- 更多网络例句与轨底相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The measured parts are respectively surface and the heart , including railhead , web , and triangle zone and rail foot .
测量部位分为表面和内部,分别在轨头,轨腰,轨底三角区和轨底脚。
-
Analyzed temperatures distribute during roughing roll and the effect of rolling parameter to draught pressure,analyzed the effect of rolling parameter to railhead and extension of heavy rail. At last,the research analyzed metal point's flow characteristic and revealed deforming regularity of heavy rail.
分析了在粗轧过程中温度场的分布以及轧制过程中轧制参数对轧制力的影响规律,分析了轧制参数对轨头、轨底宽展的影响规律,最后还分析了金属质点流动特性,揭示了重轨的变形规律。
-
Analyzed temperatures distribute during roughing roll and the effect of rolling parameter to draught pressure, analyzed the effect of rolling parameter to railhead and extension of heavy rail. At last, the research analyzed metal points flow characteristic and revealed deforming regularity of heavy rail.
分析了在粗轧过程中温度场的分布以及轧制过程中轧制参数对轧制力的影响规律,分析了轧制参数对轨头、轨底宽展的影响规律,最后还分析了金属质点流动特性,揭示了重轨的变形规律。
-
We have studied the variational pattern of track geometrical form due to wheel/rail forces under the quasi-static for operating of rolling stock, and also have studied the actions on elastic displacements of constraint rail due to the thickness and stiffness of track pad.
由轮轨力所引起的线路几何形态的变化规律;在假定轮轨力不变的情况下,又研究了轨底垫层的厚度和刚度对于约束钢轨弹性位移所起的作用;为确定轮轴的弯曲变形对轮轨关系的影响,同时建立了轮对有限元模型,计算了轮对承载状态所发生的弹性变形。
-
The kinematically admissible velocity fields of the web, head and base of rail are determined, respectively, and the corresponding strain rate fields and the intensity of shear strain rate are also obtained. Then the plastic deformation power, the friction powers and the powers consumed on the velocity discontinuity surface are obtained.
然后分别给出了轨腰、轨头及轨底的运动学许可速度场以及相应的应变速度场和剪应变速度强度,并求出了相应变形区的塑性变形功率、速度间断面上消耗的功率以及由于摩擦产生的摩擦功率。
-
Based on the modeling and analysis of the CO_2 concentration in the tunnels and underground railway with shielding doors,points out that,in winter,with air exhausters on the top of the tracks and at the bottom of the platforms along the railway stations closed and piston air functioning only,the temperature condition can,but the fresh air can not,be satisfied in the tunnels during morning and evening rush hours.
通过对有屏蔽门时地铁隧道和车厢内CO2浓度的建模与分析指出,在冬季如关闭地铁线各车站轨顶站台底的排风机,仅依靠活塞风,在早晚高峰时期能满足隧道中的温度要求,但不能满足列车内人员的卫生要求。
-
The company's main products are: BZ-20ES, BZ-18ES utility mining loaders, the equipment can be used for ballast Tunnels, finding the top, were seized at the end, multi-wall clearance, is a sophisticated tunnel construction machinery; needle beam,穿行Top-and-steel arch concrete lining vehicles; wheel, the rail-lines, electric and internal combustion and hydraulic models at 2.5 M3, 3M3, 5M3, 6M3 series of concrete mixing tanker transport, steel Gongjia Bending special equipment - cold-formed; MTR and construction works under pressure by the pile-pipe, steel support, the steel tube PURLIN; works for pulling the pipe wall lock pile with all the various models of hydraulic Stubbs pile driver; Various public facilities used in steel structure, the grid system, and so on.
公司的主要产品有:BZ-20ES、BZ-18ES型多功能挖掘装载机,可用于隧道的装碴、找顶、捡底、多墙清理,是一种先进的隧道施工机械;针梁式、穿行式以及边顶拱式砼衬砌钢模台车;轮式、轨行式、电动式、内燃式和液压式,型号分2.5M3 、3M3、5M3、6M3 系列砼搅拌输送罐车;钢拱架弯曲专用设备---冷弯机;地铁及建筑桩基工程承压用的钢管柱、钢支撑、钢围檩;工程连续墙锁喉管拔桩用的各种型号全液压拔桩机;各种公共设施用的钢结构、网架制安等。
-
Measuring Tool Factory franchise ultra-high-precision test line, assembly, welding and large flat-panel San Zuobiao measuring machine working platform, central processing platform based equipment, laboratory equipment based platform, large aircraft test platform portfolio, dynamometer at the end of the Airport Railway Board and iron at the end of track, coordinate measuring instrument, crossed machines.
量具分厂专营超高精度检验、划线、装配、焊接平板和大型三座标测量机工作平台,加工中心设备基础平台,实验室设备基础平台,大型飞机检测组合平台,测功机铁底板,铁底轨,三坐标测量仪,划线机等。
-
Including the turntable, Renzi Jia, varying from pulley blocks; off part of the frame, including track and frame (track gauge change will require aircraft to transport state); and arm at the end of the main section arm, the total vehicle weight control in less than 45 tons.
包括转台、人字架、变幅滑轮组;下车部分包括车架和履带架(履带架要求将轨距变到运输状态);以及主臂底节臂,整车总重控制在45吨以内。
- 更多网络解释与轨底相关的网络解释 [注:此内容来源于网络,仅供参考]
-
rail chair:轨底
rail carriage轨道手推车 | rail chair轨底 | rail conditioning unit钢轨矫直精整机组
-
rail bearing:轨枕,轨承,轨底支承面
radial-thrust bearing径向止推轴承 | rail bearing轨枕,轨承,轨底支承面 | rear bearing后轴承(车床)
-
rear bearing:后轴承(车床)
rail bearing轨枕,轨承,轨底支承面 | rear bearing后轴承(车床) | rigid type bearing刚性支承点,刚性支承面非自位滚动轴承
-
rear bearing:后sunthai轴承(车床)
rail bearing轨枕,轨承,轨底支承面 | rear bearing后sunthai轴承(车床) | rigid type bearing刚性支承点,刚性支承面非自位滚动sunthai轴承
-
bilge ballast pump:舱底压载水泵
bilge automatic discharging device 舱底水自动排出装置 | bilge ballast pump 舱底压载水泵 | bilge bed 滑轨
-
guard rail; check rail:护轨
异形轨 compromise rail | 护轨 guard rail; check rail | 轨底坡 rail cant
-
clip plate:夹轨底垫板
clip ped tree ==> 剪形树 | clip plate ==> 夹轨底垫板 | clip quadrat ==> 茎叶干重样方
-
flange rail:宽底轨
flange plate 凸缘板 | flange rail 宽底轨 | flange ring 凸缘环
-
rail flange:轨底
rail-finishing mill钢轨轧机精轧机座 | rail flange轨底 | rail foot轨底
-
track gauge widening:轨距加宽
轨距 track gauge;rail gage;rail gauge | 轨距加宽 track gauge widening | 轨底坡 cant of rail;rail cant