英语人>词典>汉英 : 枢纽 的英文翻译,例句
枢纽 的英文翻译、例句

枢纽

基本解释 (translations)
hinge  ·  hinging

词组短语
key position
更多网络例句与枢纽相关的网络例句 [注:此内容来源于网络,仅供参考]

The science reasonable definite key position transportation facility construction the order of priority, provides the basis for the science reasonable plan and the management transportation infrastructure construction.Determined reasonably synthesis transportation key position development scale and construction key, a plan, implements by stages, formsthe necessary consummation gradually in the plan time, the function complete Sichuan Yunnan Guizhou Province intersection region comprehensive transportation key position.

科学合理的确定枢纽交通设施建设的优先顺序,为科学合理规划和管理交通基础设施建设提供依据,合理地确定综合交通枢纽的发展规模和建设重点,一次规划,分期实施,在规划期内逐步形成配套完善,功能齐全的川滇黔结合部区域综合性交通枢纽

First chapter is the summary, mainly introduced the project basic survey; Second chapter for the dam site hydrology characteristic, introduced the Hubei -01 key project in the basin specially is nearby the dam site hydrometeorology survey; Third chapter for the key position and the storehouse district terrain geology condition, introduced explained the dam site specially is nearby the dam spool thread terrain geology condition; Fourth chapter for the key position building shaping and the hydrology computation, including determined key position the project rank, the building shaping, adjusts Hong to calculate, blows off the bottom hole cross section size drawing up with initially to draw up the key position scheme of arrangement; Fifth chapter draws up for the size with the dam body arrangement, including the shaping, the Liang section plane determination, the dam body dam base guards against infiltrates the draining water facility the arrangement and the dam body plane arrangement and the stress stable analysis computation; Sixth chapter for the flood discharge design, mainly is the top of dam detailing and the downriver disappears can design; Seventh chapter for blows off the building the design, mainly is to imports the building the detailing strobe arrangement and Kong Shen and the exportation disappears can the design; Eighth chapter pilots the system and the power plant workshop design for the power plant, mainly is directs the system and the power plant workshop design to the power plant; Ninth chapter is ground processing, including ground excavating, the cleaning up, solidifies the grouting, the curtain is in the milk and all that some processing measure.

第一章为综述,主要介绍了工程的基本概况;第二章为坝址水文特性,介绍了鄂-01枢纽工程所在流域特别是坝址附近的水文气象概况;第三章为枢纽及库区地形地质条件,介绍说明了坝址特别是坝轴线附近的地形地质条件;第四章为枢纽建筑物的选型及水文计算,包括确定枢纽的工程等级,建筑物选型,调洪演算,放空底孔断面尺寸的拟定和初步拟定枢纽布置方案;第五章为拱坝尺寸拟定和坝体布置,包括拱坝的选型、拱冠梁剖面的确定、坝体坝基防渗排水设施的布置及坝体的平面布置和应力稳定分析计算;第六章为泄洪的设计,主要是坝顶的细部设计和下游消能设计;第七章为放空建筑物的设计,主要是对进口建筑物的细部设计闸门布置及孔身和出口消能的设计;第八章为电站引水系统及电站厂房设计,主要是对电站引系统和电站厂房的设计;第九章为地基处理,包括地基的开挖,清理,固结灌浆,帷幕灌浆以及其他一些处理措施。

Damsite selection of Yilan Navigation Hydro- junction on Songhuajiang River;2. Study on the general layout scheme for reinforcement and extension project of Guoyang junction sluice;3. The river reach of Dadingzishan Navigation-power junction engineering is characterized by wide grade II terrace,large distance between the two dikes,thick covering of river bed,and strong movability and permeability of riverbed,and the overall layout is the essence of construction of low-head navigation-power junction on the reach.

松花江大顶子山航电枢纽工程河段具有Ⅱ级台地宽、两岸堤距大、河床覆盖层厚、河床质可动性及渗透性强等特点,该河段兴建低水头航电枢纽工程其总体布置是关键,利用正态物理模型(11∶00)及遥控自航船模等研究手段,对大顶子山航电枢纽工程预可、工可、初步设计及施工图设计等阶段枢纽总体布置进行了多方案比选,提出枢纽主要建筑物布置:自右岸依次为船闸、10孔泄水闸、电站、28孔泄水闸及土坝。

The whole multi-Agent system runs based on the continuous communication among agents. The architecture of the cloverleaf is variable, the beeline, the round curve and the convolute curve is the basic elements for the plane curves,the longitudinal gradient reflects the change of the vertical section. We consider sufficiently these specific factors in building road Agent. The different parameters are set to describe the geometrical characteristic and traffic characteristic.

立交枢纽的线形多变,直线、圆曲线与缓和曲线为平面线形组成的三个基本要素,坡度反应纵断面的路线起伏,本文在建立路段智能体中充分考虑了这些立交枢纽的特有要素,为每个智能体设置了不同的几何特性及交通特性,并在决策单元中加入对车辆驶入、换道、超车、限速等的智能控制模型,使得车辆智能体能够在由路段智能体相互连接组成的立交枢纽上正常行驶。

240V and 50Hz Luer lock-type reusable needles, metal hub,18 gauge, 40mm, box of 100 Luer lock-type reusable needles, metal hub, 16 gauge, 25mm, box of 100 Luer lock-type reusable needles, metal hub, 14 gauge, 25mm, box of 100 Luer lock-type reusable needles, metal hub, 20 gauge, 30mm, box of 100 Intravenous catheters, 16 gauge, 50mm (2"0) 3 litre intravenous fluid administration bags, with attached tube Simplex IV Bell or equal, high quality latex, 10cm (4") Tubing Kelley Forceps 14 cm, curved Capacity 1 litre, max 1,000 rpm Mayo Dissecting Scissors 14 cm, curved, standard bevelled blades or equal Metal pre-set multi-dose syringe to deliver 0.1ml, with accessories and spares Batch operation for food/meat Portable, for internal determination of foreign bodies in livestock, and magnetic retractor Multi-dose Syringe, 30 ml capacity, adjustable dose of 1-30 ml Henke Vetmatic metal multi-dose syringes, capacity 10 ml with tube feed Nasogastric tubes, 13mm (1/2) outside diameter abd 2.5m (8 feet) long 'Record' type intr-dermal needles as recommended for mclintock syringe or similar Oral dosing syringe for deworming connect various sizes of supply bottles, adjustable dose of 1 to 50 ml Parasite control sprayer back-pack, minimum capacity 10 litre, hand pump for pressure delivery without taking off back.

- 240V的和50 Luer锁型可重复使用的针头,金属枢纽, 18针, 40毫米, 100盒 Luer锁型可重复使用的针头,金属枢纽, 16个指标, 25毫米, 100盒 Luer锁型可重复使用的针头,金属枢纽, 14个指标, 25毫米, 100盒 Luer锁型可重复使用的针头,金属枢纽, 20个指标, 30毫米, 100盒静脉导管, 16个指标,使用50mm ( 2 & 0 ) 3升静脉输液袋,附有管单纯四贝尔或等于高品质乳胶, 10厘米( 4 &)油管凯利钳十四厘米,弯曲容量1公升,最大转速1000 梅奥解剖剪刀14厘米,弯曲,标准斜切刀片或等于金属预先设定多剂量注射器提供0.1毫升,与配件和备件批量操作的食物/肉便携式,内部确定异物牲畜和磁缩多剂量注射器, 30毫升的能力,可调节剂量的1月30日毫升亨克Vetmatic金属多剂量注射器,容量10毫升管饲料鼻饲管, 13毫米( 1 / 2 )外径阿卜德250 ( 8英尺)长'记录'类型中断真皮针头作为建议麦克林托克注射器或类似口服注射器的驱虫连接各种尺寸的供应瓶,可调剂量为1至50毫升寄生虫控制喷雾器回包,最小容量10升,手泵的压力下交付起飞返回。

This text analyzes the concept of the environment geology, settle the geology data by survey and the history data of junction area of Hydroelectric Power Station. elaborate the basic geology characteristic of dam area especially junction area, analyze the problem of geology environment in junction area concluding protogenic geological environment and protogenic geological environment. analyze the Physical geology phenomenon such as collapse and mudflow...etc. predict the probability evoked by earthquake in junction area.

本文通过对环境地质概念的辨析,对泸定水电站枢纽区踏勘所得的地质资料和历史资料进行了整理分析,阐述了泸定水电站库坝区特别是枢纽区的基本地质特征,着重分析了枢纽区的环境地质问题,包括原生地质环境及次生地质环境,对枢纽区的物理地质现象如滑坡、泥石流等做了简单的论述分析,并简单预测了枢纽区可能诱发地震的概率。

It is analyzed the effects of introducing high speed railway into existing railway terminal in the aspects of terminal stations,tracks,untwining equipments,urban economy,special distribution and public transportation system and offer reference for transportation development general planning and urban traffic planning.

因此,从枢纽车站、线路、疏解设备以及城市经济、空间格局、公共交通系统发展等角度出发,有关高速铁路引入对既有铁路枢纽枢纽城市的影响的系统分析,可为交通运输发展总体规划及城市交通规划提供参考。

The study on methods and applications of road passenger transport hub theory and its general layout planning makes the work of layout planning more standard and scientific. It will provide scientific basis for road passenger transport hub layout planning, make hub layout more scientific, rational and make full use of the transport hub. The study will help coordinate the hub and other passenger transport way, promote the city's and the region's economic development. The research improves the planning level of road passenger transport hub's basic facilities and advances the modernization of traffic planning works. The study has important theoretical significance and practical value.

对道路客运枢纽理论及总体布局规划方法和应用的研究具有一定的理论意义和实用价值,一方面它有利于推进道路客运枢纽布局规划的规范化和科学化,为道路客运枢纽布局提供科学依据,使布局更加科学合理,有效发挥道路客运枢纽的功能,使其与其它客运方式有机协调,促进枢纽所在城市和区域社会经济的发展;另一方面它有利于促进和提高客运基础设施的规划水平,推进运输规划工作的现代化。

It enumerates the restrictive terms in the calculation.; It brings forward different kinds of calculating strategy. It also designs the wagon flow track table and transport capacity computative table of the junction terminals.

本论文主要研究铁路枢纽通过能力计算方法理论和用计算机来实现的问题,具体内容为:1 论述了铁路枢纽通过能力的基本概念,枢纽通过能力的组成和影响枢纽通过能力的因素,这些是计算铁路枢纽通过能力的基础。;2 分析了枢纽通过能力计算方法理论。

The paper divided the highway transportation junctions layout into three means, and give different planning objection, principle, method and different scheme definite models.

本文将道路运输枢纽布局规划方法分为道路运输枢纽网络规划、一般道路运输枢纽系统布局规划和复杂道路运输枢纽系统布局规划进行研究,根据规划对象的特征提出不同的规划目标、原则和方法,给出不同的方案优化模型。

更多网络解释与枢纽相关的网络解释 [注:此内容来源于网络,仅供参考]

radio central office:无线电枢纽台

radio center 无线电集中台 | radio central office 无线电枢纽台 | radio ceramics 高频陶瓷

ginglymus:枢纽关节,屈戌关节

ginglyform 屈戍样的 | ginglymus 枢纽关节,屈戌关节 | ginkgetin 银杏黄素

ginglymus joint:枢纽关节

龈口炎 gingivostomatitis | 枢纽关节 ginglymus joint | 胸带 girdle

hin ge:铰链、枢纽

角接触轴承 angular contact bearing | 铰链、枢纽 hin ge | 校正平面 cor recting plane

Transportation hub:交通枢纽

矿泉疗养院 spa hotel | 交通枢纽 transportation hub | 出土文物 unearthed relics

Transportation hub:交通枢纽,交通中心

airport bus机场巴士 | transportation hub交通枢纽,交通中心 | incheon international airport仁川国际机场

linchpin:车轴销;制轮楔;关键;枢纽

linage-counter 行计数器 | linchpin 车轴销;制轮楔;关键;枢纽 | lincoln weld 焊剂层下自动焊

public transport parking place:公共交通枢纽

public transport network 公共交通车站 q4]|_{ | public transport parking place 公共交通枢纽 | public transport junction 城市公共交通规划 5K>*gnG

hinge fault:枢纽断层

hinge belt 枢纽带 | hinge fault 枢纽断层 | hinge joint 铰链连接

stub-end type junction terminal:尽端式枢纽

混合形枢纽 combined type junction terminal | 尽端式枢纽 stub-end type junction terminal | 站线 siding; station track; yard track