英语人>词典>汉英 : 祊 的英文翻译,例句
祊 的英文翻译、例句

词组短语
offer sacrifices to gods or ancestors in ancient times
更多网络例句与祊相关的网络例句 [注:此内容来源于网络,仅供参考]

The present situation in flood-control and waterlog-drain are analyzed, and the present problems are pointed out.2 The causes and characteristics of the floods in Linyi are summarized, and the flood-control project and the waterlog-drain system in Linyi are also introduced.3 On the basis of summarizing the reconnaissance data of engineering geology, the engineering geology conditions of flood-control projects in the city of Linyi are studied, including the floodway project ,the hinge project, the Ge-Jiu Road Bridge project, the No.327 national highway road bridge project, the E-Huang Road Bridge project, and the Xiaogezhuang's chief inverted siphon project in the project of "Bifurcating the Su River to the Beng River".4 Seepage FEM analyses are carried out on the flood-control projects of Yi River, Beng River and Xiaosu River, respectively.

总结了临沂市洪灾成因及洪水特性,介绍了临沂市城市防洪工程和排涝工程。 3、在综合工程地质勘察资料基础上,分析了临沂市城市防洪工程的工程地质条件,包括:"分涑入"分洪道工程地质条件分析、"分涑入"枢纽工程地质条件分析、"分涑入"葛九公路桥工程地质条件分析、"分涑入"327国道公路桥工程地质条件分析、"分涑入"鹅黄公路桥工程地质条件分析、"分涑入"小葛庄总干倒虹吸工程地质条件分析。

The present situation in flood-control and waterlog-drain are analyzed, and the present problems are pointed out.2 The causes and characteristics of the floods in Linyi are summarized, and the flood-control project and the waterlog-drain system in Linyi are also introduced.3 On the basis of summarizing the reconnaissance data of engineering geology, the engineering geology conditions of flood-control projects in the city of Linyi are studied, including the floodway project ,the hinge project, the Ge-Jiu Road Bridge project, the No.327 national highway road bridge project, the E-Huang Road Bridge project, and the Xiaogezhuang's chief inverted siphon project in the project of "Bifurcating the Su River to the Beng River".4 Seepage FEM analyses are carried out on the flood-control projects of Yi River, Beng River and Xiaosu River, respectively.

总结了临沂市洪灾成因及洪水特性,介绍了临沂市城市防洪工程和排涝工程。 3、在综合工程地质勘察资料基础上,分析了临沂市城市防洪工程的工程地质条件,包括:&分涑入&分洪道工程地质条件分析、&分涑入&枢纽工程地质条件分析、&分涑入&葛九公路桥工程地质条件分析、&分涑入&327国道公路桥工程地质条件分析、&分涑入&鹅黄公路桥工程地质条件分析、&分涑入&小葛庄总干倒虹吸工程地质条件分析。

更多网络解释与祊相关的网络解释 [注:此内容来源于网络,仅供参考]

economic crisis:冪撳峉儂

﹛﹛economic depression 冪撳沭 | ﹛﹛economic crisis 冪撳峉儂 | ﹛﹛economic recovery 冪撳葩劼