查询词典 Nanjing
- 与 Nanjing 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Objective To find out insurants' satisfaction level to basic medical insurance system in Nanjing and explore the factors which influenced insurants' satisfaction.
目的 了解参保职工对江苏省南京市基本医疗保险制度改革运行的满意度,探索影响参保职工满意度的因素。
-
Ms. Liu also studied international law at John Hopkins University, Nanjing University Center for American and Chinese Culture Studies.
刘律师也曾于约翰霍普金斯大学-南京大学中美文化研究中心进修国际法。
-
Ms. Liu also studied international law at John Hopkins University, Nanjing University Center for American and Chinese Culture Studies.
刘律师也曾於约翰霍普金斯大学-南京大学中美文化研究中心进修国际法。
-
Province National Land Agency in accordance with the key cities of the province in 2003 the land dynamic monitoring, Nanjing since 2000 than the index of land prices have been increasing in each ring.
省国土厅按照重点城市的省2003年的土地动态监测,南京自2000年以来,超过该指数的土地价格一直在增加,在每一个戒指。
-
Consumers in Beijing and supermarket Xinguang World Food Organic Living Broadwood Hall or through the company, based in Shanghai, Guangzhou, Fuzhou, Hangzhou, Nanjing, Shenyang and other places of shops purchase Tahitian Noni products, and Welcome to Causeway Bay, Hong Kong Living Museum of the Tahitian Noni.
超市在北京和世界粮食消费者新光乐活有机生活馆或者通过公司,在上海,广州,福州,杭州,南京,沉阳和其他地方的商店购买大溪地诺丽产品,并欢迎来到铜锣湾,香港生活博物馆大溪地诺丽的。
-
Through investigations and researches in Nanjing、Suzhou、Wuxi three municipalities, this thesis makes investigations and analysis in detail about the present situation of the floating population, the development process、living pattern and the organization and construction pattern of low-rented dwellings in floating population compact community .
本文通过在南京、苏州、无锡三市的实地调查,对流动人口的居住现状,流动人口廉租住宅的发展过程、居住模式、组织建设模式作了详尽的调研与分析。
-
It is understood that the country wooden furniture and wood-based panel Quality Center is located at Pizhou City Economic Development Zone, by Pizhou city government to invest some 124 million yuan to build, covers an area of 84.6 mu, total construction area of the main 20,000 square meters, since early in March 2007 laid the foundation stone to start the construction has been completed the main engineering building, currently under way to install curtain walls, internal and external decoration, the construction of ancillary facilities and greening, lighting and other projects, has been ordered by the total value of 17,800,000 yuan equipment abroad advanced equipment ordered all arrive in Singapore, Shanghai, Nanjing and other ports, in the domestic order of the instruments and equipment manufacturers have all been completed and arrived at the designated locations by the end of March until the Center can be installed after delivery, commissioning, trial operation input .
据了解,国家木制家具及人造板质量中心位于邳州市经济开发区由邳州市政府投资约1.24亿元兴建,占地84.6亩,总建筑面积面积主要二点零零零万平方米自2007年3月月初奠基开工建设,已完成主体工程建设,目前正在安装玻璃幕墙,内部和外部装饰,配套设施及绿化,灯光和建筑其他项目中,已经由一七八〇〇〇〇〇元订购设备的总价值国外先进设备下令所有抵达新加坡,上海,南京等港口的仪器和设备制造商国内秩序,已全部完成,并在指定地点到达在3月底之前,中心还可以交付后安装,调试,投入试运行。
-
College of Animal Medicine, Nanjing Agricultural University, Nangjing 210095
单位:南京农业大学动物医学院,南京210095
-
The sketch and specific design approaches of mid-block street crossing are generalized and three management and control modes are discussed. Based on extensive investigation and survey, the paper analysis the arriving laws in different land-use condition and the traffic characteristics of different crossing entities under different control modes. The initial characteristic, the speed and dispersion of the mobile flow are also intensive studied, as well as the effect of mid-block street crossing. Establish the linear planning models on the coordination between the signals of mid-block crossing and intersection. Finally the evaluation of the model output is carried out from time saving results, safety, economic results and social results. Set the example of Taiping north road in Nanjing, surveying the traffic situation, applying the method of signal coordination between the mid-block crossings and intersection to realize the south-to-north signal coordination design. The evaluation results show the coordination plan are more superior to the current signal plan.
本文首先阐述了行人过街物理设施的概略设计和详细设计方法,讨论了路段人行横道的三种交通管制方式的设计方法和实用条件;其次,在充分的实际调查基础上,详细分析了不同用地性质条件下的过街需求的到达特性和不同交通管制下不同过街实体的交通特性,分析了进入路段的机动车初始流特性,并对机动车在路段中的车速特征、离散性以及路段信号控制人行横道对机动车流的影响进行了研究;然后,根据以上分析的过街交通和机动车交通的交通特性,建立了路段行人过街信号与交叉口信号协调控制的线性规划模型;最后,对模型输出的协调控制方案进行了效益评价分析,从时间效益、安全性、经济效益和社会效益四个方面,定量和定性相结合地对其实施效果予以评价;以南京市太平北路路段为例,根据现状交通状况,应用行人过街信号与交叉口信号协调控制的方法,对该路段由南向北方向进行单向协调控制设计,并进行方案效益分析评价,提出了优于现状控制方案的人行过街信号与交叉口信号协调控制方案。
-
Refer to the research findings of CHengDu Research Institute of Geosciences and Minerals(1990) and Nanjing Research Institute of Geography and Lake of Chinese Academy of Sciences(1989), according to the Guidebook of China Stratum(2000), the chronostratigraphy of Kunming Basin is divided into 4 age: the bottom of the Quaternary corresponding to M/G Boundary, age is 2.6Ma;the Bottom of the Mid-Pleistocene corresponding to B/M Boundary, age is 0.78Ma;the Bottom of the Upper-Pleistocene corresponding to the Blake event, age is 0.128Ma;the Bottom of the Holocene corresponding to the Gothenburg event,age is 0.012Ma.
本次研究获得了大量的测年数据,参考成都地质矿产研究所(1990)及中科院南京地理与湖泊研究所(1989)等的研究成果,按照中国地层指南(2000)的方案,厘定了昆明盆地第四纪年代地层划分:第四系底界对应古地磁松山反向期与高斯正向期界线处,年龄为2.6Ma;更新统中部底界对应古地磁布容正向期与松山反向期界线,年龄为0.78Ma;更新统上部底界对应古地磁布莱克事件附近,年龄约0.128Ma:全新统底界对应古地磁哥德堡事件附近,年龄约0.012ma。
- 推荐网络例句
-
The split between the two groups can hardly be papered over.
这两个团体间的分歧难以掩饰。
-
This approach not only encourages a greater number of responses, but minimizes the likelihood of stale groupthink.
这种做法不仅鼓励了更多的反应,而且减少跟风的可能性。
-
The new PS20 solar power tower collected sunlight through mirrors known as "heliostats" to produce steam that is converted into electricity by a turbine in Sanlucar la Mayor, Spain, Wednesday.
聚光:照片上是建在西班牙桑路卡拉马尤城的一座新型PS20塔式太阳能电站。被称为&日光反射装置&的镜子将太阳光反射到主塔,然后用聚集的热量产生蒸汽进而通过涡轮机转化为电力