英语人>词典>汉英 : 桁 的英文翻译,例句
桁 的英文翻译、例句

基本解释 (translations)
girder  ·  joist  ·  viga

更多网络例句与桁相关的网络例句 [注:此内容来源于网络,仅供参考]

One of two spar s or booms projecting from the side of a bowsprit for spreading the jib or flying - jib guys.

左右撑杆从船首斜侧边支出的两根圆杆或桅下的一根,用于展开三角帆或伸开三角帆的绳索

A small boat used for fishing,sailing,or coasting and having two or three masts,each with a lugsail,and two or three jibs set on the bowsprit.

小帆船用于捕鱼,航海或沿海贸易的小船,它有两三个桅杆,每个桅杆都有斜四角帆,在船看斜有两三个三角帆

A small boat used for fishing,sailing,or coasting and having two or three mast s,each with a lugsail,and two or three jibs set on the bowsprit.

小帆船用于捕鱼,航海或沿海贸易的小船,它有两三个桅杆,每个桅杆都有斜四角帆,在船看斜有两三个三角帆

A large jib used on a racing yacht.One of two spars or booms projecting from the side of a bowsprit for spreading the jib or flying-jib guys.

左右撑杆从船首斜侧边支出的两根圆杆或桅下的一根,用于展开三角帆或伸开三角帆的绳索

This bridge design for 2×80m the continual steel truss girder bridge, the span is 160m, the main spar center distance is 5.75m, clothes rack high 11m, panel length 8m, the main spar geometry graphical representation uses the triangle web member system, the floor system by the carline, the crosnbeam is composed, the member connection uses the high-strength bolt connection, the design load for the dead load and - the live load.

该桥设计为2×80m连续钢梁桥,全长为160m,主中心距为5.75m,高11m,节间长8m,主的几何图示采用三角形腹杆体系,桥面系由纵梁,横梁组成,杆件连接采用高强螺栓连接,设计荷载为恒载和中—活载。

Type: Big Class Gaff-Rigged Cutter - Builder: White Brothers, Southampton, 1920 designed by Herbert White LOA: 46.30m Length on waterline吃水线长: 24.60m Beam船宽: 7.60m Draught吃水: 5.20m Displacement排水量: 180t Mast, boom, gaff and bowsprit桅杆,下桁,斜桁,船首斜桁: 52m, 27.60m, 16m, and 9.5m in spruce Sail area: 1450m2 Sails: in Dacron, sewn with traditional techniques Engine: Yanmar 380HP Motoring speed: 9 knots Speed under sail: approx.

船型:Big Class斜帆船-建造:怀特兄弟,南安普顿,1920年设计:赫伯特。

A rope, rod, or batten along the upper side of a yard, gaff, or boom to which a sail is fastened.

天篷支索吊在帆、斜或木上面的绳、杆或压条,用来收紧帆

Constraint of the middle truss on the crossbeams approximates to absolute rigidity and the distance between the stringer and the middle low chord are small in the four-line through truss bridge with three main trusses, which produces much larger horizontal bending stresses of the crossbeams as compared with two-truss bridges.

在四线铁路三主下承式钢梁桥中,中对横梁的约束近于绝对刚性,纵梁离中下弦杆的距离较小,使横梁的面外弯曲应力较二主桥梁大得多。

Any of several parts of standing rigging strengthening the bowsprit and jib boom against the force of the head stays.

艏斜撑杆,艏斜撑杆支索一种直立索具,用以加固船首斜和船斜帆,以抵御船头支索力量

In this paper, the through truss composite beam is first equalized to a box beam and the progression solutions to the temperature effect of the composite beam are then obtained with the variation method.

首先将下承式梁结合梁等效为箱形梁,再用变分法求出了下承式梁结合梁温度效应的级数解,并对京沪高速铁路上的一座简支下承式钢结合梁桥进行了计算,其结果可供下承式梁结合梁设计参考。

更多网络解释与桁相关的网络解释 [注:此内容来源于网络,仅供参考]

crossjack yard:后桅下桁

后桅下起帆索 cross-jack leech line | 后桅下 crossjack yard | 后桅下帆横 crossjack yard

foretop brace:前中桅横桁转桁索

forestaff 十字测天仪 | foretop brace 前中桅横索 | foretop 前桅楼

gaff-topsail:斜桁帆

纵帆 gaff sail | 斜帆 gaff topsail | 斜帆,斜纵帆 gaff trysail

gaff-topsail yard:斜桁帆帆桁

中桅帆 gaff-top-sail | 斜帆帆 gaff-topsail yard | 舰载鱼鳞外板敞艇 galley boat

deck girder:甲板纵桁

材 Bottom side girder | 甲板纵 Deck girder | 横 Cross girder

bottom side rail:下桁材

bottom side girder 旁底 | bottom side rail 下材 | bottom side rail 下

bottom side rail:下桁梁

bottom side rail 下材 | bottom side rail 下梁 | bottom side rail 下梁集装箱)下

bottom side rail:下桁梁集装箱)下桁材

bottom side rail 下梁 | bottom side rail 下梁集装箱)下材 | bottom side rails 集装箱)下

gaff trysail:斜桁帆,斜桁纵帆

帆 gaff topsail | 斜帆,斜纵帆 gaff trysail | 斜双桅帆船 gaff yawl

stringer plate:纵桁;纵桁板

stringer plate 纵 | stringer plate 纵;纵板 | stringer strake 甲板边板