查询词典 7-up
- 与 7-up 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Yet she gives up her baby born out of wedlock to take up holy orders as a way of recompensing social conventions, and this is how Hu has managed to display greatness by conjuring up universal themes and associations from characters apart from mastery of technique and narrative.
胡导演在这点上大书特书,运用常见的事件和人物关系营造感人的场景,摆脱了对技术手段和画外音的依赖。
-
Just as the foreman of a spinning-mill settles the work-people in their places, walks up and down the works, and noting any stoppage or unusual creaking or too loud a whir in the spindles, goes up hurriedly, slackens the machinery and sets it going properly, so Anna Pavlovna, walking about her drawing-room, went up to any circle that was pausing or too loud in conversation and by a single word or change of position set the conversational machine going again in its regular, decorous way.
像一个纺纱作坊的老板,让劳动者就位以后,便在作坊里踱来踱去,发现纺锤停止转动,或者声音逆耳,轧轧作响、音量太大时,就赶快走去制动纺车,或者使它运转自如――安娜帕夫洛夫娜也是这样处理事情的,她在自己客厅里踱来踱去,不时地走到寂然无声或者谈论过多的人群面前,开口说句话或者调动他们的坐位,于是又使谈话机器从容不迫地、文质彬彬地转动起来。
-
Especially in recent years, creative jewellery and gemstone producers have come up with some wonderful, up-to-date jewellery design, thus sprucing up the image of jade, which had rather a traditional character for quite some time.
尤其在近些年,一些很有创意的珠宝商提出了一些很新颖的、时髦的珠宝设计方案,使得一度有这很传统的特点的翡翠在人们心中的形象得以改观。
-
The SUCRE rommate is the worker who tidies up sewer, the detection for him to tidy up sewer has a screw the second day, prepare to hand over to the jail police after pick up.........
SUCRE的室友是清理下水道的工人,第二天他清理下水道时发现有一个螺丝钉,捡起来后准备交给狱警。。。。。。。。。
-
And the first trumpeted, and there was hail and fire mingled with blood, and it was cast to the earth; and the third part of the earth was burned up, and the third part of the trees were burned up, and all green grass was burned up.
8:7 第一位天使吹号,就有雹子与火搀着血丢在地上,地的三分之一被烧了,树的三分之一被烧了,一切的青草也被烧了。
-
Looking back, even though the direction of speaking, lighten up are doing right, but because we have relatively large size of this fund, and some have been victimizes the stock quickly recovered up, so they are actually lighten up to enjoy the benefits is also very low and is not obvious.
现在回过头来看,虽然从方向上来说,减仓是做对了,但是因为我们这个基金规模比较大,而且有些被错杀的股票很快就恢复了上涨,所以其实减仓享受到的收益也很微薄,并不明显。
-
The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.
上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。
-
The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.
内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。
-
Secondly, it summarizes development and gradual progress about operational risk measurement. Analyzes and compares two main categories at present: bottom-up and top-down, and Loss Distribution Approach of top-down and Income Model of bottom-up is studied deeply, then finds out the main challenges of operational risk measure methods. Thirdly, taking examples for Shanghai Pudong Development Bank and Shenzhen Development Bank, it demonstrates operational risk measurement of our banking using Basic Indicator Approach and Income Model of bottom-up. And by comparing its effects with analysis result of concrete loss incidents of operational risk, it is approved that to apply operational risk measurement to our banking is feasibility. Finally, the paper analyzes difficulties to measure operational risk, such as weak consciousness of measuring operational risk, short of effective modern measuring model, behindhand of loss data collection and lack of perfect inside management mechanism of measurement, and then gives some advices.
接着总结了操作风险度量方法的发展演进过程,对目前度量操作风险的两类主流方法&自下而上&法和&自上而下&法进行了详细的分析和比较,分别选取&自下而上&的损失分布法和&自上而下&的收入模型法展开深入研究,并剖析了操作风险度量方法面临的主要挑战;接着以&浦东发展银行&和&深圳发展银行&为例,选用&自上而下&的基本指标法和收入模型法进行了操作风险度量的实证分析,并将分析结果与使用具体损失事件的实际操作风险分析结果进行了比较,证实了操作风险度量方法应用于我国的可行性;最后文章对我国银行业度量操作风险中存在的现实困难进行了深入探讨,指出了我国存在操作风险度量认识障碍、缺乏适用的现代操作风险度量模型、损失数据收集工作滞后以及操作风险度量缺乏完善的内部管理机制保证四大方面的现实问题,并提出了对策建议。
-
As to the mate lag problems in loom beat up mechanism,comparing traditional four bar linkages with quick return four bar linkages beat up mechanism,the latter can solve the lag problems effectively.A CAD method of designing the quickreturn four bar linkages beat up mechanism is pointed out,and the design mathematics model and the kinematic analysis model are also presented.
针对现有织机打纬机构和开口机构在运动配合上存在的滞后问题,比较了传统的四连杆打纬和具有急回特性的四连杆打纬机构,基于后者能有效地改善配合上的滞后问题,提出了精确设计具有急回特性的四连杆打纬机构的CAD方法,给出了设计的数学模型、机构运动分析的数学模型。
- 相关中文对照歌词
- Soul Surfing
- Wake Up
- Turn It Up
- Pulled Up
- Back Up
- Bottoms Up
- Light it Up
- Giddy Up
- Hit U Up
- Ruff Me Up
- 推荐网络例句
-
You can snipe the second and third union leaders from this position.
您可以鹬第二和第三工会领袖从这一立场出发。
-
Aiming at the currently shortage of XML streams quality detecting, this paper proposes a new forecasting method of XML streams quality by least squares support vector machines, which is used the method of XML keys' vector matrix as windows, and vector product wavelet transform to multilevel decompose and refactor the XML streams series, that can fulfill real-time checking demand of XML quality, and ensure constraint, consist- ency and integrality. For even more adapting net load, it proposes a control strategy by weight and adaptive adjustment to ensure XML streams quality.
针对当前XML数据流质量检测存在的不足,提出构建XML键的矢量矩阵作为窗口,利用矢量积小波变换多级分解与重构XML数据流,再结合最小二乘支持向量机对XML数据流质量进行预测的一种方法,满足XML数据流质量重构时实时检测的要求,保证XML数据的约束性、一致性与完整性;为了更好的适应网络负载,采取加权与自适应窗口调整等调度策略充分保证XML数据流的质量检测。
-
This is a very big challenge to developers especially that Ajax is constantly changing.
这对开发者来说是一个非常大的挑战,尤其是需要不断变化的Ajax。