- 更多网络例句与楔固定相关的网络例句 [注:此内容来源于网络,仅供参考]
-
After anat omic reducation each speciment was randomly fixed with one of four methods(two c rossed Kirschner pins,four crossed Kirschner pins,stainless steel wire suture and cancellous screws ) and tested.
应用克氏针或松质骨螺钉内固定时,必须在第一跖跗关节稳定的基础上,经第一、二跖骨基底和第三楔骨交叉穿一克氏针或螺钉,使第二跖骨基底得两点固定。
-
The surgery consisted of one-stage posterior transpedicular eggshell technique, and then expanded the eggshell to the adjacent intervertebra including apex vertebra and both cephal and caudal wedge vertebra combined with their posterior elements, after completion of the VCR, instruments were added to achieve temporary stability.
均采用单纯后路扩大&蛋壳&技术切除侧后凸顶椎(包括顶椎邻近的头尾侧楔变的脊椎),截骨节段上下方各应用2~3对椎弓根螺钉固定,通过器械加压矫形关闭切除后形成的间隙观察手术前后侧后凸的矫正率、术中脊柱短缩、术后站立位身高变化及术后整体平衡情况。。
-
They made joints in stone, keeping the lintels in place horizontally using a tongue and groove joint, and subsequently fixing the upright and lintel with a ball and socket joint or mortice and tenon.
石匠们用楔口连接法将楣石水平放置,将石块连接起来,然后将这些直立的石块和楣石用球窝接头或楔口接头来固定。
-
They made joints in stone, keepingthe lintels in place horizontally using atongue and groove joint, and subsequentlyfixing the upright and lintel with a ball andsocket joint or mortice and tenon.
石匠们用楔口连接法将楣石水平放置,将石块连接起来,然后将这些直立的石块和楣石用球窝接头或楔口接头来固定。
-
First, the use of notes 1-1 products for the short form of wedge-type engine connecting circular cone chuck ; 1-2 cards similar form of Shuchi Type ; 1-3 chuck installation : 1-3-1 will be the most fuel piston onto the end 1-3-2 unloaded chuck Fangchenge will chuck fixed transition to the main site, and then push and pull with the adjustment nut to wedge tube wrenches hearts sets top face below the front face plate intimate 1mm; 1-3-3 loaded Fangchenge; 1-4 regular monthly use of the process should be clear brush to avoid internal malfunction.
请各位大虾帮小弟翻译一下使用说明书不胜感激!一、使用说明 1-1 本产品为短圆锥连接形式的楔式动力卡盘;1-2卡爪形式为梳齿式;1-3 卡盘的安装: 1-3-1 将油缸活塞推到最前端 1-3-2 卸下卡盘防尘盖,将卡盘固定到主轴过渡盘上,然后用筒子扳手调整推拉螺母使楔心套顶面低于盘体内腔前端面1mm; 1-3-3 装上防尘盖; 1-4 使用过程中应每月定期清刷,以免内部发生故障。
-
NXL Series strain clampis suitable for distribution wire up to 10kV,fixing the aerial insulation aluminium conductor or naked aluminium conductor on the rotate angle or insulator of terminal strain pole, and then fixing and tighting the aerial conductor ,insulation cover and strain clamp are used together.
NXL系列楔型耐张线夹适用于10kV及以下配电线路中,将架空绝缘铝导线或裸铝导线固定在转角或终端固定在转角或终端耐张杆的绝缘子上,从而将架空导线固定或拉紧,绝缘罩与耐张线夹配套使用,起绝缘防护作用。
-
The float plate block and slide block are controlled by the two-way wedge and located by the ringer.
该模具的凹模由固定部分和活动部分组成,浮动凹模镶块和滑块部分由双向斜楔控制、套环定位,保证了横向和纵向压料的精度,满足了零件质量要求。
- 更多网络解释与楔固定相关的网络解释 [注:此内容来源于网络,仅供参考]
-
Hatch coaming:舱口围
注:PONTOON TYPE HATCH是只舱口上盖上一块块的铁质或是木质盖板,上面再盖上三层防水帆布(TARPAULIN),帆布边缘在舱口围(HATCH COAMING)处以铁板条压著再以木楔固定紧实,因而达到WEATHER TIGHT的要求,属老式设计,目前很少看到了.
-
Michell:米契尔
可以认为:流体动压密封是米契尔(michell)或者金斯伯里(kingsbury)可倾瓦块式动压轴承与机械密封的联合;流体静压密封则是固定油楔面的油囊式(oilpocket)静压轴承与机械密封的联合.
-
tarpaulin:帆布
注:PONTOON TYPE HATCH是只舱口上盖上一块块的铁质或是木质盖板,上面再盖上三层防水帆布(TARPAULIN),帆布边缘在舱口围(HATCH COAMING)处以铁板条压著再以木楔固定紧实,因而达到WEATHER TIGHT的要求,属老式设计,目前很少看到了.
-
tarpaulin:防水帆布
注:PONTOON TYPE HATCH是只舱口上盖上一块块的铁质或是木质盖板,上面再盖上三层防水帆布(TARPAULIN),帆布边缘在舱口围(HATCH COAMING)处以铁板条压著再以木楔固定紧实,因而达到WEATHER TIGHT的要求,属老式设计,目前很少看到了.
-
setting up time:接线时间
setting up piece 固定垫片 | setting up time 接线时间 | setting up 用楔垫起;调定