查询词典 admissible deformation
- 与 admissible deformation 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Based on the analysis of the factors caused land subsidence, the internal mechanism and development process of land subsidence caused by two mainly factors of dewatering and underground mining have been studyed in this thesis. The random medium model and methods have been established to calculate the land subsidence and deformation caused by dewatering or underground minging and both of them. The prediction problem of land subsidence and deformation caused by single factor and many factors has been solved.
本文在分析引起地面沉降原因的基础上,针对引起地面沉降变形的主要因素——地下水疏降和固体矿物开采,分析、研究了其引起地面沉降变形的内在机理和发展过程,推导出地下水疏降和地下固体矿物开采引起的地面沉降变形计算的随机介质模型,给出了具体的计算方法和计算步骤,并将固体矿物开采和岩土体疏水等导致地表沉降视为相互独立的事件,解决了固体矿物开采和地下水疏降共同作用下的地面沉降变形的线性叠加计算问题。
-
When forming temperature is 350℃ and deformation degree is less than 70%, deformation degree rise accompany the crystal grain minishing; upward 70%, working a recrystallization.
当变形温度控制在350℃,变形量小于70%时,随变形量增大,晶粒被细化,且第二相呈弥散分布;超过70%,也将发生再结晶。
-
Applied the balanced cross-section technique to explain the characteristics of Kuqa rejuvenated foreland basin nappes and its structural shorten distance, and applied the structural triangle deposition bed discussed the time of structural deformation, that is structural deformation time in north older than in south area in Kuqa depression.
建立了库车再生前陆盆地6种局部构造变形的地质模型;利用平衡剖面技术解释了库车再生前陆冲断带,查明了构造变形特征和地层缩短量;研究了库车再生前陆盆地构造变形时间,探讨了前陆冲断带造山运动的特征和规律,指出库车前陆冲断带构造变形自北(25Ma)向南(2.5Ma)依次变新。
-
By studying the deformation and evolutionary sequences around the Panshan granitic pluton, east-central Yanshan orogenic belt, and 40 Ar/ 39 Ar thermochronological test and analysis,we present the structural evolutionary process of the overlying strata before pluton intruded as well as it was intruding. The sequences of regional deformation are as follows: before the intrusion of Panshan granitic pluton, the N-S trend contraction in the east-central Yanshan orogenic belt took place, which resulted in the regional EW-trending Malanyu multi-fold and Jixian thrust fault; then Panshan granitic pluton intruded into the south limb of the Malanyu multi-fold and cut-through the Jixian thrust fault; later, the reactivity of the Jixian thrust fault cut off the synclines around thePans han granitic pluton.
通过对燕山东段盘山花岗岩岩体周缘构造变形特征、演化过程的研究,并结合40Ar/39Ar 热年代学测试和分析,提出盘山岩体侵位前、侵位时其上覆岩层的构造演化过程:三叠纪末(210-200 Ma)盘山岩体侵位前,燕山中东段受南北向挤压作用形成了近东西向的马兰峪复背斜和蓟县逆冲断裂;盘山岩体侵位于先期形成的马兰峪复背斜南翼,并侵蚀了蓟县断裂;蓟县断裂的后期再次活动截切了盘山岩体的周缘向斜。
-
This paper addresses deformation of tree swaying by presenting a new method which combines fractal with physical mechanics deformation.
针对树在风中的摇曳变形,提出了一种将分形技术和物理力学变形技术相结合的方法。
-
In addition, the separation deformation of roof at the grotto recess is also very obvious in rheologic numerical simulation; and the phenomenon is similar to the apparent form of in-situ deformation.
此外,流变模拟分析中出现在洞室深部的顶板离层也十分明显,这一现象与现场观察到的农观变形形态比较相近。
-
When the percentage composition of Cu is high (40-50 mass %), little deformation appeared in W phase, while main deformation occurred in Cu phase.
当铜含量比较高(Cu质量分数40%~50%)时,挤压过程中钨相形态基本不发生改变,主要是铜相变形。
-
On the side of exterior deformation monitoring, this dissertation proposes and proves the utility monitoring scheme by using general ground monitoring technology and the method of simplification differentiation polar coordinate survey for large span space structure deformation monitoring. On the side of stress measurement, this dissertation proposes an new method of stress measurement suit for mass concrete triangular frame and discusses shrinkage and creep of concrete how to influence stress measurement, and sets up finally a process how to calculate concrete stress through data for piano wire sensors. Finally, on the side of cable forces measurement, this dissertation discusses principle and measurement technology of frequency method.
在外部变形测量方面,本文提出并验证了一套利用常规地面监测技术监测大跨度空间结构几何变形的实用方案及一种简化的差分极坐标测量方法;在应力测量方面,本文提出了一种适用于大型混凝土三角刚架应力监测的新方法,研究了混凝土的收缩徐变对应力测量的影响,并在此基础上建立了一套由振弦式传感器的测试数据推算混凝土结构应力的流程;在索力测量方面,本文探讨了频率法测量索力的原理及实用测量技术。
-
A finite element numerical model for arch dam-gravity pier-foundation system was established to evaluate the effect of high gravity piers on the stress, deformation and anti-sliding stability of Sizhai arch dam, taking the following factors into account, such as the possible elastoplastic deformation of foundation rocks and the nonlinear interaction between the interfaces of gravity pier-dam foundation, the joint surfaces beneath the right bank, and the interfaces of arch dam-gravity pier.
摘要为评价高重力墩对四寨拱坝的应力变形和抗滑安全的影响,建立了拱坝-重力墩-地基系统的有限元数值模型,其中考虑重力墩-基础、右岸夹层和拱坝-重力墩等交界面的非线性相互作用,以及基岩材料的弹塑性变形行为。
-
Of its light weight, small size, easy to install in the HQ44/45X slightly resistance ball-Like check valve flange between the valve-house by two semi-circular springs and board composition, with the pin fixed to the valve on the valve plate to close the spring deformation, fluid pressure exerted by the spring to open the deformation rapidly, so to protect pipelines from water hammer damage.
其重量轻,体积小,容易安装在法兰之间,阀门内部由两个半圆弹簧和板面组成,用销子固定在阀体上弹簧形变使阀板关闭,流体压力又使其开启弹簧的形变很快,这样能保护管道免受水锤破坏。
- 推荐网络例句
-
We got alerted a couple of times while we were down south that HETs were on the way to bring us back up north because things were going to go hot again, but it was just rumors.
南下的途中我们不只一次得到警告说重型装备运输车将拉着我们重新北上,因为局势正在变得重新紧张起来,但这只是谣传。
-
It's the one where they find the ghost in the salt mine.
这一集是演他们在盐矿找到鬼
-
Stamens 6, inserted at base of perianth tube, included; filaments short; anthers basifixed. Ovary ovoid-globose, 3-loculed; ovules several per locule.
雄蕊6,着生的在花被基部筒部,内藏;花丝短;花药基着子房球状卵球形,3室;胚珠数个每室。