英语人>词典>汉英 : 有两面的 的英文翻译,例句
有两面的 的英文翻译、例句

有两面的

基本解释 (translations)
bilateral  ·  bifacial

词组短语
two-sided
更多网络例句与有两面的相关的网络例句 [注:此内容来源于网络,仅供参考]

Sunset clouds has comfortable pragmatic simple furniture within the red floor house , living room white hangs on the wall to oil painting having personage or scenery, bedding has the bilayer milk white quilt on bedroom 180 CM * 200 CM bed , both sides readjusts oneself to a certain extent the desk lamp having two Bixa orellana pole light yellow modelled after antiques charpie lamp shade to may adjust luminosity on the head of a bed on the bedside cupboard , the bedroom *allpox gushes the coating material blue seabed pattern having fluorescence, the queen who puts out the light in the evening may issue fluorescence , fluorescence is a dolphin and a group of fingerling.

晚霞红地面的屋内有简单舒适实用的家具,客厅白色墙上挂有人物或风景的油画,卧室180CM*200CM床上铺垫有双层奶白色被子,床头两旁床头柜上放有两盏红木仿古支杆淡黄绒布灯罩可调节光度的台灯,卧室的天花喷有荧光的蓝色海底图案的涂料,晚上熄灯后可发出荧光,荧光是一个海豚和一群小鱼。

He had no time for double-faced GC and his leadership.

他没有时间为有两面的GC 和他的领导。

There used to be two primary methods to optimize program data locality: the first is to analyze cache behavior of program data, then basing on cache behavior model, build a program analysis tool which shows the bottlenecks of data cache performance and hence directs programmer to tune performance of data cache; the second is program transformation by an optimizing compiler or an optimizing tool, and data cache performance is optimized in the transformation.

过去在这方面的工作有两个重要的思路:一是针对程序运行时的访问数据,利用相关的Cache行为模型,建立一些程序分析工具,从源代码级给出程序Cache性能的瓶颈,指导程序员通过程序变换来优化程序的局部性,从而提高Cache性能;二是在编译器上开发编译优化过程,或者开发专门的程序优化工具,通过对程序进行分析,在此基础上自动进行程序变换,包括代码变换和数据变换两种,优化程序的局部性,从而提高 Cache性能。

The thing always is bifacial, I hope everybody sees the one side of thing sunshine.

事情总是有两面的,我希望大家看到事物阳光的一面。

A machine component comprising: an elongated base plate with side edges, a linear actuator assembly having two parts which can move away from and toward each other, first mounting means on said base plate, said mounting means supporting one part of said assembly, a slide plate rectangular in cross-section and having parallel straight side edges, two elongated guide members each having a rectangular slot adapted to slidingly receive the edge of the slide plate, each elongated guide member including a lowerpart and an upper part and means for securing them together, the lower part having means for attachment to the base plate, said rectangular slot having (1) a first side wall adjacent to and parallel with the base plate, said first side wall being definedby a surface of said lower part,(2) a second side wall defined by a surface of said upper part, and (3) a bottom wall defined by a surface of one of said upper and lower parts, the upper and lower parts having oblique mating surfaces such thatlongitudinal meovement of one part with respect to the other causes the parts to separate from or approach each other in a manner to change the width of said slot, and second mounting means establishing a connection between the slide plate and the other part of said assembly.

有一长条形底座与身边的边缘,一个线性驱动器装配有两个部分,可以离开,彼此之间,首批意味着在说底座、说安装方式支持之一说总成,一个矩形截面板、平行直边棱、两种细长的引导会员都有一个矩形槽适应slidingly收到边缘的细长板,每一个lowerpart引导会员包括一个上方和手段,确保他们在一起,下方附件的方式,在底座,说矩形槽有(1)第一次侧墙毗邻,平行底座,一边说:definedby墙表面说下方,(2)第二次侧墙表面的定义,并说上方(3)底壁由一个表面的上部和下部零件,说上部和下部阀部件表面的thatlongitudinal拥有斜meovement这样的一部分的原因部分可以分离或接近对方的方式来改变宽度的槽,第二次安装方式,建立连接板之间,另一部分说总成。

The objectives of this paper were to investigate the simulation and design of continuous multiple-station rolling forming process for a U-Section Steel Bar by CAE software-DEFORMTM Due to the limitation of elements number using a short strip 120mm went through all the stations to simulate the real continuous rolling forming on factory The roller gap was fixed as 0 30mm roll speed was 20 rad/sec and progressive angles were all equal for each rolling process which were the formed angle divided by by the number of station Three rolling processes were selected with 6 9 and 12 stations respectively During simulation processes two cases occurred Case A the strip was through a single station Case B the strip across two stations Because the strip laterals side was stretched and twisted during the process The model of case B closer to the practical process than case A and the calculated stress and strain on the tip of U section for case A were lower than these for case B by up to 15% From the result of case B for each process the stress for 12-station process was smallest 9-station process second and 6-station process next Because less-station can save larger cost and forming time but the bigger stress and strain for 6-station caused wrinkles on lateral sides not found on 9-station and 12-station Therefore 9-station process was a more suitable design than 12-station process smaller stretched and twisted and stress The progressive angles for 12-station was 7 5?

本文主要是以DEFORMTM有限元素软体模拟U型钢片连续道次成型与单一道次成型以确认单一道次模拟的是否可取代连续道次模拟之研究。因DEFORMTM 软体对於网格元素上的限制故使用较短素材120mm通过所有的成型站以模拟工厂实际连续成形方法。辊轮间隙固定为0 3mm;辊轮转速为20 rad/sec;弯曲角度的方法为将成型角度平均除以成型站数。有三种辊轮成型方式被选择分别为6站,9站,与12站。在模拟的过程中有两种现象会产生 Case A,素材通过单一成型站。Case B,素材会通过两个成型站。因为在模拟过程中素材的两端会有拉应力与扭力。Case B的模拟比Case A像实际的制程,并计算应力与应变在U型断面的Tip部中可发现Case A比Case B低约15%。从Case B的每站的结果可以得知,12站的成型应力最小,9站次之,6站最后。

Basement, equipment room, garage drainage wash the ground, where two and two or more drainage pump equipment when not pumping.

地下室、设备机房、车库冲洗地面的排水,如有两台及两台以上排水泵时可不设备用泵。

Basement, equipment room, garage, wash the soil drainage, if two and two or more drainage pump device pumps may from time to time.

地下室、设备机房、车库冲洗地面的排水,如有两台及两台以上排水泵时可不设备用泵。

There are 4 duplexes in this development, two of them are front facing and two are back facing with french balconies, the back is a pool view.

有4双连屋,在这方面的发展,其中有两个是前线面临的两个回面对法语露台,后面是一个池景。

Turn the deck face-down. Slip-cut the top jack into the deck and get a break above it as you place the rest of the deck on it. Execute a riffle-force so you can force the spectator the jack. Ask them to hold on to the jack and as they're doing that, flip the bottom card over do a half-pass with the bottom half of the deck.

这时把观众手中的那张Jack拿过来任意插在下半段面向上的牌里(译者注释:这样就已经有两张Jack于下半段牌面相反了)现在用大拇指break最上面的那张Jack,用double-undercut(两段式切牌+将顶牌移至牌底)把刚才break的那张Jack切到最下面,注意在这个两段式切牌中,第一次切处必须在上半段牌中,这样可以保证观众以为所有的牌至今还都是面全朝下的,第二次切,就是把剩余的那上半段(除去你要移至底部的那张Jack)再切上去。

更多网络解释与有两面的相关的网络解释 [注:此内容来源于网络,仅供参考]

chore task:家务杂事

bilateral two-sided, mutual adj.有两面的, 双边的 | chore task, job, duty, unpleasant task n.家务杂事 | clamp fasten, fix, secure n.夹子, 夹具, 夹钳 vt.夹住, 夹紧

dihedral:有两平面的

digynian 二雌蕊的 | dihedral 有两平面的 | dihybrid 双因子杂种的

literary:字面的

它的形成至少有两种方法.第一种就如你的例子, "Nurses are patient people." patient 既当作形容词作"有耐心的"意思(护士是有耐心的人),又当作名词"病人"解(护士是是照顾病人的人).另一种是将字词字面的(literary)意思,用来做为..

Majordomo Executus:管理者埃克索图斯

管理者埃克索图斯(Majordomo Executus)目前成熟的Majordomo战法有两种,我们两种都尝试过,也都成功过. 一种是:1-4-3,也就是1个Elite,然后4 Priest,最后3 Elite,这样的好处是场面容易控制,不过最后那个战士后面的Healer很累,如果装备不足,

bicylindrical:有两个筒面的

bicylindrical resonator | 双圆柱共振器 | bicylindrical | 有两个筒面的 | bid adieu to | 向告别

bifacial:有两面的

biestings 母牛初乳 | bifacial 有两面的 | bifer 开花两次的

bifacial tension:双界面张力

bifacial leaf | 异面叶 | bifacial tension | 双界面张力 | bifacial | 有两面的

bifront:有两个锋面的

bifrons | 背靠背的两人半身雕塑像 | bifront | 有两个锋面的 | Bifrost | 连接天地的彩虹桥

dicephalous:有两个头的

有两个平面的dihedral | 有两个头的dicephalous | 有两个雄蕊的diandrous

biestings:母牛初乳

bierkeller 德国式小酒店 | biestings 母牛初乳 | bifacial 有两面的