英语人>网络例句>T-beam bridge 相关的网络例句
T-beam bridge相关的网络例句

查询词典 T-beam bridge

与 T-beam bridge 相关的网络例句 [注:此内容来源于网络,仅供参考]

The website that is aimed at a company at that time was written medical certificate and the plan that return chain, oneself power is particularly great at that time, the old gave me 3 keywords at that time: Bridge of bridge of Wifi mobile phone, wireless net, Beijing wireless net, should come I undertake care is changed, I plan according to oneself above all in write one step by step did, the competition ability that I see WIFI mobile phone in Baidu index is not great, care changes the rate that go up should be the fastest, I update my website every day, increase oneself return chain, held to a month so, but see the rank of oneself website also often go up not to go, but this gives me of pepperbox died urgently, I am seeking a teacher every day, the friend asks, this is how to return a responsibility, how the rank of my website is old also go up not to go, but they are to use same word to tell me, fasten anxious, do care to change this thing not to come urgently, want to wait a moment, such I am able to bear or endure again strength waited 3 days, the following day, I rank a tool to be checked with the keyword, the rank contest of WIFI mobile phone discharged Baidu the 2nd, GG the position of the 5th, bridge of Beijing wireless net is on Baidu the 7th, GG the position of the 9th, when the work that sees oneself has positive result, really happy skipped to rise, follow ate close same.

当时就针对公司的网站写了诊断书和反链计划,当时自己的动力非凡大,老大当时给了我三个要害词:wifi手机、无线网桥、北京无线网桥,要来我进行忧化,我首先按照自己计划中写的一步步的都做了,我在百度指数中看WIFI手机的竞争力不大,忧化上去的速度应该是最快的,我就天天更新自己的网站,增加自己的反链,这样坚持了一个月,可是见自己的网站的排名老是也上不去,这可是把急性子的我给急死了,我天天追着老师,朋友问,这是怎么回事呀,我的网站的排名怎么老也上不去,可是他们都是用同样的话告诉我,别着急,做忧化这个事情急不来,要等等,这样我又耐着性子等了三天,第二天,我用要害词排名工具一查,WIFI手机的排名竞排到了百度第二,GG第五的位置,北京无线网桥在百度上是第七,GG第九的位置,当看到自己的劳动有成果的时候,真是开心的蹦了起来,就跟吃了密一样。

Structural matter drops to hit water with fixed rate phut from certain height, inchoate and main the structure that attacks water process in the light of phut is answered begin research, and press mutation of field of force and Xing Bo to wait to study however to entering the underwater after water less, and add with each passing day as large bridge and marine project much, the construction in these projects and the phenomenon that phut of large construction content also appeared to hit water in use process, like Guangdong 9 rivers big bridge is bumped to break down after collapsing, large area bridge floor falls into surface to wait, the meeting such as mutation of field of pressure of the underwater after this kind of phut hits water and Xing Bo is right all round structural products gives birth to certain influence, evaluate this kind of influence to have real project sense to construction and design.

结构物从一定高度落下以一定速度砰击水面,早期主要针对砰击入水过程的结构响应开展探究,而对入水后水下压力场突变和兴波等却探究较少,而随着大型桥梁和海洋工程日渐增多,在这些工程的施工和使用过程中也出现了大型结构物砰击入水的现象,如广东九江大桥被撞垮塌后大面积桥面落入水面等,这种砰击入水后水下压力场突变和兴波等会对四周结构物产生一定影响,评价这种影响对施工和设计具有现实的工程意义。

Bridge Pier is the sustain structure of the bridge, it is very important to steadily operate of the bridge.

桥墩是桥梁的支撑结构,在桥梁稳定运行中起着十分重要的作用。

The prestressed reinforced concrete continuous rigid frame bridge is a kind of bridge which is nice wholeness , bearing property and has bright and pithiness bridge style .

预应力混凝土连续刚构桥是一种结构整体性好,受力合理,造型简洁明快的混凝土桥型,既保持了连续梁无伸缩缝,行车平顺的特点,又有T型刚构桥不设支座,施工方便的特点。

This design installs the process to the road bridge in the space knothole porterage work request, design a kind of new derrick - build a bridge the Dragon gate derrick of liquid press the system, build a bridge the Dragon gate derrick to mainly be constitute by four parts, namely:Rise to rise the organization, small garage to walk organization, change direction the organization and big garages to walk organization.

本设计针对路桥架设过程中博格板的搬运工作要求,设计一种新型起重机械——架桥龙门起重机的液压系统,架桥龙门起重机主要由四个部分组成,即:起升机构、小车行走机构、转向机构和大车行走机构。

The Xiangfu Bridges are three bridges that lie from the east to the west and called CiEn Bridge, DaJue Bridge, PuDu Bridge, and they tell us to bear in mind the grace from Buddhas,teachers, parents and one's motherland, to ultimately derived from full enlightenment by the power of compassion and deliverance

祥符三桥从东到西分别叫做慈恩桥、大觉桥、普渡桥,它们告诉人们要心怀佛恩、师恩、父母恩和国恩,要从同情和帮助中最终得到完全的启发,要关心其它众生渡送他们到达彼岸

The Xiangfu Bridges are three bridges that lie from the east to the west and called CiEn Bridge, DaJue Bridge, PuDu Bridge, and they tell us to bear in mind the grace from Buddhas,teachers, parents and one's motherland, to ultimately derived from full enlightenment by the power of compassion and deliverance, to care for other sentient beings and deliver them to the Other Shore.

祥符三桥从东到西分别叫做慈恩桥、大觉桥、普渡桥,它们告诉人们要心怀佛恩、师恩、父母恩和国恩,要从同情和帮助中最终得到完全的启发,要关心其它众生渡送他们到达彼岸

When Sinlaku hit Taiwan during September 12-15, 2008, the extremely torrential rain made Hou-Fong Bridge, located in downstream of Shi-Gang Dam, broken at around 6:50 p.m. on September 14, 2008. In this study, the case was applied to investigate the factors which resulted in the typhoon flood scour disaster and the disaster prevention mechanism, including the general scour of upstream and downstream river banks, the riverhead erosion and constriction scour, the free fall of broad-crested weir effect caused by water-pipe protection engineering, the disaster prevention and response of the bridge care and management unit, and the examination, timing and procedure of bridge block.

中文摘要本研究系以97年9月12日至15日强烈台风辛乐克侵袭台湾期间,所降下的超大豪雨造成位在大甲溪石冈坝下游后丰大桥於9月14日下午6点50分左右发生断桥事件为例,探讨台洪冲刷灾害成因与防灾应变机制,包含上下游河道之一般冲刷、河道向源侵蚀与束缩冲刷及位於桥梁上游约20公尺处之自来水干管保护工所产生宽顶堰跌水效应等影响,并检讨桥梁养护管理单位於断桥发生前防灾应变处置方式及台洪期间之巡查检测、封桥时机与封桥作业流程等等相关因应作为。

To resolve the design difficulties caused by small cross-section, low height of the bridge structure, the key technique problem to the bridge structure should be carried on research and analysis, such as whole calculation model, considering foundation combined action , the reasonable rigidity match to the joint of the girder and pier ,inner force redistribution caused by the system conversion ,the forecast to long-term deformation after building , stress analysis and tectonic steel bar of the anchored serration block , the influence of foundation settlement and anti- earthquake measures . To acquire feasible and reasonable technique parameters and provide the full design basis, according to analytical results adjust and optimize the bridge structure design.

为解决桥梁结构要求截面小,高度低等带来的设计困难,需对该结构的关键技术问题如考虑基础共同作用的整体计算模型、梁墩间的合理刚度匹配、体系转换产生的内力重分布、成桥后的长期变形预测、锚下锯齿块应力分析及配筋构造、基础沉降影响及抗震措施等进行研究分析,以获得技术可行、经济合理的技术参数,为设计提供充分的依据,根据分析结果调整优化桥梁结构设计。

The Iron Bridge, spanning the Severn river in Shropshire, England, isn't a particularly large or ornate bridge, but it does have something that made it unique: it's the first bridge made completely out of cast iron.

座位在英格兰Shropshire郡severn河之上的铁桥,并不是一座大型或者装饰华丽的桥梁,但它确实很独特:它是世界上第一座完全用生铁制造的桥梁。

第35/500页 首页 < ... 31 32 33 34 35 36 37 38 39 ... > 尾页
相关中文对照歌词
Beam
London Bridge Is Falling Down
Beam Me Up
Beam Me Up
Crop Circles
Triple Beam Dreams
Beam Me Up
Tractor Beam
The U.S.S. Make Shit Up
The U.S.S. Make Shit Up (BiTrektual Version)
推荐网络例句

Nowadays, most of research are to build a transmutative Petri Nets through adding controlling place sets, controlling arc sets and controlling policy to the basic Petri Nets, while the Controlled Petri Nets could be used to argue many controlling theory problems conveniently and to induce many logically and physically supervisory and solve the Event Feedback Controlling Problems and State Feedback Controlling Problem in DEDS supervisory theory.

目前大多数的研究表现为在变形后的受控Petri网基础上,利用各种方法求得各种逻辑型、结构型控制器,解决DEDS监控理论中的事件反馈控制问题与状态反馈控制问题。

On one hand, there are discussions with the works council and union about extension of short time working up to the end of September.

一方面,有讨论,工程理事会和联盟关于延长工作时间短至9月底。

What is the topic sentence of this article?

这篇文章中心的句子是那一句?