查询词典 Bill
- 与 Bill 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Thomas Gomez, Dorothy Dandridge, Bill Walker, Angela Clarke
年轻的比尔堂森从大学辍学,参加了著名的哈林环球旅行者,同时收获了自己的爱情。
-
Cast : Adam Sandler as Paul Crewe, Chris Rock as Caretaker, Burt Reynolds as Manager Nate Scarborough, Nelly as Megget, Michael Irvin as Deacon Moss, Walter Williamson as Errol Dandridge, Bill Goldberg as Battle, Terry ..
演员:如保罗克鲁,克里斯洛克亚当桑德勒担任看守,伯特雷诺兹作为经理奈特士嘉堡,耐莉的Megget,迈克尔欧文的埃罗尔丹德里奇,比尔戈德堡的战役,执事苔,沃尔特威廉姆森,特里。。。
-
It was also endorsed by Democratic senator Bennett Johnston of Louisiana and Republican senators John Danforth of Missouri and Bill Cohen of Maine.
这个提议还得到了路易斯安那州民主党参议员贝内特。约翰斯顿、密苏里州共和党参议员约翰。丹福斯和缅因州共和党参议员比尔。科恩的表态支持。
-
Well,' said Darnay,'you have no reason to like me. But I hope that you will allow me to pay the bill for both of us.
你没有理由要喜欢我,但是我希望你要允许我为我们两个人付账。
-
Variations 52.3 Exceeding 15 Percent If, on the issue of the Taking-Over Certificate for the whole of the Works, it is found that as a result of: all varied work valued under Sub-Clause 52.1 and 52.2, and all adjustments upon measurement of the estimated quantities set out in the Bill of Quantities, excluding Provisional Sums, daywork and adjustments of price made under Clause 70, But not from any other cause, there have been additions to or deductions from the Contract Price which taken together are in excess of 15 per cent of the "Effective Contract Price"(which for the purposes of this Sub-Clause shall mean the Contract Price excluding Provisional Sums, and allowance for dayworks, if any) then and in such event (subject to Any action already taken under any other Sub-Clause of this Clause), after due consultation by the Engineer with the Employer and the Contractor, there shall be added to or deducted from the Contract Price such further further sum as may be agreed between the Contractor and the Engineer or, failing agreement, determined by the Engineer having regard to the Contractor's Site and general overhead costs of the Contract.
如果在签发整个工程接收证书时,发现由于: 47 超过百分之 52.3 十五(15%)的变更所有按第52.1款和52.2款规定作价的全部变更工程;对工程量清单中开列的估算数量进行计量所做的全部调整费用,但不包括所有暂定金额,计日工作费用及按本文第 70 条规定所作的价格调整。而并非由于任何其他原因,当加到或从合同价中减去的金额总和超过了有效合同价格就本款而言,应指不包括暂定金额和计日工(如有的话的合同价的 15%时,那么,工程师应在与承包人和业主协商后,在考虑据本款采取的任何步骤后,再将合同价减少或增加一笔工程师与承包人协商的调整金额,若不能达成一致意见,则由工程师考虑承包人的现场管理费用及总管理费开文后确定此数额。
-
Acceptance Criteria Activity Duration Estimation; Activity Definition; Activity Sequencing; Addenda Approved budget Arbitration Award of Contract ; Award Criteria Audits Balanced Matrix; Baseline Bill of Quantities Brainstorming Characteristic Checklists civil engineering civil building Claims Clarify Closing Communication Management Communications Planning Communications Skills Communication channels or paths Completion Computer-based Concrete structure Conditions of Contract Conflict Management Contract Management Contract administration Change Control Contract Closure Contract file Contract agreement; Contractual obligations Contractor Contractor's Representative Construction Management Planning Contract Price Control Chart Cost Estimating; Cost of Quality Cost Control Cost Budgeting Cost Management Co-operation Failure costs Critical Path Feedback Fixed-price Fossils Force Majeure Daywork Functional Organization Decision; Fundamental Tenets Decision Tree Defects Liability Definitions Delphi technique General Rules Deliverables General Provisions Deviation; Generation Direct Costs Discounted cash flow; Dissemination Highway engineering; Discharge Human Resource Management; Disputes Human Resource Planning Drawings Hydraulic engineering; Hydroelectric engineering; Employer's Taking Over Identity Certificate Evaluation of Tenders Initiating Process Group; Executing Process Group Instructions to Tenderers Industrial building Investment payback analysis; Ineffective Individual and team performance Information Distribution Negotiation Indirect Costs Nominated Subcontractors Incentive bonus Information Technology Interpretation; Insurance Observation Inspections Off-site Online On-the-job training Opening of Tender
验收标准活动时间的估计;活动的定义;活动序列分析;增编核定预算仲裁授予合同;授标标准审计平衡矩阵;基线工程量清单集思广益特性清单土木工程民用建筑索赔澄清闭幕通信管理通信规划沟通技巧沟通渠道或路径完成以计算机为基础的混凝土结构合同条件冲突管理合同管理合同管理变更控制合同结束合同文件合同协议;合同义务承包承包商的代表规划建设管理合同价格控制图成本估算;质量成本成本控制成本预算成本管理合作失败成本关键路径反馈固定价格化石不可抗力计日工职能组织决定;基本原理决策树缺陷责任定义德尔福技术的一般规则交付的一般规定偏差;代直接费用贴现现金流量;传播公路工程;放电的人力资源管理;争端的人力资源规划图纸水利工程;水电工程;雇主接管身份证书评标启动过程组;执行过程组指示的投标工业建设投资回报分析;无效个人和团队的业绩信息分配谈判指定分包商的间接费用激励奖金信息技术解释;保险观察视察场外在线在职培训开幕投标
-
If you can't pay the bill you are dead in the water .
如果你没有钱付账,那么什么事都停顿了。
-
When Bill learned my father was on his deathbed, he called me.
当 Bill 知道我的父亲快不行了时,他给了我电话。
-
Finally, on March 29, eight months after Bob Rubin and I had first requested it, I signed a bill to increase the debt limit.
终于,在3月29日,在鲍勃·鲁宾和我最初提出要求的八个月后,我签署了一项法案,提高了债务限额。
-
Is it transport by sea information management system imported to transport bill of lading , invoice , electromechanical relevant information processing of card of part by sea to each week such as order such as Company such as customer to import; Work out and ship information, declare the detail at the Customs according to treated information, guarantee the declarant's job of declaring at the Customs; Follow to transporting the information transported in the whole journey by sea; Leave the shelf to the save of the relevant documents data
进口部代运科三科在为上海通用沈阳北盛汽车有限公司代理由加拿大进口汽车零部件的工作中,包括对客户公司每个定货周的进口海运零件的提单、发票、机电证的相关信息的处理;根据所处理后的信息编制发运信息、报关明细,保证报关员的报关工作;对海运全程运输的信息跟踪;对相关单据数据的保存留档。
- 相关中文对照歌词
- Money
- Hundred Dollar Bill
- Railroad Bill
- The Continuing Story Of Bungalow Bill
- Sweetest Girl (Dollar Bill)
- Dolla Bill
- Pussy Bill
- Dollar Bill
- Kill Bill
- Sweetest Girl (Dollar Bill) Remix
- 推荐网络例句
-
Also June you can start with the first selection of your mink.
六月就可以开始您今年的第一轮挑选了。
-
North Korea's nuclear test was a damp squib in market terms.
北朝的核实验对于市场而言,也不过是一枚哑炮而已。
-
These results showed the adaptive ability of Z.xanthoxylum to aridity by the adjustment of itself.
苗期霸王可通过自身调节在不同水分条件下生长,反映出很强的生态适应能力。