英语人>词典>汉英 : 梁 的英文翻译,例句
梁 的英文翻译、例句

基本解释 (translations)
girder

更多网络例句与梁相关的网络例句 [注:此内容来源于网络,仅供参考]

The instructive conclusion was: 1 under the vertical loading, the shear-lag effect was produced badly, more severer under concentrated loading than under uniform loading .2 the longitudinal bending deformation of the beam flange was true of the imitating plane assumption of deformation . 3 the width length ratio was confirmed as the first factor working on the shear-lag effect among all the geometric parameters;4 the shear-lag coefficient of simple-supported box-girder was severer than the continuous box-girder, the shear-lag effect in the inner supported section of continuous beam was much more severer, we need paying more attention for it in designing. 5 the non-liner characteristics of material deformation have littlie influence on shear-lag effect in BGCW. 6 the experiential calculating formulation and calculating diagram for the effective flange width was raised with the only factor of the width-span ratio., but the primary location of axis of bending moments should not be changed while calculating the inertial moment .

研究认为:1室内模型试验和空间有限元分析结果均表明波形钢腹板组合箱在竖向荷载作用下,翼板出现了典型的纵向应力剪滞效应。2在竖向荷载作用下,截面高度上各点纵向正应变分布认为可符合"拟平截面假定",以此作为波形钢腹板组合箱抗弯计算的基本假定。3箱宽跨比是影响波形钢腹板组合箱翼板剪滞效应的主要因素。4连续波形钢腹板组合箱的翼板剪滞系数大于简支,且连续箱内支点截面翼板剪滞效应相当严重,对此需十分重视。5当混凝土翼板受力由弹性阶段进入弹塑性阶段时,材料的非线性特性对翼板的剪滞效应影响甚微。6提出了根据组合箱的宽跨比参数来计算翼板有效宽度比的经验公式和计算图表,但箱截面抗弯惯性矩的计算不应改变原先的截面中和轴位置。

Combining with the National Natural Science Foundation ofChina(No.50478032), following researches were done in this thesis: 1 The variation regularity of the ultimate anti-bending capacity of therectangular-sectioned beam with different corrosion has been obtained through thequalitative analysis of 48 beams (32 corroded beams and 12 comparing beams) withaccelerated corrosion; 2 The conclusion has been obtained that the strain of corroded steel bar andconcrete no longer fit in with the assumption of plane section through the analysis ofthe strain data, the strain relation of steel bar and concrete in the mid-span section ofvariously corroded beams at ultimate has been obtained. Through the building of newgeometric relation, the expression of the height of compressive area in the corrodedbeam with rectangular section has been deduced, and the formula with corrosion rateas the main variable for the anti-bending capacity of the corroded concrete beam hasbeen suggested and verified by experiment.; 3 The influence of steel bar corrosion and the concrete regression to the flexureductility coefficient of the corroded structure component has been analyzed. Based onthe relation of steel bar and concrete at yield and ultimate, the expression for theflexure at yield and ultimate of corroded reinforced concrete beam, and the model forthe calculation of the flexure ductility has been built.

本文结合国家自然科学基金项目(50478032)"既有钢筋混凝土桥时变可靠度研究",主要进行了以下研究工作: 1通过对48根快速锈蚀钢筋混凝土矩形截面(32根锈蚀和12根对比试验)数据的定性分析,得到了不同锈蚀率下,锈蚀钢筋混凝土矩形截面极限抗弯承载力的变化规律; 2通过对应变数据的分析,论证了锈蚀构件钢筋和混凝土的应变不再符合平截面假定的结论,并通过回归分析得出了不同锈蚀率的螺纹钢筋和光圆钢筋在极限弯矩作用下,跨中截面处钢筋应变和钢筋处混凝土应变的关系,通过构造新的几何关系,得出了锈蚀钢筋混凝土矩形截面计算受压区高度的表达式,既而得出了以锈蚀率为主要变量的锈蚀钢筋混凝土矩形截面的正截面抗弯计算建议公式,并通过试验数据加以验证; 3分析了钢筋锈蚀和混凝土劣化对锈蚀构件曲率延性系数的影响,结合钢筋屈服和极限弯矩两种状态下钢筋和混凝土的应变关系,分别得到了锈蚀钢筋混凝土矩形截面屈服曲率和极限曲率的计算表达式;既而推导出曲率延性系数的计算模型。

First of all, the paper carried out test study on four two-spanned model members of FSMRCWB, including three 1/2-scaled two-storeyed models and one 1/3-scaled three-storeyed model. The paper analyzed the test results, including analysis on mechanical property of the composite wall beam under vertical loads, and failure mode, deformation capacity, aseismic performance under horizontal loads and constant vertical loads. Secondly, the nonlinear property of concrete is studed and the nonlinear models of FSMRCSS is builded by ANSYS. Last, The paper studies the result of ANSYS, which mainly includes the loading-displace curve of FSMRCSS under horizontal loads and constant vertical loads, the mechanics of arch under vertical loads lonely and under horizontal loads and constant vertical loads respectively, and status of the distribution and changing of vertical stress and cross shear on the surface of the suporting beam, and the influence of span ratio and hole.All in all, the caculating results are in good agreement with the test results.

本文首先进行了三个1/2比例的两跨两层和一个1/3比例的两跨三层的框支密肋复合墙的模型试验,分析了框支密肋复合墙在竖向荷载作用下的受力性能,以及在竖向荷载与水平低周反复荷载共同作用下的受力性能、变形性能、滞回性能、耗能系数及破坏形态;其次,研究了混凝土的非线性特性,建立了框支密肋复合墙非线性有限元模型,并借助大型通用有限元软件ANSYS进行计算;再则,进行了非线性有限元结果分析,主要研究框支密肋复合墙在竖向荷载与水平地震力共同作用下的荷载位移曲线,分析在竖向荷载单独作用下和在竖向荷载与水平地震力共同作用下墙的拱作用,托顶面的竖向应力和横向剪应力分布及变化情况,并讨论跨度比、洞口对墙拱作用和托顶面的竖向应力的影响。

Located in Gu Ting Shan Economic Developing Zone, LiuZhouCity, Lihe covers more than 10,000 square meters, in which more than 6000 square meters are plants. Lihe has excellent technical measuring devices and laboratory equipment including 1 damping device production line , 2 上边梁装饰条 lines, 4 sebific duct lines, a 14"and a 16" rubber processing mills, a 35 litre 密炼机, 13 50-100 tone 电动液压成型机,ect.

公司位于广西工业重地柳州市古亭山经济开发区乐业园,占地面积1万多平方米,其中生产面积6000多平方米,现公司主要设备有2条阻尼胶生产线,2条上边装饰条生产线、4条胶管生产线、1台14寸炼胶机,1台16寸炼胶机,1台35升密炼机,13台50-100吨电动液压成型机,12台注塑机和2百多套产品模具,以及良好的技术检测手段和实验设备。

Located in Gu Ting Shan Economic Developing Zone, Liu Zhou City, Lihe covers more than 10,000 square meters, in which more than 6000 square meters are plants. Lihe has excellent technical measuring devices and laboratory equipment including 1 damping device production line , 2 上边梁装饰条 lines, 4 sebific duct lines, a 14"and a 16" rubber processing mills, a 35 –litre 密炼机, 13 50-100 tone 电动液压成型机,ect.

公司位于广西工业重地柳州市古亭山经济开发区乐业园,占地面积1万多平方米,其中生产面积6000多平方米,现公司主要设备有2条阻尼胶生产线,2条上边装饰条生产线、4条胶管生产线、1台14寸炼胶机,1台16寸炼胶机,1台35升密炼机,13台50-100吨电动液压成型机,12台注塑机和2百多套产品模具,以及良好的技术检测手段和实验设备。

The "forest hot springs in East China First" reputation of Ninghai hot springs, has been in operation since last year more than 1000 million, the development of forest hot springs resort, is now operating test; input of more than 500 million Mountain梁皇path along the cliff, to the refurbishment of sites to tour St.

有&华东第一森林温泉&美誉的宁海温泉,去年至今已投入1000多万元,开发森林温泉度假村,现已试营业;投入500多万元对皇山景区栈道、景点进行整修,以游圣徐霞客的开游篇打品牌,突出&天下旅游、宁海开游&的主题形象。

The arch bending on the top of the original main arch ring corresponds to every arch rib and the bottom beam on its landscape orientation. As a result it becomes a down arc frame similar to slab-and-beam floor system. On the arch bending and bottom beam just established, standing pillar, main beam, horizontal rib beam and bridge front-panel would be built subsequently. Both ends of the main beam would then be put off the new hat beam made of reinforced concrete. Now, it becomes an upper slab-and-beam floor system. Two decks will be joined together on the middle of the bridge, which forms the ability of spanning and loading.

在原主拱圈拱肋相应位置处增设拱伏,横向增设底,形成一个下层弧形的类似肋楼盖的结构;在已浇筑好的拱伏与底上,继续现浇立柱、主和横向肋、桥面板,主的两端搁置在桥台处新增加的钢筋混凝土台帽上,形成一个上层肋楼盖结构,并且上下两层楼盖在桥跨中互为渗透结合成一个牢固的整体,共同完成了跨越和承载的能力。

Our grab nickel production, nickel is mainly used to crawl,铁精粉, red clay minerals such as highly viscous due to the recent nickel 铁精粉, red clay and other minerals to be widely used, so Many major ports on the existence of such a problem, in which the ore handling when loading and unloading there is a low efficiency, has been a lot of ore grab adhesive wall, our company in order to solve this dilemma has been studied and produced by such a professional crawl very sticky ore grab, the principle is: grab the next 承梁 calculated to increase the adoption of two pieces of solder, including the specific location of board and grab the bucket to create a circular flap, so Open grab discharging, the fight is on board, including the body wall from the top down (no contact with body panels Doo), to stick the body in fighting the viscous wall down, including mine, so, which greatly improved the handling grab the efficiency of ports and factories to solve the problem, which is purpuratus grab a patent, other manufacturers can not be produced.

我公司生产的镍矿抓斗,主要用来抓取镍矿、铁精粉、红粘土等粘性很强的矿石,由于近来镍矿、铁精粉、红粘土等矿石在被人们广泛使用,因此,许多大港口就存在着这样一个问题,在装卸这此矿石的时候,存在着装卸效率低,抓斗内壁被很多矿石粘着,我公司为了解决这一难题,现已研究并生产出来这种专业抓取很粘的矿石抓斗,原理是:在抓斗的下承上通过计算得出要加焊俩块括板的具体位置,并要把抓斗的斗瓣做成圆形,这样在抓斗打开卸料时,括板就在斗体内壁从上而下,把粘在斗体内壁的粘矿括了下来,所以,这就大大提高了抓斗的装卸效率,为港口和工厂解决了这一难题,这种抓斗是紫石的一项专利,其它厂家是无法生产出来的。

Our grab nickel production, nickel is mainly used to crawl,铁精粉, red clay minerals such as highly viscous due to the recent nickel 铁精粉, red clay and other minerals to be widely used, so Many major ports on the existence of such a problem, in which the ore handling when loading and unloading there is a low efficiency, has been a lot of ore grab adhesive wall, our company in order to solve this dilemma has been studied and produced by such a professional crawl very sticky ore grab, the principle is: grab the next 承梁 calculated to increase the adoption of two pieces of solder, including the specific location of board and grab the bucket to create a circular flap, so Open grab discharging, the fight is on board, including the body wall from the top down (no contact with body panels Doo), to stick the body in fighting the viscous wall down, including mine, so, which greatly improved the handling grab the efficiency of ports and factories to solve the problem, which is purpuratus grab a patent, other manufacturers can not be produced.

普通会员不能显示联方式,只能给他留言我公司生产的镍矿抓斗,主要用来抓取镍矿、铁精粉、红粘土等粘性很强的矿石,由于近来镍矿、铁精粉、红粘土等矿石在被人们广泛使用,因此,许多大港口就存在着这样一个问题,在装卸这此矿石的时候,存在着装卸效率低,抓斗内壁被很多矿石粘着,我公司为了解决这一难题,现已研究并生产出来这种专业抓取很粘的矿石抓斗,原理是:在抓斗的下承上通过计算得出要加焊俩块括板的具体位置,并要把抓斗的斗瓣做成圆形,这样在抓斗打开卸料时,括板就在斗体内壁从上而下,把粘在斗体内壁的粘矿括了下来,所以,这就大大提高了抓斗的装卸效率,为港口和工厂解决了这一难题,这种抓斗是紫石的一项专利,其它厂家是无法生产出来的。

Secondly, a theoretical dual rigid-plastic modal under lateral impact of blunt indenters is firstly developed in order to predict damage pipeline which is fully clamped across a span based on rigid-plastic beam on a perfectly plastic foundation, which is made up of a rigid-plastic sub-beam and a rigid-plastic basic-beam, the rigid-plastic sub-beam is used to predict denting deformation, the rigid-plastic basic-beam is used to predict global deformation, the sub-beam and the basic-beam interact by a perfectly plastic foundation.

为了更好地估计钝头弹体冲击对管道造成损伤,在刚塑性地基模型的基础上,首先提出了一种新的理论计算模型一双重刚塑性模型,由一子和一基构成,子用来估计弹体撞击造成的局部损伤,基用来估计弹体撞击造成的整体弯曲,子和基通过基础反力相互作用。

更多网络解释与梁相关的网络解释 [注:此内容来源于网络,仅供参考]

arched girder:拱梁, 弓形梁

arched beam 拱, 弓形 | arched girder 拱, 弓形 | archimedes' principle 阿基米德原理

I beam:工字梁;I形梁

I joist 工字形小 | I-beam 工字;I形 | igneous rock 火成岩

bridle beam:舱口活动梁舱口梁

bridle beam 舱口活动 | bridle beam 舱口活动舱口 | bridle chain 短链

carline:短纵梁

carline knee 短纵肘 | carline 短纵 | carline 短纵;舱口纵

carline:短纵梁;舱口纵梁

carline 短纵 | carline 短纵;舱口纵 | carling knee 舱口纵肘板

trabecular meshwork:小梁网,小梁网状结构

trabeculae of corpora cavernosa penis 阴茎海绵体小 | trabecular meshwork 小网,小网状结构 | trabeculation of bone 骨小形成

Tony Leung:梁朝伟

"眼睛最会放电的好男人"朝伟 (Tony Leung) 介绍:称雄戛纳影展的香港最好的男演员之一朝伟 (Tony Leung) 是土生土长的香港人. 朝伟自小父母离异,家境贫寒. 朝伟15岁辍学,曾先后当过报童、会计,卖过电器. 朝伟正式踏进演艺界,

trabecular meshwork:小梁网,小梁网状结构

trabeculae of corpora cavernosa penis 阴茎海绵体小 | trabecular meshwork 小网,小网状结构 | trabeculation of bone 骨小形成

beam knee:梁肘板梁肘材

beam knee 肘板 | beam knee 肘板肘材 | beam knee 肘材

beam camber:梁弧高,梁拱高

肘板 beam bracket | 弧高,拱高 beam camber | 垫材(木船) beam chock