建筑物
- 基本解释 (translations)
- building · buildings · construction · erection · fabric · structure · structures · superstructure · bldg. · constructions
- 更多网络例句与建筑物相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The incorporated model is evaluated by simulation results of two different building aerodynamical scheme in southeast region of Beijing area, which are building drag scheme and aerodynamical urban canopy scheme. The conclusions are drawn by the comparisons between the simulation results of the wind speed and the observations of the automatic weather stations in the urban areas: the simulated results of incorporated model are more in reasonable agreement with the observations than that of building drag scheme, and the diurnal trend of that is more agreement with observations.
采用建筑物拖曳法和建筑物动力冠层方案两种不同建筑物动力学处理方法对北京地区东南部进行模拟,通过城市地区水平风速的模拟结果与自动气象站实测资料对比发现模拟结果与实测相当吻合,建筑物动力冠层方案的引入能够更好地实施对城市地区的水平风速分布的数值模拟。
-
The model incorporated with the aerodynamical urban canopy scheme is better to simulate the wind field on the urban areas.The conclusions are drawn by the comparisons between the simulation results of the building drag scheme and the aerodynamical urban canopy scheme in a real town: the simulated wind speed with the aerodynamical canopy scheme on the town areas is always lower than that on the surrounding rural areas, but that with the other scheme is not so.
分别采用建筑物拖曳法与建筑物动力冠层方案对一个实际小规模城市进行模拟试验,分析表明引入建筑物动力冠层方案可以模拟出小规模城市地区水平风速偏低的现象;还可以模拟出城市地区建筑物动力作用对湍流活动的影响;对湍流动能模拟结果表明比较符合实际分布情形。
-
In this paper, model experiment research was carried, of which was based upon the forced settlement and rectification measure of some buildings on self-weight collapse loess area. At the same time, some conclusions are drawn: 1 the relationship between the soil stress deliquesce and quantity of slope, quantity of settlement of buildings and stress variety of soil body; 2 the relationship between the superimposed stress and quantity of slope, quantity of settlement of buildings and stress variety of soil body; 3 the relationship between quantity of slope, quantity of settlement of buildings and water injection quantity in hole; 4 the relationship between quantity of slope, quantity of settlement of buildings and diameter and interval of hole; 5 the relationship between stress variety of soil body and water injection quantity in hole and interval of hole.
本论文针对地处自重湿陷性黄土地区的建筑物和构筑物的迫降纠倾进行了模型试验研究,给出了自重湿陷性黄土地区建筑物迫降纠倾时1地基应力解除、附加应力与建筑物倾斜量、沉降量及土体应力变化的关系;2附加应力与建筑物倾斜量、沉降量及土体应力变化的关系;3建筑物倾斜量、沉降量与孔内注水量的关系;4建筑物倾斜量、沉降量与孔径和孔间距的关系;5土体应力变化与孔内注水量、孔直径的关系。
-
Sedimentation anyslys of soil under the action of deadweight; 2 Sedimentation anyslys of structure in using; 3 Endogen force anyslys of structure in using; 4 Soil remolding type anyslys; 5 Homogenous flush works anyslys; 6 Anyslys of the structure sedimentation effects of different flushing amount at the same place; 7 Anyslys of the structure sedimentation effects of different flushing places; 8 Anyslys of the structure sedimentation effects of different horizontal flushing places; 9 Anyslys of the structure sedimentation effects of different vertical flushing places; Getting the different between the endogen force of common structure and that of slant structure.
对掏土纠偏过程做了以下9个方面的分析:1、土体在自重作用下的沉降分析; 2、建筑物在使用阶段的沉降分析; 3、建筑物在使用阶段的内力分析; 4、土体受扰动类型分析; 5、均匀冲水施工过程分析; 6、同一个地方冲水量大小不同对建筑物沉降影响分析; 7、不同沉井冲水对建筑物沉降影响分析; 8、进深不同的土层冲水对建筑物沉降影响分析; 9、不同埋深土体冲水对建筑物沉降影响分析。
-
This research is based on the argument of the German philosopher Martin Heidegger's Dasein, temporality and everydayness, and Being-in-the-world which regards the building as the feature and justification of human existence. In the discussion of the preservation and rehabilitation of historical building in Taiwan, the exploration and application of Heidegger's theory helps to establish the foothold of existential of humanbeing in the building, and to sustain its historical significance in the modern society.
德国哲学家马丁海德格对存有日常生活中的时间性与在世界中存有的空间性的分析结构中,将建筑物视为人类存在的现象表徵,使得人类的存有获得解释,应用在台湾历史性建筑物保存与再利用的议题上,对建筑物在时间与空间上的探索人类在建筑物中的存在立足点,并了解到建筑物在现代社会中所肩负延续历史性的意义。
-
By studying,we could know structural response of building to blasting seismic wave is not only relative to intensity of blasting vibration, but also to seismic frequency and characteristic of buliding and groundsill,so we should treat in different ways in practise because of difference made by blasting seismic wave to different structural types.
最后围绕爆破地震波的三要素通过建立理想的建筑模型对建筑物的结构响应进行了理论分析,通过分析得出,建筑物对爆破地震波的响应除了与震动强度有密切关系外,还与地震波频率、建筑物的尺寸、地基土的特性以及结构的累积损伤等有很大关系,而且对于不同类型的建筑物,其结构响应差异还较大,因此在工程施工中需要分别对待。
-
First chapter is the summary, mainly introduced the project basic survey; Second chapter for the dam site hydrology characteristic, introduced the Hubei -01 key project in the basin specially is nearby the dam site hydrometeorology survey; Third chapter for the key position and the storehouse district terrain geology condition, introduced explained the dam site specially is nearby the dam spool thread terrain geology condition; Fourth chapter for the key position building shaping and the hydrology computation, including determined key position the project rank, the building shaping, adjusts Hong to calculate, blows off the bottom hole cross section size drawing up with initially to draw up the key position scheme of arrangement; Fifth chapter draws up for the size with the dam body arrangement, including the shaping, the Liang section plane determination, the dam body dam base guards against infiltrates the draining water facility the arrangement and the dam body plane arrangement and the stress stable analysis computation; Sixth chapter for the flood discharge design, mainly is the top of dam detailing and the downriver disappears can design; Seventh chapter for blows off the building the design, mainly is to imports the building the detailing strobe arrangement and Kong Shen and the exportation disappears can the design; Eighth chapter pilots the system and the power plant workshop design for the power plant, mainly is directs the system and the power plant workshop design to the power plant; Ninth chapter is ground processing, including ground excavating, the cleaning up, solidifies the grouting, the curtain is in the milk and all that some processing measure.
第一章为综述,主要介绍了工程的基本概况;第二章为坝址水文特性,介绍了鄂-01枢纽工程所在流域特别是坝址附近的水文气象概况;第三章为枢纽及库区地形地质条件,介绍说明了坝址特别是坝轴线附近的地形地质条件;第四章为枢纽建筑物的选型及水文计算,包括确定枢纽的工程等级,建筑物选型,调洪演算,放空底孔断面尺寸的拟定和初步拟定枢纽布置方案;第五章为拱坝尺寸拟定和坝体布置,包括拱坝的选型、拱冠梁剖面的确定、坝体坝基防渗排水设施的布置及坝体的平面布置和应力稳定分析计算;第六章为泄洪的设计,主要是坝顶的细部设计和下游消能设计;第七章为放空建筑物的设计,主要是对进口建筑物的细部设计闸门布置及孔身和出口消能的设计;第八章为电站引水系统及电站厂房设计,主要是对电站引系统和电站厂房的设计;第九章为地基处理,包括地基的开挖,清理,固结灌浆,帷幕灌浆以及其他一些处理措施。
-
Retaining the main buildings, including a variety of dams, levees and seawall; Sluicing buildings, including a variety of overflow dam, spillway, sluiceway tunnel, flood diversion gates; influent building, also known as the water intake structures, such as the intake gate, deep-intake and pump station; Water buildings, If primer water tunnel, channels and aqueduct; drainage structures, such as the groin, Shun dam, revetments, diversion dike.
保留的主要建筑物,其中包括各种各样的大坝,堤防和海堤;泄水建筑物,其中包括各种各样的溢流大坝,溢洪道,泄洪洞隧道,分洪闸;进水建筑物,也被称为取水口结构,如进水口闸门,深摄入和泵站;水建筑物,如引水隧道,渠道和渡槽;排水结构,如腹股沟,顺坝, revetments ,导流堤。
-
The sources and characters of thoron 220 Rn in the buildings, the pattern of indoor thoron 220 Rn's concentration and the assessment of hazard which it brings to human being are discussed,and the method of measurement of indoor thoron's concentration is expounded and the measure for reducing thoron 220 Rn in the buildings is also pointed out.
综述了建筑物内钍射气220 Rn 的来源和性质,讨论了建筑物内220 Rn 浓度的模型及其对人类的危害风险评估,探讨了建筑物内220 Rn 浓度的测量方法,提出了降低建筑物内220 Rn 浓度的措施。
-
This paper analyzes theory of deformation monitoring, then puts forward several problems that will be studied, which include four parts:(1) Adjustment of Free Network TheoryI study some problems about inner adjustment constraint, which include mathematical meaning, geodetical meaning ,and so on.
在工程建筑物的兴建中,从工程施工开始到竣工,以及建成后整个工程的运营期间都要不断的对工程建筑物进行监测,以便掌握工程建筑物形变的情况,及时发现问题,保证工程建筑物的安全。本文首先介绍形变监测的概况,并分析大坝形变监测的研究情况。
- 更多网络解释与建筑物相关的网络解释 [注:此内容来源于网络,仅供参考]
-
building contractor's yard:建筑物承包商院子
building construction 建筑物建筑 | building contractor's yard 建筑物承包商院子 | building control station technology 建筑控制站技术
-
building lease:建筑物租约
建筑物入口 building entrance | 建筑物租约 building lease | 建筑现场 construction
-
building:建筑物
条代替)"建筑物"(building)包括任何住用或公共建筑物、拱形结构、桥梁、改建或建造作贮存油类及石油产品用的洞穴、烟、厨房、牛棚、船坞、工厂、车房、飞机库、围板、厕所、茅棚、办公室、贮油装置、外屋、码头、遮蔽处、店铺、马厩、楼梯、墙壁、仓库、货运码头、工场或塔楼、塔架或其他用以支撑架空缆车的相似构
-
building envelope:建筑物外壳
building design 建筑物设计;建筑设计 | building envelope 建筑物外壳 | building for special purpose 特别用途建筑物
-
buildings:建筑物
"占用"(occupied)就任何土地或建筑物或土地连建筑物而言,指该土地或建筑物或土地连建筑物正被人作实益使用;(由1975年第76号第6条代替)"建筑物"(buildings)包括建筑物的任何部分,但就第5(2)条而言,则不包括在内.
-
dangerous building:危险建筑物
(由1959年第44号第2条增补)"自动梯"(escalator) 具有>(第327章)第2条给予该词的涵义; (由1987年第43号第44条增补)"危险建筑物"(dangerous building) 指任何建筑物,而其所处状况会导致其占用人或使用人、或任何邻近建筑物的占用人或使用人、或公众遭受损伤的危
-
defective building:欠妥的建筑物(有缺陷的建筑物)
defective 欠妥 | defective building 欠妥的建筑物(有缺陷的建筑物) | deflection 挠度;偏差度;偏斜;弯沉;偏转;变位
-
existing building:现有建筑物
而该份数的拥有人,就他本身与该地段的其他不分割份数的拥有人之间而言,有权根据某份在土地注册处注册的文书的条款,独有管有该建筑物内的处所;"现有建筑物"(existing building) 指在某地段或分段上的任何建筑物,
-
firetrap:无太平门的建筑物/易失火的建筑物
firestone /燧石/耐火石/ | firetrap /无太平门的建筑物/易失火的建筑物/ | firewall /火墙/绝热板/
-
Erection of minor architectural superstructures:小型建筑物兴建
529300 建筑物结构更改及加建工程 Structural alteration and additi... | 5294 小型建筑物兴建 Erection of minor architectural superstructures | 529400 小型建筑物兴建 Erection of minor architectural super-s...