查询词典 Port-au-Prince
- 与 Port-au-Prince 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The solution is to adopt a business card printing and membership card making machine instead of rubber blanket resin version, and then set the port-side seam is intended to be bonded in place rubber blanket a strip, strip of this blanket can't let paerboard, this is really looking edges, port-break light, gelatinize bond strength greatly improved after, but also to reduce the use of the cost of printing.
解决的办法是,采用一块制卡和会员卡制作机的橡皮布代替树脂版,然后将药盒边缝拟粘合的部分在橡皮布相应位置揭掉一层,使揭掉的这层橡皮布不能让纸板上光,这个办法果真见效,药盒边缝不会上光,涂胶后粘结强度大大提高,而且还降低了用树脂版制版的成本,一举两得。
-
Guangzhou is prosperous city when the Qin and Han dynasties, the Han and Tang Dynasties are the sea since the "Silk Road" of the port of origin, when the Qing Dynasty are the only Chinese port open to the outside world, but also the first Chinese ports opened for external trade.
广州秦汉时就是繁荣都会,汉唐以来是海上&丝绸之路&的始发港,清朝时是中国唯一对外开放的港口,也是中国最早对外的通商口岸。
-
For Less Than Container Load shipment, exhibitors have to bear the risk that the Shipping Line/Port operator may not take out your container and sort it out within short period (sometimesmay be more than 4 weeks) which may endanger our on-time pick up/delivery to the Fair. Our set deadline means that transportation should arrive at the designated air/sea port on the designated date respectively.
对于以拼箱方式运输的货物,展商必须承担船公司或港口的操作人员不能在短时间内分检集装箱的风险(此工作可能需要4个星期),这将会影响我司及时在港口提货及运输等工作,我司确定的最后期限是指运输工具在指定的日期抵达指定的港口。
-
For Less Than Container Load shipment, exhibitors have to bear the risk that the Shipping Line/Port operator may not devan your container and sort it out within short period (sometimes may be more than 4 weeks) which may endanger our on-time pick up/delivery to the Fair. Our set deadline means that transportation should arrive at the designated air/sea port before the designated date and the cargoes should been got ready for pick-up for delivery at any time.
对于以拼箱方式运输的货物,展商必须承担船公司或港口的操作人员不能在短时间内分检集装箱的风险(此工作可能需要4个星期),这将会影响我司及时在港口提货及运输等工作,我司确定的最后期限是指运输工具在指定的日期之前抵达指定的港口并随时可以提货。
-
For Less Than Container Load shipment, exhibitors have to bear the risk that the Shipping Line/Port operator may not devan your container and sort it out within short period (sometimes maybe more than 4 weeks) which may endanger our on-time pick up/delivery to the Fair. Our set deadline means that transportation should arrive at the designated air/sea port before the designated date and the cargoes should been got ready for pick-up for delivery at any time.
对于以拼箱方式运输的货物,展商必须承担船公司或港口的操作人员不能在短时间内分检集装箱的风险(此工作可能需要4个星期),这将会影响我司及时在港口提货及运输等工作,我司确定的最后期限是指运输工具在指定的日期之前抵达指定的港口并随时可以提货。
-
He said that the development and construction of coastal ports are millions of people for centuries Binhai dream October 23, 2008, voted in the electricity group guidance and participation of the coastal port of 100,000-ton waterway engineering finish the project bidding; 12 month one day, the CLP Group and Yancheng City People's Government for the signing of the "General Yancheng Coastal Port Development Cooperation Agreement"; December 18, the construction units in the three cross-Agency Ltd. Air official start sand block breakwater construction.
他说,滨海港的开发建设是滨海百万人民的百年梦想,2008年10月23日,在中电投集团的指导和参与下,滨海港10万吨级航道工程完成了项目招投标;12月1日,中电投集团与盐城市人民政府签订了《江苏盐城滨海港综合开发合作协议书》;12月18日,施工单位中交三航局有限公司正式开始防波挡沙堤的施工。
-
In the computer chassis before and after the panels are left in USB interface, we should, if possible, mobile hard drive inserted into the chassis back panel USB port, after all, the back panel of the USB ports are integrated directly into the computer motherboard, this USB port are generally considered safe grounding design, we found the body of the static it becomes hard to move a threat to the safety of the hard disk USB interface.
在电脑机箱前后面板中都留有USB接口的情况下,我们应该尽量将移动硬盘插入到机箱背面板上的USB端口中,毕竟背面板上的的USB端口通常直接集成在计算机主板中,这种USB端口一般都有安全接地的设计考虑,所以我们人体身上的静电就不大容易威胁到移动硬盘USB接口的安全。
-
We'd like to cover insurance against inland risk for you if the goods needs transhipping to inland city or other port instantly after arriving at the destination port.
有关保险的索赔案件应尽快提交保险公司或其代理商以便他们有足够的时间去向造成过错的有关方面进行追偿。
-
From SAN JUAN, PR port/customs and all suppliers exported from Port BARCELONA - Barcelona , TRANSHIPPING SA , which includes the contacts of trading parties, detailed cargo information PAINTS ...
与来自 BARCELONA Barcelona 的出口商 TRANSHIPPING SA 买卖双方的详细交易数据,包含了进出口双方的联系资料以及货物PAINTS 。。。
-
But now,there is many restricted factor for Tianjin Port to construct the top-class Port in theworld.
分析和研究我国物流政策的框架及当前制度运行中存在的主要问题,提出完善天津港物流政策的建议,对天津港的建设及天津的发展具有重要意义。
- 相关中文对照歌词
- Port Of Call
- Port Of Lonely Hearts
- A Girl In Every Port
- Going To Port Washington
- A Girl In Port
- Port Of Morrow
- Port Rubicon
- City Port
- Port Coton
- 推荐网络例句
-
By the time of its fall, most of the prisoners were writers who had written against the corruptions of the government.
到它被攻陷的时候,里面多数的犯人是写了反对政府贪污文章的作家。
-
The most obvious variation to ovum morphological character was that the color was changed from light green to sepiaceous in embryonic development, and all the ovums were almost hatched after 96h.
在胚胎发育过程中卵的形态特征最明显的变化是颜色从淡绿到深褐色,卵在发育96h后卵基本全部孵化。
-
There was a conflict between plebs and patricians in ancient Rome in 494BC.
在公元前494年,罗马发生了一次平民反对贵族的斗争。