查询词典 Victoria embankment
- 与 Victoria embankment 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Therefore,test and research on subgrade treatment of cataclastic expansive rock,retaining and protection of high cut slope in crushing and weak rock,and new retaining structure types of high embankment slope,such as piles-plate wall of prestressed anchor wire,reinforced earth retaining wall of new type straps,are conduc.
对此,开展了碎裂膨胀岩路基边坡处理、破碎软岩路堑高边坡挡护和路堤高边坡新型支挡结构(锚拉式桩板墙,新型拉筋加筋土挡土墙)等项结合工程的科研试验,取得突出成果,为南昆铁路的顺利建成和安全运营提供了科学依据。
-
The Coquitlam Dam, constructed in 1913, is a 30 m high hydraulic fill embankment dam.
Coquitlam大坝建于1913年,坝高30 m,为吹填土石坝。
-
Through indoor tests and field tests this paper has researched the geogrid' s characteristics of application in highway engineering, such as characteristic of intension, creep, endure, damnify in construction etc.. Based on these researches this paper has also researched the working characteristics of contact face between geogrid and soil and the method of geogrid-reinforced slope analysis. Mechanism of geogrid-reinforced slope has been analyzed. In the end , techniques of geogrid-reinforced embankment' s construction has been researched through substantiality of engineering.
文章通过室内、外试验,对土工格栅的强度特性、蠕变特性、耐久性能及抗施工损伤性能等工程应用特性进行了研究;在此基础上,结合室内试验和理论分析对土工格栅与土的界面工作特性和加筋边坡的稳定性分析方法进行了研究,对土工格栅加筋边坡机理进行了分析;最后结合实体工程,对土工格栅加筋陡边坡的施工工艺进行了系统研究。
-
And as a result of geothermal field dissymmetry and geometrical dissymmetry of slant slope embankment, the road deformation becomes dissymmetrical too.
由于路基地温的不对称和斜坡路基的几何不对称,引起了路基变形的不对称。
-
Simulation results verify that insulated board can effectively protect the heat from transferring into the foundations, and the frozen table is always around the lower bottom of the boards; the position of the frozen table with insulated boards is higher than that of without; the embank- ment formation has a better effect on the center of embankment, the shoulder and toe of the roads than others; after consideration of the construction effect, the best lay out of the insulated boards is higher than the position of natural ground surface to 0.3-0.6 m; this formation of the embankments is the right effective constructer to be used in the permafrost on the Qinghai-Tibet railway.
通过数值模拟可知:保温板能够有效地阻止热量由路基面向下传入地基中,使0℃等温线始终在保温板底层;复合路基多年冻土上限的位置要比无保温板时的高;该结构形式对路基中心、路肩和坡脚下的多年冻土上限抬升的综合效果更好;考虑施工条件后,复合路基在保温板铺设距离天然地面之上0.3~0.6 m对于路基稳定性最为有利;该路基结构形式为青藏铁路多年冻土区路基的理想结构形式,有利于克服全球变暖的影响。
-
Shantou will ensure completion of part of the sea embankment enrockment and hydraulic reclamation works in Xinjin and Xinxi areas.
确保今年底新津和新溪等片区完成部分海堤抛石和部分围内吹填工程。
-
In addition, your baby's mouth small and shallow, swallowing reflex function is not perfect, will not be used to regulate the movements of swallowing saliva, so when the little saliva or baby happy, laugh and play, you may be unable to secrete saliva from All swallowing it, and diffuse over embankment, the outflow of extraoral.
再加上宝宝的口腔小而浅,吞咽反射功能还不健全,不会用吞咽动作来调节口水,所以当唾液分泌稍多或是宝宝高兴、嬉笑时,可能就会因无法将分泌出来的口水全部吞咽下去,而漫过大堤,流出口外。
-
Methods Marshland areas near high endemic villages of schistosomiasis in the Poyang Lake region were selected. Corresponding map was digitized and (Landsat 5 TM) the image was corrected according to the digital map. The image where water and land shifted during floody and dry seasons was extracted and classified by unsupervised method. The image in dry seasons was calculated by both Normalized Difference Vegetation Index and Tasseled Cap model. Traditional snail survey was done at the same areas and recorded the geographic position by Geographic Position System. Some cultured lands inside the embankment and water pound in marshland areas were selected as control group. Results The image of pilot areas was classified into 10 classes.
方法选择鄱阳湖区内3个洲岛型血吸病重度流行村周围的洲滩地图进行数字化,在数字化地图的基础上分别对两张Landsat 5TM卫星遥感片进行校正,并提取出冬陆夏水洲滩部分,运用ERDAS IMAGINE软件对此洲滩进行计算机非监督分类、校正植被指数(Normalized Difference Vegetation Index, NDVI)和穗帽湿度变换指数(Tasseled Cap, TC)模型计算;用传统方法进行螺情调查,卫星定位仪记录有钉螺点的经纬度,同时选择部分堤内的农田和水溏作为对照点。
-
In the practice we have no special design of the approach slap , and the theoretical thereunder is not so reasonable. For example, when calculate the length of the approach slap, we adopt the permission differential change slap and settlement, without considering the height of road embankment filling , the form of abutment and the properties of the filling sort, so sometimes it is hard to eliminate the bridge head bump completely because of the disjoint, rupture or overshort of the approach slap, influencing the use of the road and bridge.
实践中一般桥头搭板不作专项设计,且理论依据不甚合理,如搭板长度计算采用桥头容许变坡差和沉降量确定,没有考虑路堤填土高度、桥台形式及填土性质,所以有时会出现搭板脱空、断裂或过短而未能彻底消除跳车现象,从而给道路桥梁的使用带来影响。
-
This paper gives mechanical testing results of sand-gravel materials in the Liangcha river that show good compaction, high shear strength and low compression behavior. The materials in both panical grades and engineering, behaviors can meet the requirements of different parts of the dam body. And it also discribes a stlbzone in the dam body, design specification, construCtion parameters as well as embankment, slope comp...
本文对两岔河砂砾石的物理力学性能进行分析,认为砂砾石的压实性好、抗剪强度高、压缩性低,不论是颗粒级配还是工程性质均可满足坝体各分区的要求;对坝体分区、设计技术指标、施工参数以及1年来的填筑施工、斜坡碾压、砂浆固坡、质量控制等方面的具体作法,进行了全面的介绍。
- 相关中文对照歌词
- Victoria
- On The Wings Of A Dream
- Victoria
- Victoria Secret
- What's Victoria's Secret?
- Victoria
- Victoria
- Take A Hint
- Victoria's Secret
- Squalor Victoria
- 推荐网络例句
-
More direct, directer ; most direct, directest
径直的,笔直的
-
Do you know how to use a chain saw?
你知道如何使用链锯吗?
-
This is close to the cost of the purchase price.
这样的收购价已接近成本。