验算
- 基本解释 (translations)
- recomputation · recompute · recomputed · recomputing · recomputes
- 更多网络例句与验算相关的网络例句 [注:此内容来源于网络,仅供参考]
-
In the point of view of molecule force theory, the physical regularity reflected in physical phenomenon of the normal boiling point for open chain, aromatic, alicyclic hydrocarbons and carboxylic acids, a new theoretical equation of the normal boiling point for them is proposed.
应用分子力学理论揭示出烃类和羧酸等的正常沸点 Tb这一物理现象中的物理规律性,从而提出其正常沸点的理论方程,物理意义明确,经用链烃,环烃和羧酸等的298个纯质的实测值验算,平均误差为0。
-
The structural design is carries on the design calculation after the plan comparison and appraisal recommendation plan, this stage design primary mission is: The design material analysis and the structure arrangement, the king post endogenic force computation, the pre-stressed steel ties the estimate and the arrangement, the computation king post section geometry characteristic, the steel tie the loss of prestress computation, the king post section intensity checking calculation, the king post nose partial bearing strength checking calculation, the king post distortion checking calculation and part compositions and so on lane board computation.
结构设计是根据方案评比后的推荐方案进行设计计算,这一阶段的设计主要任务是:设计资料分析及构造布置、主梁内力计算、预应力钢束的估算及其布置、计算主梁截面几何特性、钢束预应力损失计算、主梁截面强度验算、主梁端部的局部承压强度验算、主梁变形验算和行车道板计算等部分组成。
-
The value of the groundwater pressure is an important parameter in the engineering computations for the checkings of the base-plate anti-floatation of building foundation and the outer wall bearing capacity of basement.
地下水压力的大小在建筑物基础底板抗浮验算和地下室外墙承载力验算等工程计算中都是一个很重要的参数。
-
The reason that zero can not be divisor, is right?Feng XinkongIn the eighth book of six-year primary school's teaching in nine-year compulsory educationmaterials, it states that "zero can not be divisor". But we can find that the formula, a=cq, checking the dividing exactly , is same as the form of direction proportion function, y=kx; the formula of checking the dividing not exactly, a=cq+r, is same as the form of simple function.
在九年义务教育六年制小学教科书《数学》第八册中规定"零不能作除数",但是当我们学习了正比例函数和一次函数之后就会发现,验算能整除的除法的关系式a=cq和正比例函数y=kx的表示形式相同;验算有余数除法的关系式a=cq+r与一次函数的关系式y=kx+b的表示形式相同。
-
In the 5th chapter, the application of Multi-Agent technology in Concurrent Engineering is studied. With the shaft strength and rigidness analyzing agent and gear strength analyzing agent as examples, an agent model is studied and provided. A federated multi-agent infrastructure based on product assembly model and multiple analyzing agents is suggested. By this, cooperation under distributed and heterogeneous environment and efficient information integration among mechanical geometry product modeling system, assembly modeling system and analyzing system can be realized.
第五章研究了多代理(Multi-Agent)技术在并行工程中的应用,以转轴强度与刚度验算代理和齿轮强度验算代理为例子分析了代理的模型,研究并提出了一种基于产品装配模型和多分析计算Agent的联邦制体系结构,该体系结构能够支持异构分布环境下的协同工作,能够实现机械产品几何造型系统、装配建模系统、分析设计系统之间的有效集成。
-
A calculation method of reliability for slope stability,whose state function is implicit function,was researched.
利用其计算可靠度指标和验算点,然后将安全系数计算近似方程、隐函数计算方程和验算点结合起来,确定新的展开点和抽样点,并进行近似方程再拟合、可靠度指标的循环计算直到收敛。
-
The wind tunnel experiment,project argument,structure calculation analysis, calculation of the joint bearing capacity, calculation and experiment of the support-joint load carrying capacity of a super-span stretched stereoscopic steel pipe trussing are introduced- A normal usage period of the project after it had been built indicates that the major trussing and the supporting structure below have enough bearing capacity and deformability, and meet the demands of design code and actual usage.
摘要]介绍了某超大跨度伸臂立体管桁架结构的风洞试验、方案论证、结构计算分析、节点承载力验算、支座节点承载力验算和试验等。该结构建成后一段时期的正常使用表明,工程的主体桁架和下部承力结构具备较强的承载变形能力和可靠的安全度,满足设计规范和实际使用要求。
-
The resistance partial factors in design equations are adjusted in order to ensure the target reliability index. The recommended resistance factors are as follows 1.3 and 1.15 for calculating stability of sheet pile and anchorage respectively; 1.4 and 1.35 for calculating strength of sheet pile and tie rool respectively.
为使我国的板桩设计达到目标可靠指标,经过可靠度分析,建议板桩&踢脚&稳定性验算抗力系数调整为1.3,锚碇结构稳定性验算抗力系数、板桩墙抗弯强度作用效应综合分项系数和拉杆拉力分项系数仍分别取为1.15,1.4和1.35。
-
Proceeded for beam strength and stress; analysis and checking calculations are made of Traverse beam and surface plate.
将所推荐桥梁进行了全面的计算分析,利用横向分布系数确定活载分布,求得上部结构主梁的内力,从而确定主梁配筋,然后进行主梁强度和应力验算,并分析验算了横梁和桥面板。
-
Summary of the main tasks for the design basis of the new norms box for checking cantilever construction, Bridge construction safety and quality of construction is a top priority. Installation of this project is checking the pre-construction work of an important technology.
本设计主要任务为依据新的规范对箱形悬臂施工进行验算,拱桥的施工安全和质量是工程施工的头等大事,为此工程安装施工验算是施工前的一项重要技术工作。
- 更多网络解释与验算相关的网络解释 [注:此内容来源于网络,仅供参考]
-
Check Digit:检验数位
chart 图;图表 | check digit 检验数位 | checking 验算
-
crossed product:叉积,向量积
crossed multiplication 交叉乘法 | crossed product 叉积,向量积 | crossfooting 交叉验算
-
oxbow lake deposit:牛轭湖沉积物
overturning or slip resistance analysis 抗倾覆、滑移验算 | oxbow lake deposit 牛轭湖沉积物 | padding plate 垫板
-
padding plate:垫板
overturning or slip resistance analysis 抗倾覆、滑移验算(10) | padding plate 垫板(52) | partial penetrated butt weld 不焊透对接焊缝(61)
-
recommittal:再犯; 再委托 (名)
recommittal 再犯; 再委托 (名) | recomposition 改组; 改作; 重排; 恢复镇静 (名) | recompute 再计算; 验算 (动)
-
recompute:再计算; 验算 (动)
recomposition 改组; 改作; 重排; 恢复镇静 (名) | recompute 再计算; 验算 (动) | reconcentrate 再集中; 集中于某一点 (动)
-
reconcentrate:再集中; 集中于某一点 (动)
recompute 再计算; 验算 (动) | reconcentrate 再集中; 集中于某一点 (动) | reconcentration 再集中 (名)
-
sanga ekzameno:验血
验算: kontroli kalkulon | 验血: sanga ekzameno | 谚语: proverbo
-
check gauge:校核量规
check formula 验算公式 | check gauge 校核量规 | check holder 支票持有人
-
checking computations:验算
checking 检验 | checking computations 验算 | chess board problem 棋盘问题