查询词典 Commission plan
- 与 Commission plan 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.
上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。
-
The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.
内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。
-
As we have learned main component is system of fee of Internet bar plan software plan cost, hardware plan cost.
据了解网吧计费系统主要分为软件计费、硬件计费。
-
Responsibilities:Allocate the available resources in terms of workforce, materials and production equipment to fulfill daily production plan as per business requirements for Dye House Ensure on time delivery and continuous improvement for Dyeing order processing and shorten order lead timeMonitor Dyeing operations and implement action plan to achieve a time-bound labor productivity target Implement quality plan in association with quality department and ensure color quality Lead dyeing workforce to control dyeing production cost in terms of water consumption, electricity consumption, dyed chain/tape wastage generation Establish a safe, healthy and environment-protected working environment to ensure zero industry injury in Dyeing area Assist setting annual manufacturing budget for Dyeing section Monitor people performance and provide training to production supervisors and workers to develop and retain a competent and motivated production workforce
职责:分配现有的在劳动力,材料和生产设备等资源以满足每日的生产计划,实现染厂的业务需求。确保准时交货,不断加快染色订单处理过程,缩短订单准备时间。监控染色过程,实施计划以在有限的时间内完成生产目标。和质量部门实施质量保证计划,确保染色质量。带领染色车间工人减少水,电,生产线等方面的浪费,以控制生产成本。建立一个安全,健康和环保的工作环境,以确保印染环节零工伤。协助制定印染环节年度生产预算。监控员工绩效,为生产管理人员和工人提供培训,以培养,激励,保留合格的生产工人。
-
Initially NALCO had envisaged to spend Rs 3623 crores for its second phase expansion plan during the 10th Plan, which will now spill over into 11th Plan owing to cost escalation following delay in Government approval, he said.
起初,国家铝业公司计划在第10个五年计划的二期扩张计划投资362.3亿卢比,现在因政府延迟了批准时间该项目也将移至第11个五年发展计划中。
-
Through the authorized strength of construction organization design, can consider all-sidedly the various specific execution conditions that will build project , foster strengths and circumvent weaknesses land will decide reasonable the programme of construction, determine construction order, construction method and labour organization, reasonably comprehensive arrangement will be under construction surely progress plan; To build the design scheme of project the reasonability on economy, the scientificness on technology with in enforcement the possibility on project expounds and proves offer basis; To build the unit planned and construction enterprise construction working plan and enforcement of authorized strength of capital construction of authorized strength to be under construction prepare to work to plan offer basis; Can will build construction and the design of project;, the construction organization work of technology and all construction arrangements of economy, front and rear and construction enterprise and specific project more combine closely; Can the construction unit and cooperation unit, department and department that directly attends , stage and stage and course - the relation between course coordinate better.
通过施工组织设计的编制,可以全面考虑拟建工程的各种具体施工条件,扬长避短地拟定合理的施工方案,确定施工顺序、施工方法和劳动组织,合理地统筹安排拟定施工进度计划;为拟建工程的设计方案在经济上的合理性,在技术上的科学性和在实施工程上的可能性进行论证提供依据;为建设单位编制基本建设计划和施工企业编制施工工作计划及实施施工准备工作计划提供依据;可以把拟建工程的设计与施工;、技术与经济、前方与后方和施工企业的全部施工安排与具体工程的施工组织工作更紧密地结合起来;可以把直接参加的施工单位与协作单位、部门与部门、阶段与阶段、过程-与过程之间的关系更好地协调起来。
-
The idea that every hole is colorful , in fact ,long ago began to plan, and as the process ofthe project support and input ,such a plan will carry out gradually , in addition to flowers , the green of the nine holes will also have a great change, we plan to make the green part of the nine holes converted into PaoTai green for golf enthusiasts, this will greatly increase their desire to challenge.
让每一个洞都有声有色的想法其实在很早以前就开始打算,而随着项目的进程大力支持和投入,这样的计划逐步开展,除了鲜花之外的九个洞的果岭也将有大的改变,我们计划是把这九个洞的果岭部分改造为炮台果岭,对于球友来说,这将大大提高他们的挑战的欲望。
-
Makes dept. working plan and headcount plan according to the company plan.
2根据公司年度目标和年度经营计划制定本部门的工作计划和人员计划。
-
Responsibility 2: Makes dept. working plan and headcount plan according to the company plan.
2职责二:根据公司年度目标和年度经营计划指定本部门的工作计划和人员计划。
-
For each strategy, a corresponding exploitation plan of groundwater was designed. Then each designed exploitation plan (except scheme 3) was put into the model for calculation and simulation. The analysis on the forecasting results every plan indicates that:(1) Shuting down the self-provided wells is the most direct and effective method, playing an important role in the land subsidence prevention.(2) The resumption of compressed soil by groundwater artificial recharge is limited. So the artificial recharge can\'t provide essential effect for the resumption of land subsidence, unless the artificial recharge is much more than the groundwater withdrawal.(3) The method of "adjusting the exploitation stratum of groundwater to the shallow" has an obvious effect on the land subsidence prevention.(4)"Sand wells" can increase the leakage recharge for confined aquifer, and thus can slow and prevent the development of the land subsidence.(5) For the groundwater exploitation in Xi\'an, emergency self-provided wells should be managed according to the well spacing of 1600m, 2000m and 1600m, respectively, in the river terrace area, alluvial-proluvial fan area and loess tableland area to exploit the first confined groundwater. Corresponding individual well yield can be set as 2500m~3/d, 1500 m~3/d and 200 m~3/d. Make emergency self-provided wells pump in the dry year and stop pumping groundwater to restore and conserve underground water sources in average years and wet years. In this way, groundwater withdrawal of 162000m~3/d can be obtained to provide for the supplement of water supply in Xi\'an. As a result, the water supply stress can be released in dry years. The groundwater depression formed in the exploiting year can resume in 3-4 years. At the same time, this exploitation manner will not lead to obvious land subsidence.
本文利用所建的模型预测了现状开采条件下未来20年的地下水位和地面沉降的变化,在此基础上,提出了防治西安市地面沉降的五个地下水开采方案,利用所建的地面沉降模型对各个设计方案其进行了模拟和预报,对预测结果的分析表明:①封停自备井是防治地面沉降最为直接和最有效的对策,对防治地面沉降起着最为积极的作用;②采用人工回灌方法使被压缩的土层得到的恢复是非常有限的,对地面沉降不能起到根治作用,只有回灌量明显大于开采量时才能有一定的效果;③&调整开采层次,在浅层取水&对防治地面沉降的效果十分明显;④布设&砂井&可以增加对承压含水层的越流补给量,从而可以有效地缓解和控制地面沉降的发生和发展;⑤对西安市的地下水开采,可在河流阶地区、冲洪积扇区和黄土塬区分别采用1600m、2000m、1600m的井间距布置应急自备井,分别采用2500m~3/d、1500 m~3/d和200 m~3/d的单井开采量,开采第一承压水,在平水年或者丰水年不开采,涵养地下水源,在枯水年启动这些应急自备井开采,在输出分析范围内共可获得162000 m~3/d(5913万m~3/a)开采量,可以有效地补充西安市的供水水源,缓解供水紧张局面,开采年开采导致的下降的水位可在停采3~4年后得到基本恢复,同时,这种开采方式不会造成大的地面沉降量。
- 相关中文对照歌词
- Everybody Wanna Know
- Wake Up Call (One More Time)
- On The Grind
- The God Song
- Out Of Luck
- So Many Souls Deceased
- Whatchu Want
- Plan B
- Sleeping In
- Backfired
- 推荐网络例句
-
A carrier gas such as nitrogen is directed through line 20 and valve 22 to connect with line 26 and mix with the gas sample.
如氮气之类的载体通过管线20和阀22引入,与管线26相通,与气体样品混合。
-
But for the most part, knaves and parasites had the command of his fortune
然而支配他的家产的大多是恶棍和寄生虫。
-
For he that is now called a prophet, in time past was called a seer.
他们就往天主的人所住的城里去了。