- 更多网络例句与高顶帽相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Squeezed amongthousands of others , can glimpse an occasional bearskin and touch of scarlet and least enjoy the music .
普通的观众,挤在成千上万的其他观众中间,偶尔可以瞥见一顶黑熊皮高顶帽和些许红色制服,而且至少可以欣赏到音乐。
-
The winged hat of Hermes.A brimless cap worn by men.A woman's small, brimless, close-fitting hat .
宫颈帽是一种用硅橡胶制成的类似于小型阴道隔膜的避孕工具,其园顶较高,。。。
-
He took off his Circassian cap to his master and looked scornfully at him.
他在老爷面前摘下切尔克斯高顶帽,鄙夷地向他望了一眼。
-
A third person rode circumspectly—he had no doubt been cautioned—out of the wood, and stood still behind the count.
此人是个髯须斑白的老头,他身穿女人的外衣,头戴高顶帽,这就是名叫纳斯塔西娅·伊万诺夫娜的侍从丑角。
-
So I needed to wore a pair of high upper shoes with GTX outside material and V tread, and wore GTX dust coat, trousers with galluses, drip-dry underwear, a SUNTO watch in my wrist, at least a CASIO watch, and hung a GPS around my neck, and wore a jungle cap.
我还必须脚蹬一双 GTX 面 V 底的高帮鞋,外套是 GTX 风衣背带裤衬里衣物还需速干排汗的,手腕上戴 SUNTO ,最不济也要 CASIO ,脖子上吊一个 GPS ,头上戴一顶丛林帽。
-
Along an infinite invisible tightrope taut from zenith to nadir the End of the World, a twoheaded octopus in gillie's kilts, busby and tartan filibegs, whirls through the murk, head over heels, in the form of the Three Legs of Man.
世界末日"——身穿苏格兰高地游猎侍从的百褶格子呢短裙和格子花呢服、头戴熊皮鸟缨高顶帽的双头章鱼,以"人的三条腿的姿势头朝下顺着此绳在黑暗中旋转着。
-
The top hat is for formal occasion.
这种高顶帽只有在正式场合才能戴。
-
The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.
上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。
-
The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.
内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。
-
Along an infinite invisible tightrope taut from zenith to nadir the End of the World, a twoheaded octopus in gillie's kilts, busby and tartan filibegs, whirls through the murk, head over heels, in the form of the Three Legs of Man.
世界末日&——身穿苏格兰高地游猎侍从的百褶格子呢短裙和格子花呢服、头戴熊皮鸟缨高顶帽的双头章鱼,以&人的三条腿的姿势头朝下顺着此绳在黑暗中旋转着。
- 更多网络解释与高顶帽相关的网络解释 [注:此内容来源于网络,仅供参考]
-
acrosome:顶体
精子形成的主要变化是:①细胞核染色质极度浓缩,核变长并移向细胞的一侧,构成精子的头部;②高尔基复合体形成顶体泡,逐渐增大,凹陷为双层帽状覆盖在核的头端,成为顶体(acrosome);③中心粒迁移到细胞核的尾侧(顶体的相对侧),发出轴丝,
-
chimney pot:烟囱管帽;烟囱顶管
chimney-breast | 壁炉墙 | chimney-pot | 烟囱管帽;烟囱顶管 | chimney-stack | 升出屋顶的高烟囱
-
cowboy hat:牛仔帽
所以英语 中有牛仔帽(Cowboy hat)、牛仔靴(Cowboy boot)的 词条,却没有牛仔裤的字 样. 我们现 在的"牛仔 裤"的流行说法是 jeans. 当年牛仔的服 饰,并不是以今天所谓 的"牛仔 裤",而是以他们的帽 子--墨西哥 式的宽边高顶帽为最突出的标 志.
-
Panama hat:巴拿马草帽
top hat 高顶丝质礼帽 | Panama hat 巴拿马草帽 | beret 贝蕾帽
-
talky:多嘴的
talking-to 责备 | talky 多嘴的 | tall hat 高顶帽
-
tall money:大宗财富
tall hat 高顶帽 | tall money 大宗财富 | tall order 离谱的要求
-
ten-gallon hat:宽边高顶帽
ten-fold wooden rule 十折木尺 | ten-gallon hat 宽边高顶帽 | tenaculum forceps 单爪钳
-
tenaculum forceps:单爪钳
ten-gallon hat 宽边高顶帽 | tenaculum forceps 单爪钳 | tenaplate 涂胶铝箔
-
bsp;top hat:高顶丝质礼帽
bsp;top hat 高顶丝质礼帽 | Panama hat 巴拿马草帽 | beret 贝蕾帽
-
Barrel Helm:桶型护盔
シルクハット - Silk Hat - 丝帽 - DEF +17 | バレルヘルム - Barrel Helm - 桶型护盔 - DEF +18 | モリオン - Morion - 高顶盔 - DEF +19