英语人>网络例句>abutment pier 相关的网络例句
abutment pier相关的网络例句

查询词典 abutment pier

与 abutment pier 相关的网络例句 [注:此内容来源于网络,仅供参考]

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

Through the comparative analysis of the earth pressure calculated by the different calculation methods, it is known that when the earth pressure behind the abutment of the integral abutment bridge under the action of rising temperatures is calculated, it is not proper to use the m method to calculate the resistance coefficients of the abutment back wall and column earth while the resistance coefficient of the abutment back wall earth can be calculated by the Broms method. It is proper that the resistance coefficients of the earth of the abutment and pier piles should be considered by the p-y curve.

通过对不同方法计算的台后土压力的对比分析,得知:在计算升温引起的整体式桥台桥梁台后土压力时,桥台背墙及台柱土的水平抗力系数计算采用m法是不适合的;桥台背墙后填土的水平抗力系数可采用Broms法计算;土对台桩及墩桩侧的水平抗力系数按p-y曲线来考虑是适合的。

The stress and stability analysis of arch dam and abutment are the main task of traditional arch dam design. Nowadays there are two kinds of analysis method to use. One method is the arch-cantilever load-distribution method, in which the arch dam stress and abutment thrust are calculated, while the stability of abutment is evaluated by rigid body method or other method. The other is FEM method, which evaluates the arch dam stress and stability of abutment at the same time.

作为拱坝常规设计的主要任务—坝身和坝肩的应力和稳定分析,当今大体有两套体系可用:①用拱梁分载法分析坝身应力和坝肩推力,结合刚体法或其他方法进行坝肩稳定审核;②用有限元法对坝身应力和坝肩稳定同时进行审核。

The Broms method, m method and p-y curve method are respectively used to calculate the horizontal resistance coefficient of the filled earth behind the abutment back wall, the m method and p-y curve method are used to calculate the resistance coefficients of the earth around the abutment column and at the sides of the abutment and pier piles. The TDV software is used to simulate the restraint of the earth to the piles ends.

分别采用Broms法、m法及p-y曲线法计算桥台背墙后填土的水平抗力系数;采用m法及p-y曲线法计算台柱土的水平抗力系数和台桩、墩桩侧土的水平抗力系数;采用TDV软件模拟土对桩端的约束作用。

Based on the study achievements of some predecessors,bridge,pier and abutment were simulated by solid element,rail and sleeper were simulated by space beam element,the links of rail,sleeper,bridge,pier and abutment were simulated by spring element,a three-dimensional finite element spatial mechanics model for calculating the rupture force between continuously welded rail and high-speed railway bridge was established.

在吸收前人研究成果的基础上,采用实体单元模拟桥梁及桥梁墩台,采用空间梁单元模拟钢轨及轨枕,采用弹簧单元模拟钢轨、轨枕、桥梁与墩台之间的连接,建立了断轨三维有限元空间力学模型。

A three-dimensional finite element spatial mechanics model for calculating the additional longitudinal force transmission between continuously welded rails and high-speed railway bridges is established by using solid element to simulate bridges as well as pier and abutment,using space beam element to simulate rails,using spring element to simulate the link between bridges and tracks as well as pier and abutment.

采用实体单元模拟桥梁及桥梁墩台、空间梁单元模拟钢轨、弹簧单元模拟桥梁与墩台及轨道之间的连接,建立梁—轨纵向相互作用三维有限元空间力学模型。以丰沙线永定河单线铁路桥梁、秦沈线沙河双线铁路桥梁对其进行计算验证。

The main method of reinforcement pier is use different materials in the external of damaged pier, but in most of case, the damaged pier cant be repaired in time, so in this paper, we can solute such questions through architectonics so that the bridge pier capacity can keep from loss largely.

现有的加固方法主要是利用不同的材料在外部对损伤的桥墩进行加固,但是在很多情况下,桥墩不能够及时进行加固处理,所以本文通过构造性的设计方案,来解决在不能及时加固情况下,桥墩承载力不至于有较大的损失。

The invention has the advantages that by means of single film growth craft, supporting structures of a pier, a bridge leg, and a deck are accomplished, thus greatly lowering the difficulty and complicity of the craft; the pier, the bridge leg, and the deck are formed into a trinity, thus assuring the mechanical support of the whole micro bridge to be firmer and to have higher stability; meanwhile, the pier manufactured by means of the single film growth craft has a hollow shape, thus ensuring that the manufacturing process of the electrical channel of the micro-bridge structure is more simple, without the need of tapping in the pier; only simple photoetching craft is needed to guarantee the connection between the electrode at the upper end and the electrode at the lower end.

本发明利用一次薄膜生长工艺完成桥墩、桥腿和桥面的支撑结构,大大降低了工艺难度和复杂性,且桥墩、桥腿和桥面三位一体,使得整个微桥的机械支撑更为牢固,稳定性更高;同时,本发明利用一次薄膜生长工艺制作出的桥墩成空心状,使得微桥结构的电学通道制作过程变得更为简单,无需另外在桥墩中开孔,只需简单的光刻工艺即可保证上端电极和下端电极相连。

Analyse the distributive law of shear-lag effect and influence of each structural parameter: pile length , bending stiffness of pile, bending stiffness of abutment, abutment length, different type of soil behind abutment, curve radius, width to span ratio,width of beam, etc. And the main influencing parameters were picked up.

进行结构参数分析,研究等代桩长、桩的纵向抗弯刚度、桥台纵向抗弯刚度、桥台高度、台后土压力、曲率半径、宽跨比及箱梁肋板间距等对剪滞系数的影响,从而得到影响无伸缩缝曲线箱梁桥剪力滞效应的主要参数和次要参数。

第1/57页 1 2 3 4 5 6 7 8 9 ... > 尾页
相关中文对照歌词
Lido Pier Suicide Car
Gulf Winds
Love At The Pier
The Shortest Pier
4th Of July, Asbury Park (Sandy)
Drink A Beer
Way Down Here
Hunstanton Pier
How Come You're Not Here
Soul Inmate
推荐网络例句

The work of this paper is as follows: 1. Looking back the progressing history of the linear motor, introducing the features of the elevator driven by linear induction motor, radicating the topic of this paper "the digital frequency variable control of the elevator bi-side direct driven by linear induction motor". The research of this paper covers the conventional VVVF control, space vector based VVVF control, vector control and DTC.

本文主要开展了以下几个方面的工作: 1 回顾了直线电机发展历史,电机的驱动技术演变,特别是针对直线电机的驱动,简要介绍了直线感应电机驱动电梯的优点和不同结构类型,对传统的v/f控制,基于空间矢量法的v/f控制,矢量控制,和基于电压空间矢量的直接转矩控制进行了比较,确立了本课题的研究主题:直线感应电机双边直推式驱动电梯的全数字变频控制。

The article combines with the treatment of a superficial civil air defense work to introduce how the grouting method to improve the performance of the backfill soil.

文章从治理漂浮人防工事的角度提出了注浆技术在改善回填土性质方面的应用,并详细阐述了注浆技术的施工流程。

I knew nor shyness nor fear, my life was boisterous.

我不懂得羞怯和惧怕,我的