- 负责确定是否符合进度和预算。
- 更多网络例句与进度相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The integrated risk between hydraulic, hydrologic uncertainty and the construction scheduling uncertainty should be analyzed. The paper puts forward the risk analysis model for the construction scheduling and the risk analysis model for construction diversion on the assumption that the construction scheduling is affirmable. Thus the Monte-Carlo method is used to simulate the integrated risk of construction diversion system considering hydraulic, hydrologic uncertainty and the construction scheduling uncertainty.
以风险分析为核心,将各种不确定性因素辐合起来研究施工导流系统的综合风险,提出施工进度计划风险分析模型和假定坝体施工进度确定条件下的施工导流风险分析模型,在此基础上,建立基于Monte-Carlo方法全面考虑水文水力不确定性以及施工进度不确定性的施工导流系统综合风险分析模型。
-
The control of the construction time is one of the important controls of tunnel. Once the construction time went amuck, the others should be influenced. So the study of the construction time is very important to us.
而在隧道工程中,进度控制是三大控制(资金、进度和质量的控制)中重要控制的目标之一,工程进度失控,必然会人力、物力的浪费,甚至可能会影响到工程的质量和安全,因此,对于隧道工程的工期研究也具有重大意义。
-
Progress in the preparation of management plans of the construction progress Bar Graph and Netwark Map, and to adjust and optimize the construction period, address the assurance measures aiming at the factors that affect the progress of the construction period.
在进度管理规划中编制了施工进度横道图和网络图,并对工期进行了优化和调整,针对影响进度的因素提出了工期保证措施。
-
Progress in the preparation of management plans of the construction progress Bar Graph and Netwark Map and to adjust and optimize the construction period address the assurance measures aiming at the factors that affect the progress of the construction period.
在进度管理规划中编制了施工进度横道图和络图,并对工期进行了优化和调整,针对影响进度的因素提出了工期保证措施。
-
When arranging the construction progress plan , in accordance with the contract period of the bridge pier, and the hollow plate ,bridge flooring and other,I arrange the flowing Construction,I draw the construction program Bar Graph and network map,then I adjust the construction progress to progress and resources.
安排进度计划时,按照合同工期对墩台,空心板以及桥面铺装等组织了流水作业,并绘制了施工进度计划横道图和网络图,之后从工期和资源两方面对进度计划进行了调整和优化。
-
At first, the research purpose and significance of progress management of road construction are analyzed and the present research situation about progress management is introduced. Under the guiding of various theories of progress management, the paper use critical path method to develop Hasui highway construction projects plan.
首先分析了公路建设进度管理研究的目的和意义和国内外建设项目进度管理的研究现状,在建设项目进度管理理论的指导下,运用基于网络技术的关键路径法制定了哈绥公路建设项目的进度计划。
-
With this requirement, The paper brings forward the Visual Time Controlling System for the project of railroading which be able to visually express process of the constructed item of road, bridge, railway, station and so on. The system can make with vivid show and progress statistic to adjust progress and amend plan comparing with the Real-time construction circs.
形象化工程进度控制系统就是在这种需求下提出的进度控制系统,能够形象化地表示出铁路建设工程中路、桥、轨道、车站等施工对象的施工进度,做出清晰的表示及进度统计,便于针对实时的施工情况,调整进度、修改计划。
-
The paper is mainly on the process control of NPP management from the view of proprietor, so it is of great pertinence for it involves the process controlling system, checking methods for the schedule, adjustment and optimization as well as various factors and analysis that influence the overall process. Meanwhile, the paper summarizes more practical checking and comparative methods as well as the application of software from the project management instead of discoursing on the adjustment for the original schedule from the angle of confusing network optimization, it is in this unique style that the research is naturally of more practical and appliable significance for the management of process control in nuclear plant.
本文主要从业主方面研究核电站项目管理的进度控制,从扩建工程的进度控制体系,进度计划的检查方法、计划的优化与调整,影响进度的各种原因及分析,并采取的有效措施,因而本文具有鲜明的针对性;本文未从复杂的网络优化的角度去论述对原进度计划进行调整,而是总结了项目管理中应用较多的检查、比较方法及项目管理软件的应用,从而使得本文的研究具有较强的可操作性,和实际应用意义。
-
Secondly, for the problem of irrationality of organizing organ, irrelevancy of distributing duty and disharmony of working flow, the paper puts forward better scheme and replying measurement.
最后,应用挣值法详细分析了梅坎铁路成本-进度的综合执行情况,找出了&当年大幅盈利,决算利润率剧降&的症结:由于进度、成本计划都是单独执行,没有进行综合分析和控制,造成判断失误,致使进度-成本控制失衡。
-
At present, 70,000 tons / year of adipic acid project completed the overall progress of the project 98%, adipic acid and related projects have been the end, assistive devices and production equipment also has entered the pre-production stage; and 50,000 tons / year project alcohol ketone the overall progress of the project completed 99%, nitric acid and hydrogen projects overall progress of the project 98 percent completed, with test conditions; In addition, 704 pumping stations - natural gas pipeline project Dushanzi overall progress of the project 98 percent completed.
目前,7万吨/年己二酸项目总体工程进度完成了98%,己二酸及配套项目施工已经收尾,辅助装置和生产装置也已经进入试生产阶段;且5万吨/年醇酮项目总体工程进度完成了99%,硝酸及制氢项目总体工程进度完成了98%,具备试车条件;另外,704泵站-独山子天然气管道项目总体工程进度完成了98%。
- 更多网络解释与进度相关的网络解释 [注:此内容来源于网络,仅供参考]
-
ahead of schedule:进度提前
资源负荷曲线 resource loading curve ; Bell curve | 进度提前 ahead of schedule | 进度拖延 schedule delay
-
Master Schedule:主进度计划
PowerOn和PowerPip都是以美国Primavera公司的P3e/c软件作为Power系列产品的进度计划核心引擎,围绕着项目主进度计划(Master Schedule)进行多业务过程的处理.
-
Milestone Schedule:里程碑进度计
Project Charter 项目许可证 | Milestone Schedule 里程碑进度计 | Master Schedule 主进度计划
-
project schedule network diagram:项目进度网络图
project schedule 项目进度计划 | project schedule network diagram 项目进度网络图 | project scope 项目范围
-
PLGOPG","PLO:营销进度管理
"PLGMKG","PLG","营销进度管理" | "PLGOPG","PLO","营销进度管理" | "QURCRI","QCR","目标标准"
-
progress bar:进度条
在控制面板中的键盘和鼠标设置程序中就使用了轨道条控件,如图6.3所示.轨道条不仅接受鼠标输入,也可以接受象左右箭头键、PgUp和PgDown这样的键盘输入.进度条(Progress Bar)的用途是向用户显示程序的进度.进度条是Win32控件中最简单的控件,
-
progress bar:进度指示器 进度指示器
programming 编程、程式设计、程式化 编程 | progress bar 进度指示器 进度指示器 | project 专案 项目、工程
-
Reschedule:重定进度
Requirements Workflow|需求工作流 | Reschedule|重定进度 | Rescheduling|重定进度
-
scheduled maintenance:进度维护
进度图 progress chart; progress map | 进度维护 scheduled maintenance | 进度照片 photographs of progress
-
SV:进度差异
SPI 远小于 1,而 SV 为负值,说明项目进度严重拖延,而随着时间推移,进度按计划赶上. 这里的数据可以来自于任何项目进度管理工具,只要定期将数据抽取到 Insight 的数据仓库即可. 图 9. 项目进度绩效指标(SPI)和进度差异(SV)图