拆除
- 基本解释 (translations)
- dismounting · backout
- 词组短语
- tear down · knock sth down · knocking-out
- 更多网络例句与拆除相关的网络例句 [注:此内容来源于网络,仅供参考]
-
In case a non-property owner adds appurtenance to the property of any other person that he uses, and if the property owner agrees to such adding and has stipulations on how to deal with the appurtenance, the stipulations shall be followed; if there is no stipulations and they cannot make an agreement through negotiation, the property owner may order to dismantle it if it can be dismantled; if it cannot be dismantled, it may be returned to the property owner after being converted into money; if it results in any loss of the property owner, the non-property owner shall undertake compensation liabilities.
非产权人在使用他人的财产上增添附属物,财产所有人同意增添,并就财产返还时附属物如何处理有约定的,按约定办理;没有约定又协商不成,能够拆除的,可以责令拆除;不能拆除的,也可以折价归财产所有人;造成财产所有人损失的,应当负赔偿责任。
-
The application and the problems of expert system and neural network in blasting field has been discussed in this paper .
本文首先讨论了专家系统和人工神经网络在拆除爆破领域中的应用以及存在的问题,探讨了将专家系统和人工神经网络结合起来开发功能更为强大的混合拆除爆破专家系统的必要性和可能性。
-
Remove clevis pin and cotter pin on the rod coupling, then remove upper rod.
拆除连接套上的销轴和开口销,然后拆除上阀杆。
-
B if STORER shall not agree to share such agreed costs, AAA may remove all or other part of such works, as the case may be, in which event AAA shall as soon as practicable or within such longer period as AAA may demonstrate to STORER's reasonable satisfaction is required by AAA to effect such removal, remove all or other part of such works, as the case may be, at its own expense without causing damage or deterioration of the Dedicated Facilities and shall restore the Dedicated Facilities to their state and condition immediately preceding such works or AAA may with STORER's consent leave all or part of such works intact, in which event such works shall at the expiry or termination of this Agreement become the property of STORER without claim or charge by AAA.
若仓储方拒绝分摊此商定费用,A公司可视情况而定,拆除全部或部分相关工程;在此情况下, A公司应视情况而定,在最短期间或较长期限内( A公司须证明并获仓储方认可,需要较长时间进行拆除工作),拆除全部或部分相关工程,且自付一切费用,亦不损坏专用设施或降低其性能,并恢复专用设施到拆除前的状态。或A公司经仓储方同意,将前述全部或部分工程保留原状;在此情况下,在本合约终止时,此类工程即成为仓储方的财产, A公司不得索赔或收费。
-
Project construction units for the inspection of buildings, including the availability of content not permit unauthorized access to the buildings housing residents; Housing demolition permits to determine whether failure to implement the scope of demolition and removal of unauthorized extension of the deadline for removal; availability of a unit does not have minimum qualifications of demolition, the commission does not have to dismantle intelligence unit of the dismantling works; whether the project should be required to take the tender bidding method to determine minimum, assessment, demolition unit; without due process by arbitrarily removed or relocated houses barbaric acts and cut off water pollution, power, forcing the relocation of residents who conduct; whether strict compliance with the minimum compensation settlement agreement, or delay in payment of compensation or removal Late placement; is also closed for demolition procedures.
针对拆迁项目建设单位的检查内容包括有无未取得房屋拆迁许可证擅自实施拆迁情况;有无未按房屋拆迁许可证确定的拆迁范围实施拆迁和擅自延长拆迁期限的情况;有无委托不具有拆迁资格的单位实施拆迁,委托不具有拆除资质的单位实施拆除工程的情况;应招标的工程是否按规定采取招投标方式确定拆迁、评估、拆除单位;有无未经法定程序擅自拆除被拆迁人房屋的野蛮拆迁行为及断水、断电。。。。。。
-
At this time, loosen the connection screw of standard section with spanner, hang the shaft of hand crane on the upper angle bar, sway the shaft of hand crane upward, separate this standard section from the next section, and lay it in the suspension coop, dismantle the other standard section for the same method, and turn the shaft to another direction, draw the lifting wire rope tightly, the operation staff leave the suspension coop, open the lock stopping instrument, fall the suspension coop to next position and lock the brake instrument, the operation staff return to the top of suspension coop, continually dismantle note: forbid the staff leave on the top of suspension coop or in the coop when the suspension coop is running
8.1折除时,首先将吊笼用停层装置停靠在待拆除的标准节的下两节上,操作人员上到吊笼顶,卷扬机松绳,用小吊杆将顶梁略向上提起,拔出顶梁横销,使顶梁值得徐徐降下,降到拆除节下一节中间框架角处,并重新穿上横销,这时用板手将标准节连接螺栓松开,将手摇起重机小吊杆钩挂在待拆节上框架用钢土,到吊笼内,用同样的方法拆下另一节标准节,然后将吊杆转向不影响升降机运行的方向,收紧起升钢丝绳,操作人员离开吊笼,打开锁止机构,使吊笼下降到下一个拆除位置,并将锁止机构锁死,人员重返笼顶,进行下一拆除循环注意:在吊笼运行时绝不允许有人员留在吊笼顶部或吊笼内
-
When dismantle the machine, firstly, stop the suspension coop on the lower 2 sections of the standard sections, the operation staff go on the suspension coop top, the hoisting machine loosen rope, lift the pillar with small shaft, pull out the horizontal pin of pillar, let the pillar fall slowly to thedismantled section's middle angle bar, insert the horizontal pin again. At this time, loosen the connection screw of standard section with spanner, hang the shaft of hand crane on the upper angle bar, sway the shaft of hand crane upward, separate this standard section from the next section, and lay itin the suspension coop, dismantle the other standard section for the same method, and turn the shaft to another direction, draw the lifting wire rope tightly, the operation staff leave the suspension coop, open the lock stopping instrument, fall the suspension coop to next position and lock the brakeinstrument, the operation staff return to the top of suspension coop, continually dismantle note: forbid the staff leave on the top of suspension coop or in the coop when the suspension coop is running
8.1折除时,首先将吊笼用停层装置停靠在待拆除的标准节的下两节上,操作人员上到吊笼顶,卷扬机松绳,用小吊杆将顶梁略向上提起,拔出顶梁横销,使顶梁值得徐徐降下,降到拆除节下一节中间框架角处,并重新穿上横销,这时用板手将标准节连接螺栓松开,将手摇起重机小吊杆钩挂在待拆节上框架用钢土,到吊笼内,用同样的方法拆下另一节标准节,然后将吊杆转向不影响升降机运行的方向,收紧起升钢丝绳,操作人员离开吊笼,打开锁止机构,使吊笼下降到下一个拆除位置,并将锁止机构锁死,人员重返笼顶,进行下一拆除循环(注意:在吊笼运行时绝不允许有人员留在吊笼顶部或吊笼内
-
Besides the rest position of tongue, all swallowing ultrasonographic measurements were recovered immediately after removal of TPA. The rest position was recovered in 7 days after removal of 2mm TPA and recovered in 1 day after removal of 4mm TPA.
拆除横腭弧线后,吞咽运动之超音波测量数值会立即回复,但是舌头的休息位置则会在拆除2mm横腭弧线后之第7天会回复;以及拆除4mm横腭弧线后之第1天会回复。
-
We are a professional drilling company in Beijing, the main business of professional dismantling, specialized drilling, engineering, demolition, Beijing housing demolition, removal of the stairs Beijing, Beijing, on the ground cutting demolition, removal of the balcony Beijing, Beijing, cement, construction demolition, removal of floor tiles Beijing, Beijing, demolition concrete.
我们是北京一家专业打孔公司,主要业务有专业拆除、专业打孔、工程拆除、北京房屋拆除、北京楼梯拆除、北京地面切割拆除,北京阳台拆除,北京水泥建筑拆除,北京地砖拆除,北京拆除混凝土。
-
Sure enough, by the end of the year, Xicheng District, Beijing Land Resources and Housing Bureau of Land Management posted the demolition notice, notice states that the demolition scope什刹海region manado 1,9,11,14,17 Hutong No. abuse homes, small stone tablet on the 1st, the demolition period is one month, the demolition business unit is the centuries-Chen Real Estate Development Company Limited.
果然,到今年年底,北京市西城区土地资源和房屋土地管理局发布的拆迁通知,通知指出,拆除范围什刹海地区胡同美娜多1,9,11,14,17第滥用家园,小石碑上的第一,拆除期间的一个月,拆除商业单位是百年陈房地产开发有限公司。
- 更多网络解释与拆除相关的网络解释 [注:此内容来源于网络,仅供参考]
-
demolish admonish:拆毁, 拆除(建筑物等
desperado n.暴徒, (尤指早期美国西部的)亡命之徒 | demolish admonish 拆毁, 拆除(建筑物等 | public utilities 公用事业 公共设施
-
arch bridge:拆除
网桥:Bridge | 拆除:arch bridge | 板桥:slab bridge
-
DEM Demolished:拆除
DE Subcommittee on Ship Design and Equipment (IMO) 船只设计和设备小组委员会 | DEM Demolished 拆除 | DEM Demurrage 滞留
-
demolish:拆除
最后到了令人发指的终极技能了,那就是恐怖的机械地精(Robo-Goblin热键B),耗魔25,冷却时间1秒,持续时间"不受限制",将地精修补匠转变为机械形态,对大多数魔法免疫(除了先知的地震);增加力量和护甲;拥有被动技能拆除(Demolish),对建筑物伤害增加
-
demolish verb:破坏, 拆除
demography noun. 人口统计, 人口学 | demolish verb. 破坏, 拆除 | demolition noun. 破坏, 毁坏
-
demolishment:拆除
demolishingandrebuilding原拆原建 | demolishment拆除 | demolition拆毁
-
demolishment:拆除,破坏
Demolish 拆毁,破坏 | Demolishment 拆除,破坏 | Demonstrate 说明,表示
-
defused a powerful bomb:拆除一个威力强大的炸弹
尚未引爆的炸弹unexploded bombs | 拆除一个威力强大的炸弹defused a powerful bomb | 拆除炸弹disarm a bomb
-
Blasting Demolishing Building:爆破拆除
台阶爆破:bench blasting | 爆破拆除:Blasting Demolishing Building | 拆除爆破:Demolition blasting
-
disassembling:拆除
574 差转电台 RADIO REPEATING SET | 575 拆除 Disassembling | 576 拆除爆破 Blasting for demolition