英语人>网络例句>Crane 相关的网络例句
Crane相关的网络例句

查询词典 Crane

与 Crane 相关的网络例句 [注:此内容来源于网络,仅供参考]

Lashing to be provided in a suitable position on poop deck aft or 1st deck within the operation area of the provision crane. On portside a small gangway crane to be installed.

在艉楼甲板的后部或第一层甲板的食品吊操作区内合适的位置应布置有绑扎件,同时在左舷应安装有跳板小吊。

But this decision was deterred because the Red-crowned Crane's Latin name is called "Japanese Crane."

但因为丹顶鹤的拉丁文叫'日本鹤'固这一决定被迫制止。

As this crane enjoys high speed in train formation and self-propelled running, the dynamic performance of this crane is necessarily to draw attention.

该机具有的回送和自力走行速度高的特点,并且是一个全新的产品,因此必须对该机的动力学性能引起足够的重视。

Emmy Award winners James Spader and William Shatner play Alan Shore and Denny Crane, unlikely kindred spirits among the brigade of high-priced litigators at Crane, Poole and Schmidt.

波士顿法律》不是那么传统的剧集,它是著名法律剧the practice的延伸,但却迅速找到了自己的位置。

Back-to-back Emmy Award winners James Spader and William Shatner play Alan Shore and Denny Crane, unlikely kindred spirits among the brigade of high-priced litigators at Crane, Poole and Schmidt.

法律事务所的资深律师,总想着充老大,却发现难以应付艾伦在法庭上的诡计多端和丹尼种种奇怪荒谬的表现,手忙脚乱的他发现自己只顾得上维持自己的地位。

At this time, loosen the connection screw of standard section with spanner, hang the shaft of hand crane on the upper angle bar, sway the shaft of hand crane upward, separate this standard section from the next section, and lay it in the suspension coop, dismantle the other standard section for the same method, and turn the shaft to another direction, draw the lifting wire rope tightly, the operation staff leave the suspension coop, open the lock stopping instrument, fall the suspension coop to next position and lock the brake instrument, the operation staff return to the top of suspension coop, continually dismantle note: forbid the staff leave on the top of suspension coop or in the coop when the suspension coop is running

8.1折除时,首先将吊笼用停层装置停靠在待拆除的标准节的下两节上,操作人员上到吊笼顶,卷扬机松绳,用小吊杆将顶梁略向上提起,拔出顶梁横销,使顶梁值得徐徐降下,降到拆除节下一节中间框架角处,并重新穿上横销,这时用板手将标准节连接螺栓松开,将手摇起重机小吊杆钩挂在待拆节上框架用钢土,到吊笼内,用同样的方法拆下另一节标准节,然后将吊杆转向不影响升降机运行的方向,收紧起升钢丝绳,操作人员离开吊笼,打开锁止机构,使吊笼下降到下一个拆除位置,并将锁止机构锁死,人员重返笼顶,进行下一拆除循环注意:在吊笼运行时绝不允许有人员留在吊笼顶部或吊笼内

When dismantle the machine, firstly, stop the suspension coop on the lower 2 sections of the standard sections, the operation staff go on the suspension coop top, the hoisting machine loosen rope, lift the pillar with small shaft, pull out the horizontal pin of pillar, let the pillar fall slowly to thedismantled section's middle angle bar, insert the horizontal pin again. At this time, loosen the connection screw of standard section with spanner, hang the shaft of hand crane on the upper angle bar, sway the shaft of hand crane upward, separate this standard section from the next section, and lay itin the suspension coop, dismantle the other standard section for the same method, and turn the shaft to another direction, draw the lifting wire rope tightly, the operation staff leave the suspension coop, open the lock stopping instrument, fall the suspension coop to next position and lock the brakeinstrument, the operation staff return to the top of suspension coop, continually dismantle note: forbid the staff leave on the top of suspension coop or in the coop when the suspension coop is running

8.1折除时,首先将吊笼用停层装置停靠在待拆除的标准节的下两节上,操作人员上到吊笼顶,卷扬机松绳,用小吊杆将顶梁略向上提起,拔出顶梁横销,使顶梁值得徐徐降下,降到拆除节下一节中间框架角处,并重新穿上横销,这时用板手将标准节连接螺栓松开,将手摇起重机小吊杆钩挂在待拆节上框架用钢土,到吊笼内,用同样的方法拆下另一节标准节,然后将吊杆转向不影响升降机运行的方向,收紧起升钢丝绳,操作人员离开吊笼,打开锁止机构,使吊笼下降到下一个拆除位置,并将锁止机构锁死,人员重返笼顶,进行下一拆除循环(注意:在吊笼运行时绝不允许有人员留在吊笼顶部或吊笼内

For the steel truss girder with abroad \\\"bridge crane bar assembled Law,\\\" the level of technology and equipment as a result of the limited duration of its long, far from being able to meet China\\\s bridge construction project as requested in the analysis of large-span suspension bridge mountain girder erection difficulties under the premise that after the election raised more than Aizhai Bridge \\\"self-cross-cable crane swing shift\\\" program to set up the main truss, which is mountainous suspension bridge girder erecting another major innovation.

对于钢桁梁,用国外的"桥面吊机杆件拼装法",由于工艺和设备水平所限其工期长,远不能满足中国桥梁建设工期的要求,在分析山区大跨悬索桥主梁架设困难的前提下,经过多方案比选提出矮寨大桥"自行式跨缆吊机荡移"架设主桁方案,这是山区悬索桥主梁架设的又一个重大的创新。

And crane industry in the world's first brand Fenlankeni to carry out technical, market and other aspects of cooperation, the Shenyang Machine Tool Group technological transformation projects with the international advanced level of new low-clearance bridge crane.

并与居世界起重机行业第一品牌的芬兰科尼公司进行技术、市场等方面的合作,为沈阳机床集团技改项目提供了具有国际先进水平的低净空新型桥式起重机。

The crane is the tallest bird of the wading birds可省略为:The crane is the tallest of the wading birds.

考点15:平行结构要点:如果填空题中空格的后面有and,或者and后面有空格,那么这道题目一定是考察平行结构。

第11/97页 首页 < ... 7 8 9 10 11 12 13 14 15 ... > 尾页
相关中文对照歌词
The Crane Wife 3
The Crane Wife 1 & 2
The Loneliness Of A Tower Crane Driver
Origami Crane
Ichabod Crane
Whooping Crane
Crane
Crane Style
Crane Fist
Tiger Style Crane
推荐网络例句

I am accused of being overreligious," she said in her quiet, frank manner,"but that does not prevent me thinking the children very cruel who obstinately commit such suicide.""

客人们在卡罗利娜·埃凯家里,举止就文雅一些,因为卡罗利娜的母亲治家很严厉。

Designed by French fashion house Herm è s, this elegant uniform was manufactured in our home, Hong Kong, and was the first without a hat.

由著名品牌 Herm è s 设计,这件高贵的制服是香港本土制造,是我们第一套不配帽子的制服。

Do not 'inflate' your achievements and/or qualifications or skills .

不要 '夸大' 你的业绩或成果,条件或者技能。