英语人>网络例句>Anchorage 相关的网络例句
Anchorage相关的网络例句

查询词典 Anchorage

与 Anchorage 相关的网络例句 [注:此内容来源于网络,仅供参考]

I remembered that the most easterly of the rivers which drain into Captain Kidd's anchorage ran from the two-peaked hill upon my left; I bent my course in that direction that I might pass the stream while it was small.

我记得流入基德船长锚地的几条小河中最东的一条发源于我左边的双峰山。于是我就折回那座小山,打算在源头趟过小河。

I remembered that the most easterly of the rivers which drain into Captain Kidd's anchorage ran from the two-peaked hill upon my left; and I bent my course in that direction that I might pass the stream while it was small.

我记得流入基德船长锚地的几条小河中最东的一条发源于我左边的双峰山。

The channel and anchorage area are dredged, while the old turning basin can also be used if its depth is sufficient for the ship.

疏浚航道、锚地面积、虽然老把盆也可用其深度足以让船上。

First, on the basis of sufficient study on the constructive condition of the main bridge of Tianxingzhou Bridge, different types of cross section of the steel truss beam, relationship between the length of steel beam node and quantity of steel, the shape of pylon, the form of anchorage and the structural system of the main bridge of Tianxingzhou Bridge are analysed.

本文以天兴洲大桥主桥的设计为研究对象,较为详细的研究了以下内容:首先,在充分研究天兴洲大桥具体建桥条件的基础上,研究了不同主桁断面形式,比较了各种节间长度对受力及用钢量的影响,分析了主塔的形式和索的锚固方式,对比分析主桥总体布置的不同方案,同时还对主桥下部结构方案进行对比分析;然后,对不同铁路结合桥面布置方案进行了对比研究,并计算了推荐方案在不同荷载工况下的受力状况。

A new anchorage system for girder to obtain pretension stress at section top-edge in middle of span is shown. Based on the research of bi-prestressing beams inside test-room and the test of the prestress bar character, method for calculating the full size gird and choosing section are proposed. A new-style corrugated pipe which is shown in the paper is used, to solve the transformation of compressed thread bar and the contradiction between loss of friction resistance and pumping in pipe.

本文通过大量的试验及研究分析,提出了双预应力梁跨中上缘获得预拉应力的新的传力锚固体系;通过对室内双预应力混凝土小梁的研究,检测了预压钢筋的受力性能和预压过程中的某些影响参数;提出了足尺梁计算方法和截面、跨径选择方法;研制了新型哑铃型波纹管,很好地解决了预压钢筋变形、摩阻损失和管道压浆之间的矛盾;通过对30?

The analysis is based on elastic theory and makes use of the formula for calculating anchorage shear stress of steel sheet.

在弹性理论的基础上,利用钢板锚固剪应力计算公式,对在集中荷载或均布荷载作用下采用粘钢加固的混凝土梁,分析钢板锚固最大剪应力的有关影响因数。

This paper also introduces the stress losses of post-compressed steel bar and deflections of beams before and after anchorage.

文中还介绍了双预应力混凝土梁变形的特点和有关预应力损失问题。

In this paper,in combination with practice of penstock anchorage extra-large height difference settlement measurement for a pump-storage hydropower station,the measurement systematic error(including the invar leveling staff temperatare correction,scaled plane bend correction and circld bulb inclination correction)is analyzed.

结合某抽水蓄能电站镇墩特大高差沉降观测的实际工作,分析了铟钢水准尺温度改正、分划面弯曲改正及水准尺圆水准气泡倾斜改正等系统误差的规律,得出了一些有益的结论。

This paper presents an analytical member model for simulating nonlinear static and dynamic response of RC frame, which is able to account for spreading plastic flexure deformation, shear deformation and anchorage slip in the joint.

着重介绍了分布塑性梁子单元柔度矩阵的建立过程,该柔度矩阵是在梁端塑性区域平均刚度假定和修正TAKEDA恢复力模型的基础上建立起来的。

According to the post-tensioning method in prestressed concrete members,the calculation method of prestress losses caused by the deformation anchorage device,slip of tendon and joint compression was big in the error and narrow in the scope of application.

针对后张法预应力混凝土构件中由锚具变形、预应力钢束回缩和接缝压缩等引起的预应力损失计算方法适用范围较窄和误差较大的缺点,基于变形协调条件,通过分段近似计算方法,建立了锚具变形、预应力钢束回缩和接缝压缩等引起的预应力损失计算公式,并与实际预应力混凝土T形截面简支梁的计算结果进行了比较。

第20/22页 首页 < ... 14 15 16 17 18 19 20 21 22 > 尾页
推荐网络例句

I can not make it blossom and suits me

我不能让树为我开花

When temperatures are above approximately 80 °C discolouration of the raceways or rolling elements is a frequent feature.

当温度高于 80 °C 左右时,滚道或滚动元件褪色是很常见的特征。

The lawyer's case blew up because he had no proof.

律师的辩护失败,因为他没有证据。