuit breaker, frame circuit breaker, AC contactor, time relay, thermal relay, protector, leakage protector, Explosion-proof, UL Authentication specialization equipment, HV/LV complete sets, Fuse, Button indicator,Air operated part etc. for 19years, passing through ISO9001 Quality Management System Authentication firstly in 2002 and has been evaluated as the advanced unit many times.

我们浙江永光检测设备有限公司专项供应小型断路器、塑壳断路器、框架断路器、交流接触器、时间继电器、热继电器、保护器、漏电保护器、防爆电器、UL认证专用设备,高、低压成套电器、容断器、按钮指示灯、气动元件等检测设备、试验设备、自动化流水线设备、校验台专业19年,2002年通过ISO9001质量管理体系认证并多次被评为先进单位。

Your customers might not care that you have a 97% on-time delivery rate for air freight if they sell a bulk product that can only go by ground.

您的客户可能不会在意你有97 %的按时交货率为空运如果他们出售散装产品,只能通过地面。

Maybe now you'll have more time to get out in the fresh air.

可能现在你有更多的时间外出了。

Maybe now you'll have more time to get out in the fresh air.

也许你现在有更多的时间出去呼吸新鲜空气。

第87/100页 首页 < ... 83 84 85 86 87 88 89 90 91 ... > 尾页
相关中文对照歌词
Christmas Time Is In The Air Again
推荐网络例句

The split between the two groups can hardly be papered over.

这两个团体间的分歧难以掩饰。

This approach not only encourages a greater number of responses, but minimizes the likelihood of stale groupthink.

这种做法不仅鼓励了更多的反应,而且减少跟风的可能性。

The new PS20 solar power tower collected sunlight through mirrors known as "heliostats" to produce steam that is converted into electricity by a turbine in Sanlucar la Mayor, Spain, Wednesday.

聚光:照片上是建在西班牙桑路卡拉马尤城的一座新型PS20塔式太阳能电站。被称为&日光反射装置&的镜子将太阳光反射到主塔,然后用聚集的热量产生蒸汽进而通过涡轮机转化为电力