英语人>词典>汉英 : 工作完毕后 的英文翻译,例句
工作完毕后 的英文翻译、例句

工作完毕后

词组短语
after hours
更多网络例句与工作完毕后相关的网络例句 [注:此内容来源于网络,仅供参考]

The basis of construction completed, the walls of the warehouse line of work release, the work unit must be responsible for the total package, with a total package units actinomycosis, the need to go through the building of units and supervision units of Actinomyces review the accuracy of the location.

基础施工完毕,是仓壁的放线工作,该工作必须由总包单位负责,总包单位放线后,需要经过建设单位和监理单位对放线位置的准确性进行复核。

Upon acceptance of payment, refers checks and payment to the cashier for closing. Returns the copy of the closed check, credit card slip or change to the guests, as appropriate;?Sets up tables for each course according to the outlet standards. During the meal, after each course, removes dirty dishes and silverware from table and changes ashtray upon needs. After the meal, cleans and resets the table;?During lower occupancy of the outlet, assists with stocking the workstations, polishing silverware from table and folding napkins;?Keeps abreast of the food and beverage promotions, new menu items, daily specials, and other relevant information for the outlet guests

在客人用餐完毕离开后,清理餐台并重新摆台;在餐厅入座率不高时,需协助整理工作台和擦拭餐台上刀叉等餐具并准备口布花;及时获取餐饮推广活动,新菜单,每日特别推荐的相关信息;职位要求:女性年龄18-23岁之间职高以上学历;2年以上五星级国际酒店餐厅服务员工作经验;具备基本的餐饮知识,了解食物配料,烹调方式以及基本服务技巧;具备良好的客户服务导向意识;具备良好的沟通以及人际交往技巧可根据工作需要,灵活安排不同的工作班次;Responsibility

Push the hydraulic pilot valve's handle to Stop, and adjust the pressure regulating hand wheel to 0. After everything is done, then start the diesel engine, wait until it runs normally, then adjusts the pressure regulating hand wheel to start the drill.

将液压操纵阀的手把置于"停止"位置上,并调整调压手轮使其至"0"压位置,上述工作进行完毕后,即可开启柴油机,待其运转正常后,再调整压手轮即可开动钻机进行工作。

More common in the humid and frequent contact with the water, that is often humid environment, as well as the work of dealing with water, in this part of the work completed immediately after dry towel dry the body and replaced by drying clothes; out sudden rain, all wet clothing, dry towel should be immediately wiped away the body rub to the skin after flushing fever, and then replaced by warm water wash drying clothes, the clothes not just take off the wet, immediately wash with hot water that the invasion force in alpine wetland in the summer after the sweat labor hill, also not immediately rinse with cold water into the pond or swimming, because porokeratosis closure, resulting in cold dampness of the air invasion.

受潮湿多见于与水接触过频的人,即经常在潮湿环境中工作以及与水打交道的工作人员,这部分人员在工作完毕之后,应立即用干毛巾擦干身体,换上干燥衣服;外出突遭雨淋,衣衫尽湿者,应立即用干毛巾擦干身体,擦至皮肤潮红发热之后,再用温水洗净换上干燥衣服,切勿潮湿之衣服刚脱下,马上用热水洗澡,以致迫寒湿入侵体内;在夏季劳动后大汗淋漓,亦不可马上用冷水冲洗或入池游泳,因为汗孔未闭,易使寒湿之气入侵。

When there is not enough memory in generation 0 to accommodate new objects, CLR triggers garbage collector starts to collect objects no longer needed from generation 0. When the collecting action in generation 0 finishs, garbage collector tamps the objects not collected in generation 0 to lower address, and moves the pointer to start address of free memory(and updates the related references according to the shifted address of objects).

当第0代内存不足以容纳新的对象时,就触发垃圾收集器工作,来回收第0代中不再需要的对象,当回收完毕,垃圾收集器就夯实第0代中没有回收的对象至低的地址,同时移动指针至空闲空间的开始地址(同时按照移动后的地址去更新那些相关引用),此时第0代就空了,因为那些在第0代中没有回收的对象都移到了第1代。

Job as follows shall be finished next week:(1) Get right and left side of upper water wall positioned and reinforced;(2) Finish Pre-store nine downcomers;(3) All the wall are positioned and reinforced, and then install right and left side rigid beam;(4) Finish front wall counterpart welding;(5) Hoisting two rare roofs, Middle-temperature RH, four high temperature RH headers, hoist headers of middle-temperature RH and high-temperature RH, it can't install lifting rod.

下周,锅炉以下工作需要完成:(1)上水左右侧找正完,且加固完;(2)下降管9根预存完;(3)包墙全部找正完,加固完,之后安装左右侧刚性梁;(4)前包墙对口焊接完毕;(5)后顶棚吊装2片、中温再热器、高温再热器集箱4个,吊挂中再和高再集箱时,不能安装吊杆。6)2台汽动前置泵找平找正,并验收;(7)电动给水泵组,耦合器和电泵就位;(8)启动锅炉房内设备找平找正,并验收;(9)3台复用水泵就位;(10)综合水泵房内设备找平找正,并验收。

To cooperate with new and old parts: although standard zero, components, but in between interchangeable in assembly parts, and to make the optimal coordination between trim, still needs a lot of work, such as the gear and rack, boring if after removal of gear various performance indicators are used by detecting without the need to change, and to replace worn rack, rack and rack positioning pin hole on installation bolt holes and should be first, reoccupy hand crossed positioning drills and tapered reamer to match the drill and match hinge, and after the installation of new and old super-modulus gear mesh clearance to achieve technical standards, this work takes about one day.

。新,旧零部件重新配合过程:尽管标准零,部件间具有互换性,但在装配中,要使新旧零部件间的配合达到最佳状态,仍需大量的修整工作,如镗床的齿轮与齿条,若拆卸后齿轮的各项性能指标经检测尚能使用不需更换,而齿条磨损严重需更换,那么齿条及齿条安装面上的定位销孔和定位螺钉孔就需先划线定位,再用手电钻及锥形铰刀重新配钻和配铰,且新齿条安装完毕后与旧齿轮的啮合间隙需达到技术要求的标准,此项工作需时约一天。

To cooperate with new and old parts: although standard zero, components, but in between interchangeable in assembly parts, and to make the optimal coordination between trim, still needs a lot of work, such as the gear and rack, boring if after removal of gear various performance indicators are used by detecting without the need to change, and to replace worn rack, rack and rack positioning pin hole on installation bolt holes and should be first, reoccupy hand crossed positioning drills and tapered reamer to match the drill and match hinge, and after the installation of new and old super-modulus gear mesh clearance to achieve technical standards, this work takes about one day.

。新,旧零部件重新配合过程:尽管标准零,部件间具有互换性,但在装配中,要使新旧零部件间旳配合达到最佳状态,仍需大量旳修整工作,如镗床旳齿轮与齿条,若拆卸后齿轮旳各项性能指标经检测尚能使用不需更换,而齿条磨损厉害需更换,那么齿条嘉逸条安装面上旳定位销孔和定位螺钉孔就需先划线定位,再用手电钻及锥形铰刀重新配钻和配铰,且新齿条安装完毕后与旧齿轮旳啮合间隙需达到技术要求旳标准,此项工作需时约─天。

After a day of work, you can clean the surface of the furnace and outgoing power with wet towel containing corrosive cleaner. You are not allowed to rinse it with water directly, or you will cause unwanted damage to electrical properties of the device.

每天工作完毕后可用为含腐蚀性清洁剂的湿毛巾,清洁炉体表面及电源引出线表面,严禁用水直接冲洗,一面破坏电气性能。

Lifting the company as a result of non-lifting experience of similar models, the need for carefully lifting program to explore and experiment, with the result that the project had of hoisting the delay is better than the original plan. May 17, in the lifting process of lifting equipment as a result of failure, leading to the surface of leaves and fairing minor injury, and the remaining components of injury does not appear, at present the company in accordance with the guidance of manufacturers fairing on the surface of leaves and damage has been repaired, to ensure that follow-up after repair will not affect the work of lifting and running power.

由于吊装公司无同类机型的吊装经验,需对吊装方案进行谨慎探索和试验,致使项目吊装较原计划有所延迟。5月17日,在吊装过程中由于吊装设备出现故障,导致叶片和整流罩表层出现轻微损伤,其余部件未出现损伤,目前公司按照生产厂商的指导对叶片和整流罩表层的损伤已修复完毕,以确保修复后不会影响后续吊装及运转发电工作。

更多网络解释与工作完毕后相关的网络解释 [注:此内容来源于网络,仅供参考]

Boot sector:启动区

二、若不是上述情形,则请找一张系统磁片来开机,开机完毕后,切换到硬碟(C:\),然后在硬碟中进行一般工作试试看(如开启档案,程式等),若操作正常,则表示硬碟没有损坏,但硬碟的开机启动区(Boot Sector)可能已经损坏,这可能是病毒造成,

keel laying:龙骨铺放

去年8月通过龙骨铺放(keel laying)开工建造的10个月以后建造完毕,命名仪式结束后,将在27日交付给船主. 大韩造船总经理金说:"建造期间没有出现任何差错,顺利地完成工作,所以本次交付有很大意义. 将来以安全作业环境为基础,致力于工期缩短,