英语人>词典>汉英 : 顶梁 的英文翻译,例句
顶梁 的英文翻译、例句

顶梁

词组短语
top beam · back timber · carrying bar · set collar
更多网络例句与顶梁相关的网络例句 [注:此内容来源于网络,仅供参考]

The company has passed the ISO9001:2000 international Quality Control System Certification. Key products of the company include ZHZ Series Hydraulic Support with Connected-Sliding-Integral Roof, ZHF Series Hydraulic Support with Connected-Sliding-Divided Roof, ZF Series Hydraulic Support Falling Roof-Coal, ZY Series Shielding Hydraulic Support, and ZJH Hydraulic Support with Sliding- Divided Roof etc., Among which, the ZHZ and ZHF series products have obtained the inventive patent and functional patent, which is a revolutionary technical breakthrough to the countering sliding support.

公司主导产品为ZHZ型系列整体顶梁组合悬移液压支架、ZHF型系列分体顶梁组合悬移液压支架、ZF型系列放顶煤支架、ZY型系列掩护式支架、ZJH型系列悬移顶梁液压支架等,其中ZHZ型和ZHF型系列组合液压支架产品是我们的发明专利与实用新型专利产品,是针对悬移类支架的一次革命性技术突破。

The key products are ZHZ Series Hydraulic Support with Connected-Sliding-Integral Roof, ZHF Series Hydraulic Support with Connected-Sliding-Divided Roof, ZF Series Hydraulic Support Falling Roof-Coal, ZY Series Shielding Hydraulic Support, and ZJH Hydraulic Support with Sliding- Divided Roof, etc. ZHZ and ZHF series products have obtained the inventive patent and functional patent, which is a revolutionary technical breakthrough to countering sliding support.

公司主导产品为ZHZ型系列整体顶梁组合悬移液压支架、ZHF型系列分体顶梁组合悬移液压支架、ZF型系列轻型放顶煤支架、ZY型系列掩护式支架、ZJH型系列悬移顶梁液压支架等,其中ZHZ型和ZHF型系列产品是我们的发明专利与实用新型专利产品,是针对悬移类支架的一次革命性技术突破。

The key products are ZHZ Series Hydraulic Support with Connected-Sliding-Integral Roof, ZHF Series Hydraulic Support with Connected-Sliding-Divided Roof, ZF Series Hydraulic Support Falling Roof-Coal, ZY Series Shielding Hydraulic Support, and ZJH Hydraulic Support with Sliding- Divided Roof, etc.

公司主导产品为ZHZ型系列整体顶梁组合悬移液压支架、ZHF型系列分体顶梁组合悬移液压支架、ZF型系列轻型放顶煤支架、ZY型系列掩护式支架、ZJH型系列悬移顶梁液压支架等。

At this time, loosen the connection screw of standard section with spanner, hang the shaft of hand crane on the upper angle bar, sway the shaft of hand crane upward, separate this standard section from the next section, and lay it in the suspension coop, dismantle the other standard section for the same method, and turn the shaft to another direction, draw the lifting wire rope tightly, the operation staff leave the suspension coop, open the lock stopping instrument, fall the suspension coop to next position and lock the brake instrument, the operation staff return to the top of suspension coop, continually dismantle note: forbid the staff leave on the top of suspension coop or in the coop when the suspension coop is running

8.1折除时,首先将吊笼用停层装置停靠在待拆除的标准节的下两节上,操作人员上到吊笼顶,卷扬机松绳,用小吊杆将顶梁略向上提起,拔出顶梁横销,使顶梁值得徐徐降下,降到拆除节下一节中间框架角处,并重新穿上横销,这时用板手将标准节连接螺栓松开,将手摇起重机小吊杆钩挂在待拆节上框架用钢土,到吊笼内,用同样的方法拆下另一节标准节,然后将吊杆转向不影响升降机运行的方向,收紧起升钢丝绳,操作人员离开吊笼,打开锁止机构,使吊笼下降到下一个拆除位置,并将锁止机构锁死,人员重返笼顶,进行下一拆除循环注意:在吊笼运行时绝不允许有人员留在吊笼顶部或吊笼内

When dismantle the machine, firstly, stop the suspension coop on the lower 2 sections of the standard sections, the operation staff go on the suspension coop top, the hoisting machine loosen rope, lift the pillar with small shaft, pull out the horizontal pin of pillar, let the pillar fall slowly to thedismantled section's middle angle bar, insert the horizontal pin again. At this time, loosen the connection screw of standard section with spanner, hang the shaft of hand crane on the upper angle bar, sway the shaft of hand crane upward, separate this standard section from the next section, and lay itin the suspension coop, dismantle the other standard section for the same method, and turn the shaft to another direction, draw the lifting wire rope tightly, the operation staff leave the suspension coop, open the lock stopping instrument, fall the suspension coop to next position and lock the brakeinstrument, the operation staff return to the top of suspension coop, continually dismantle note: forbid the staff leave on the top of suspension coop or in the coop when the suspension coop is running

8.1折除时,首先将吊笼用停层装置停靠在待拆除的标准节的下两节上,操作人员上到吊笼顶,卷扬机松绳,用小吊杆将顶梁略向上提起,拔出顶梁横销,使顶梁值得徐徐降下,降到拆除节下一节中间框架角处,并重新穿上横销,这时用板手将标准节连接螺栓松开,将手摇起重机小吊杆钩挂在待拆节上框架用钢土,到吊笼内,用同样的方法拆下另一节标准节,然后将吊杆转向不影响升降机运行的方向,收紧起升钢丝绳,操作人员离开吊笼,打开锁止机构,使吊笼下降到下一个拆除位置,并将锁止机构锁死,人员重返笼顶,进行下一拆除循环(注意:在吊笼运行时绝不允许有人员留在吊笼顶部或吊笼内

After fixing the two sides standard sections, the hoisting machine loosen rope, pull out the two end horizontal pin of pillar, lift the pillar to the place of two section standard section's middle angle steel, the operation staff leave the suspension coop.

待两侧标准节连接固定好后,卷扬机松绳,拔出顶梁两端横销,用手摇起重机上小吊杆将顶梁提到新接好的两节标准节中间框架角钢处,穿好横销并锁定,操作人员离开吊笼。

Wind the wire rope from the two guiding block of the pillar, pass through the fall block, fix on the pillar or on the pulling shaft axle of weight limit appliance

4.4.4将卷扬机上钢丝绳从顶梁的两只导向滑轮上绕过,穿过吊笼上的动滑轮,固定在顶梁上(或顶梁上悬挂的重量限制器的拉杆轴上)。

Lift the suspension coop to the distance over 3m far from the pillar( that is 1m far from safety inserting block to the pillar).

5.5。将吊笼上升到距顶梁大于3米处停止(即安全插块距顶梁1米处)。

The wire rope pulled by the lifting mechanism wind through the 2 guiding blockof the pillar and cross the fall block, fix and suspend on the weight limiting instrument of the pillars, the operation staff can control the up and down movement and stop movement of the suspension coop by the control board.

提升机构拉出的钢丝绳绕过顶梁的两只导向滑轮穿过吊笼上的动滑轮,固接、悬挂在顶梁之上的重量限制器上,操作人员通过操纵台控制吊笼的上下运动和停止动作。

Put the pillar on middle of forth of standard section and insert the horizontal pin, put the pillar on the stand plate on middle angle bar.diagram 5

用手摇起重机将顶梁放在刚接好的第四节标准节的中间架处并插上横销,使顶梁担在标准节中框角钢的立板上。

更多网络解释与顶梁相关的网络解释 [注:此内容来源于网络,仅供参考]

cross beam:顶梁,上梁

critical path planning 关键路线计划法 | cross beam 顶梁,上梁 | cross head screwdriver 十字头螺丝功锥

headpiece:顶梁

headings 精矿 | headpiece 顶梁 | headtree 横梁

stull:顶梁,横木

fine stuffing 细填料 | stull 顶梁,横木 | reinforced stull [矿]加强的立柱,加强的支撑

stull:顶梁

stull 采掘台 | stull 顶梁 | stultificationstultify 使变无效

segmented canopies:分割的顶梁

[9] setting up:固定,调定 | [10] segmented canopies:分割的顶梁 | [11] hinge-jointed:铰链连接的

crown bar foot:炉撑顶梁角座

crown articulator || 牙冠咬架 | crown bar foot || 炉撑顶梁角座 | crown bar link pin || 顶杆联杆销

Flat-topped ridge:平顶脊;平顶梁

平顶山 flat-topped mountain | 平顶脊;平顶梁 flat-topped ridge | 烙铁峰 flatiron

The bats and owlets builders in the roof:是蝙蝠和夜莺的窠巢盘踞在顶梁

Look up and see the casement broken in, 你往上瞧,看这窗户都被... | The bats and owlets builders in the roof! 是蝙蝠和夜莺的窠巢盘踞在顶梁, | My cricket chirps against thy mandolin. 是啾啾的蟋蟀在跟你的琵...

top beam:顶梁

top and bottom heading method 上下导坑法 | top beam 顶梁 | top boom 顶弦 ,上弦

top beam WESTBANK:顶梁

top and bottom heading method WESTBANK 上下导坑法 | top beam WESTBANK 顶梁 | top boom WESTBANK 顶弦 ,上弦