英语人>网络例句>American plan 相关的网络例句
American plan相关的网络例句

查询词典 American plan

与 American plan 相关的网络例句 [注:此内容来源于网络,仅供参考]

The main clue is the normal design process of the regulatory plan. This paper analyzes the plan and development of domestic and overseas high-tech parks and then theorizes a design framework for regulatory plan of high-tech parks in china.

本文以控制性规划设计的一般流程为主线,通过对国内外高技术产业园区规划实践的分析,最终建立了一个关于我国高技术产业园区的控制性规划设计框架。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

As we have learned main component is system of fee of Internet bar plan software plan cost, hardware plan cost.

据了解网吧计费系统主要分为软件计费、硬件计费。

Responsibilities:Allocate the available resources in terms of workforce, materials and production equipment to fulfill daily production plan as per business requirements for Dye House Ensure on time delivery and continuous improvement for Dyeing order processing and shorten order lead timeMonitor Dyeing operations and implement action plan to achieve a time-bound labor productivity target Implement quality plan in association with quality department and ensure color quality Lead dyeing workforce to control dyeing production cost in terms of water consumption, electricity consumption, dyed chain/tape wastage generation Establish a safe, healthy and environment-protected working environment to ensure zero industry injury in Dyeing area Assist setting annual manufacturing budget for Dyeing section Monitor people performance and provide training to production supervisors and workers to develop and retain a competent and motivated production workforce

职责:分配现有的在劳动力,材料和生产设备等资源以满足每日的生产计划,实现染厂的业务需求。确保准时交货,不断加快染色订单处理过程,缩短订单准备时间。监控染色过程,实施计划以在有限的时间内完成生产目标。和质量部门实施质量保证计划,确保染色质量。带领染色车间工人减少水,电,生产线等方面的浪费,以控制生产成本。建立一个安全,健康和环保的工作环境,以确保印染环节零工伤。协助制定印染环节年度生产预算。监控员工绩效,为生产管理人员和工人提供培训,以培养,激励,保留合格的生产工人。

Initially NALCO had envisaged to spend Rs 3623 crores for its second phase expansion plan during the 10th Plan, which will now spill over into 11th Plan owing to cost escalation following delay in Government approval, he said.

起初,国家铝业公司计划在第10个五年计划的二期扩张计划投资362.3亿卢比,现在因政府延迟了批准时间该项目也将移至第11个五年发展计划中。

Through the authorized strength of construction organization design, can consider all-sidedly the various specific execution conditions that will build project , foster strengths and circumvent weaknesses land will decide reasonable the programme of construction, determine construction order, construction method and labour organization, reasonably comprehensive arrangement will be under construction surely progress plan; To build the design scheme of project the reasonability on economy, the scientificness on technology with in enforcement the possibility on project expounds and proves offer basis; To build the unit planned and construction enterprise construction working plan and enforcement of authorized strength of capital construction of authorized strength to be under construction prepare to work to plan offer basis; Can will build construction and the design of project;, the construction organization work of technology and all construction arrangements of economy, front and rear and construction enterprise and specific project more combine closely; Can the construction unit and cooperation unit, department and department that directly attends , stage and stage and course - the relation between course coordinate better.

通过施工组织设计的编制,可以全面考虑拟建工程的各种具体施工条件,扬长避短地拟定合理的施工方案,确定施工顺序、施工方法和劳动组织,合理地统筹安排拟定施工进度计划;为拟建工程的设计方案在经济上的合理性,在技术上的科学性和在实施工程上的可能性进行论证提供依据;为建设单位编制基本建设计划和施工企业编制施工工作计划及实施施工准备工作计划提供依据;可以把拟建工程的设计与施工;、技术与经济、前方与后方和施工企业的全部施工安排与具体工程的施工组织工作更紧密地结合起来;可以把直接参加的施工单位与协作单位、部门与部门、阶段与阶段、过程-与过程之间的关系更好地协调起来。

The idea that every hole is colorful , in fact ,long ago began to plan, and as the process ofthe project support and input ,such a plan will carry out gradually , in addition to flowers , the green of the nine holes will also have a great change, we plan to make the green part of the nine holes converted into PaoTai green for golf enthusiasts, this will greatly increase their desire to challenge.

让每一个洞都有声有色的想法其实在很早以前就开始打算,而随着项目的进程大力支持和投入,这样的计划逐步开展,除了鲜花之外的九个洞的果岭也将有大的改变,我们计划是把这九个洞的果岭部分改造为炮台果岭,对于球友来说,这将大大提高他们的挑战的欲望。

Makes dept. working plan and headcount plan according to the company plan.

2根据公司年度目标和年度经营计划制定本部门的工作计划和人员计划。

Responsibility 2: Makes dept. working plan and headcount plan according to the company plan.

2职责二:根据公司年度目标和年度经营计划指定本部门的工作计划和人员计划。

第9/500页 首页 < ... 5 6 7 8 9 10 11 12 13 ... > 尾页
相关中文对照歌词
American Made
American Hearts
American Girls
American Life (Headcleaner Rock Mix)
Young Americans
American Boys
We're An American Band
We're An American Band
American Boy
American Beauty
推荐网络例句

In the days of sailing vessels the crew were afraid they would be becalmed on the ocean.

在使用帆船的时代,船员们担心他们会因为无风而无法在海洋上航行。

As long as foreign donors pay the PA's salary bill, few expect a new intifada.

只要外国继续为巴权力机构的薪水买单,希望发动新暴动的人便寥寥无几。

Speak with contempt of none,form slave to king,the meanest bee,and will use,a sting.

别用 言词贬低任何人,无论国王还是奴隶。最卑戝的蜜蜂也会用它的毒针蜇人。