英语人>网络例句>according to schedule 相关的网络例句
according to schedule相关的网络例句

查询词典 according to schedule

与 according to schedule 相关的网络例句 [注:此内容来源于网络,仅供参考]

Based on fouling monitoring of boiler,this papers studied on method based on minimal cleanliness factor to determine sootblowing opportunity, method based on best frequency to calculate critical cleanliness,method base on the principle of maximal heat income caused by sootblowing to determine sootblowing period, method based on the principle of safety first to determine sootblowing schedule. All the above methods together can determine the correct schedule to sootblowing system.

基于锅炉各受热面的实时监测模型,本文在保证设备安全运行的前提下,从经济性出发,提出了基于临界清洁因子确定最佳吹灰时机和根据吹灰收益最大原则确定最佳吹灰周期,并给出基于吹灰最佳频率确定临界清洁因子的方法,给出制定合理的吹灰方案的步骤。

In this paper, myopic task schedule algorithm has been developed based on original task schedule algorithm, and its behavior has been simulated and its efficiency has been analyzed.

本文在普通任务调度算法的基础上提出了近视眼任务调度算法,并对近视眼任务调度算法进行仿真实现和性能分析。

Any continuous series of schedule activities connected with Logical Relationship s in a Project Schedule Network Diagram .

在项目进度网络图中,通过逻辑关系连接起来的任何连续的进度活动序列。

The collection of schedule activity dependencies that makes up a Project Schedule Network Diagram .

项目进度网络图中各进度活动之间的依赖关系的总称。

A calendar of working days or shifts that establishes those dates on which schedule activities are worked and nonworking days that determine those dates on which schedule activities are idle.

规定开展进度活动的工作日或班次和不开展进度活动的非工作日的日历。

Provide the POP package for each store, including design materials, detailed instructions, installation schedule, price list, color proof, etc., to the schedule required.

制作各店促销物料包,包括设计文件、详细的操作指令及安装时间、小样、价格单等,并在规定的时间内快递到店面。

Dynamic programming algorithm was introduced to solve the problem. Based on discussion of calculation complexity and effectiveness, the exact DP Algorithm was successfully used in operative schedule of the collecting bucket in multi-car-single-layer mode, which has few service nodes. For problems with large number of service nodes, restricted DP algorithm was constructed to avoid rapid expand in calculation and memory demands during programming process. The restricted DP algorithm, successfully used in single-car-multilayer and compound service modes, gets balance between near optimal programming results and reasonable programming time, so as to meet the real time schedule demands.

文中首先在TSP-STW问题的动态规划模型基础上,论述了计算机精确动态规划解法的求解策略和方法以及算法的有效性和复杂性,并将其成功应用于服务节点数相对较少的多小车单层配药服务模式中集中料斗的集药动作规划;在进行服务节点数较多的单小车多层服务模式中取药小车的运动规划时,为限制计算量和存储空间需求的迅速膨胀,引入以合理限制动态规划算法在每一阶段保留的最大状态元素数为核心的有限动态规划法,以便在求解结果的优化程度和规划时间上取得均衡,达到实时调度的要求。

Compare to current schedule method,TIN-based node schedule considers spatiality as well as dynamics of field data,through which energy consumption of wireless communication is reduced as well as accuracy of generated field is guaranteed.

不同于已有的调度方法,此方法综合考虑了感知数据的动态性和空间性,减少了无线传输的电量消耗,同时保证了生成数据场的精度。

This paper establishes the schedule risk analysis model of network planning. Based on the simulation method, schedule estimate and statistical distribution of projects are given, then the risk distribution of total period is obtained.

网络计划的仿真就是在计算机上模仿工程系统实际执行中的运行状态,并对工程系统在整个运行期间内状态的动态变化进行观察和统计,使人们从仿真结果中了解系统的基本特性。

Contractor's construction schedule with the schedule of values, list of subcontractors, submittal

协调好承包方的工程进度计划表与工程分项价值表,分包商列

第3/100页 首页 < 1 2 3 4 5 6 7 8 9 ... > 尾页
相关中文对照歌词
Tô Maluco Por Você
Cancel
Cachorro Eu Tenho Em Casa
Hoje
Amar Não É Pecado
According To You
Tô De Cara
Be It Unto Me
Rosas, Versos E Vinhos
Pac Man
推荐网络例句

The dissecting of samples in group2 were difficult. The root of pulmonary artery and ascending aorta failed to be unfolded because fibrous tissue was tough, right and left fibrous trigone were too firm to be solved by hand. Cardiac muscle fibers couldn't be stripped along myofibrillar trajectory since they were prone to break because of their friability.

组2的心脏解剖困难,表现为纤维组织坚韧,游离肺动脉非常困难;徒手无法松解左、右纤维三角,肺动脉和主动脉根部的游离非常困难;心肌纤维坚硬、质脆,解剖时容易断离成碎块,无法沿纤维走行方向剥离。

We have battled against the odds in a province that has become increasingly violent.

我们对在一个争夺日益激烈省的可能性。

MILAN - The team has left for the States at 10.15am CET from Terminal 1, Milan Malpensa airport. The Rossoneri will land in New York at 12.50am local time (6.50pm CET), after a nine-hour flight.

米兰—球队在上午10:15从米兰马尔朋萨机场第一登机口登机,出发前往美国,预计于纽约时间上午12:50降落(意大利时间下午6:50),飞行时间大约9个小时。