- 更多网络例句与验收试验相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Compile the inspection and test plan of components purchased including process inspection and final acceptance inspection.
制定采购部件的检验试验计划,包括过程检验和最后验收程序的计划。
-
This Standard provides for technical requirements, testing and acceptance of evaporative cooling hydrogenerator generator / motor.
本标准规定了蒸发冷却水轮发电机的技术要求、试验验收及试运行等基本内容。
-
The fourth chapter introduces the validation test of POTOK. In the chapter, application effectivity of the Russian dry calibration method for electromagnetic fiowmeter is evaluated through experimentation.
论文第四章进行POTOK装置验收试验,对俄罗斯电磁流量计干标定技术在我国电磁流量计产品中的应用效果进行检验,并在试验结束后给出了相应的试验结果。
-
Automatic sprinkler system of water by pipeline leakage country "heating and sanitary engineering construction and acceptance norms" section 3.15 states: water pressure test, 10min with the pressure drop of not more than 0.05Mpa.
自动喷水系统管道的泄漏水量按国家《采暖与卫生工程施工及验收规范》第3.15条规定:水压试验时,10min内压力降不大于0.05Mpa。
-
And four processing methods for condition curves in calculation of specific enthalpy for exhaustc steam from LP cylinder at home and abroad being presented,and the advantages and disadvantages of each method being analysed.
根据ASME PTC6汽轮机性能验收试验规范确定低压缸排汽比焓的计算原则,介绍了目前国内外对计算低压缸排汽比焓及热力过程线的4种处理方法,并对各种方法的优缺点进行了具体的分析。
-
1 Upon receipt of materials or items, Warehouse Keeper shall place them in the uninspected area of Warehouse as applicable, the Material Engineer shall check all the receiving documents such as Material Quality Certification, test reports and assure that all the documents described in the Purchase Order have been received then provide them to the QC Department for receiving Inspection.
3.1 材料到厂后,仓库管理员负责将其放到仓储中心的待检区内,材料工程师核对供应厂家的材料质量证明书,试验报告等文件,并保证材料采购单中所提到的文件齐全无误,提交给检验部进行验收检查。
-
Based on ASME PTC6 Turbine Performance Acceptance Test Code,the principle of calculating the specific enthalpy of exhaust steam from low-pressure cylinder has been determined.
根据ASME PTC6汽轮机性能验收试验规范确定低压缸排汽比焓的计算原则,介绍了目前国内外对计算低压缸排汽比焓及热力过程线的4种处理方法,并对各种方法的优缺点进行了具体的分析。
-
Technical meeting on lessons learned with respect to SAT implementation, including development of triners and use of cost effective trining methods.
H-053-004 关于模拟器验收试验执行的学习课程技术会议,包括的培训器的发展,有效培训方法的应用
-
Electrician Cheng checks and accept a standard: Switch of leakage of electricity is installed it is correct, normal to use; The installation of electric parts of an apparatus, equipment is secured should firm, level off; Experiment of electric equipment electrify, lamps and lanterns tries bright reach lamps and lanterns to control function good; The exterior of parts of an apparatus such as box of switch, electrical outlet, terminal is in good condition, insulation parts of an apparatus is flawless, installation is firm, smooth, installation means accords with a regulation; The switch of paratactic installation, electrical outlet the deviation of terminal box, the clearance of periphery of the face plate of box of dark outfit switch, electrical outlet, terminal, box accords with a regulation; Authority of function of weak cable system is complete, satisfy use requirement, implemental installation is firm, smooth.
电气工程验收标准:漏电开关安装正确、使用正常;电气器件、设备的安装固定应牢固、平整;电器通电试验、灯具试亮及灯具控制性能良好;开关、插座、终端盒等器件外观完好,绝缘器件无裂纹,安装牢固、平正,安装方式符合规定;并列安装的开关、插座终端盒的偏差,暗装开关、插座、终端盒的面板、盒周边的间隙符合规定;弱电系统功能权齐全,满足使用要求,器具安装牢固、平正。
- 更多网络解释与验收试验相关的网络解释 [注:此内容来源于网络,仅供参考]
-
accelerating agent:速凝剂
accelerated motion 加速运动 | accelerating agent 速凝剂 | acceptance test 验收试验
-
acceptable quality level test:可接受的质量标准测试,可接受质量等级试验
acceptable quality level 可接受品质水准,可通过质量标准,质量合格标准,验收质量标准... | acceptable quality level test 可接受的质量标准测试,可接受质量等级试验 | acceptable quality limit 可接受质...
-
acceptance check:合格检验,验收
acceptance 验收,认可,肯定 | acceptance check 合格检验,验收 | acceptance test 验收试验
-
accepted test:合格试验
acceptance test 验收试验 | accepted test 合格试验 | acceptor 受体;接收器
-
AT Air Temperature:空气温度
AT Acceptance Test 验收试验*e' | AT Air Temperature 空气温度4R[eX0 | AT Ampere Turn 安培匝数\\\\L
-
standard fire test:标准火灾试验
standard export packages 出口包装 | standard fire test 标准火灾试验 | standard for acceptance 验收标准
-
acceptance functional test:验收性能试验
acceptance for honor 参加承兑 | acceptance functional test 验收性能试验 | acceptance gage 试收量规
-
for Winches:绞车系泊试验
14、试验情况良好,同意验收 The test is okay and it can be accepted. | (B)绞车系泊试验 for Winches | 1、检查设备安装完整性 To check the completeness of the installation.
-
state check testings:国家查核试验
"国家验收试验","state acceptance testings" | "国家查核试验","state check testings" | "国家查核试验","state check testings"
-
state acceptance testings:国家验收试验
"静[电]安[培]","statampere" | "国家验收试验","state acceptance testings" | "国家验收试验","state acceptance testings"