- 更多网络例句与完成了相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Of the major soybean provinces, the government reported that Buenos Aires was 55 percent planted (33 percent last year), Santa Fe was 63 percent planted (49 percent last year) and Cordoba was 69 percent planted (70 percent last year).
政府报告说,在大豆主产省份中,布宜诺斯艾利斯完成了55%(去年为33%),圣菲省完成了63%(去年为49%),科尔多瓦省完成了69%(去年为70%)。
-
The temperature control system of reflective plane mirror is researched and completed. It is the first time to complete the close loop correction experiment of reflective plane mirror thermal distortion by means of adaptive optics in our country.
设计完成了平面反射镜温度变形的自适应光学闭环校正实验系统,研制完成了平面反射镜温度变形的可控加温系统,在国内首次完成了平面反射镜温度变形的自适应光学闭环校正实验。
-
I'm not getting it and I look around and this lady is behind me with her clipboard taking notes, and I tried to get a response trying to be nice:"I almost got it, I almost got it," and she basically just looks down and snarls and walks off.
我没完成,并往四处看了看,发现这个女士正在我后面,往她的记录本上做笔记。我试图得到一点鼓励,说:"我几乎完成了,我几乎完成了。"但她只是看着本子,怒骂了几句,走了。
-
Six cars started here last year and all six finished (equalling the 1961 Dutch Grand Prix when all starters made it home); whereas this time only nine cars finished out of the 22 that started.
六辆赛车去年在这里开始,所有都完成了比赛(相当于1961年的荷兰大奖赛,当时所有的参赛车辆都完成了比赛)。然而这次开始比赛的22辆赛车之中只有九辆赛车完成了比赛。
-
The province's 65 counties completed the second national land survey data verification work in rural areas, accounting for 74% of the province the amount of verification; completed the three-dimensional system of Zhangye City Land Reserve building and zoning map satellite image production tasks, for the high-profile, Sunan , Sandan, folk music has established cadastral management system; completion of Lanzhou, Dunhuang, urn, cooperation, Pingliang, Guazhou, Jiuquan Iron and Steel Group and other cadastral survey 4680 square kilometers and a database-building; complete summary of Tianshui City, land survey tasks; for the prevention and control of geological disasters in the investigation of the basis of digital surveying and mapping results, actively cooperate with the focus on prevention and control of geological disasters in the works carried out; and the City, State Land Resources Bureau, has completed a Lanzhou, Tianshui, Dingxi, Pingliang, Wuwei, Jinchang, Zhangye, Jiuquan City, and Linxia 8 , Gannan mining rights for more than two states the size of the verification mission control surveying, mapping high-grade GPS control points 1940, covering an area of 128.4 thousand square kilometers.
完成了全省65个县区第二次全国农村土地调查数据核查工作,占全省核查量的74%;完成了张掖市国土储备三维系统建设及卫星影像区划图制作任务,为高台、肃南、山丹、民乐建立了地籍管理系统;完成了兰州、敦煌、金塔、合作、平凉、瓜州、酒泉钢铁集团等地籍测量调查4680平方公里和数据库建设;完成了天水市土地调查汇总任务;为地质灾害调查防治提供数字化基础测绘成果,积极配合重点地质灾害防治工程的开展;与市州国土资源局合作,完成了兰州、天水、定西、平凉、武威、金昌、张掖、酒泉八市和临夏、甘南两州的规模以上矿业权核查控制测量任务,测绘高等级GPS控制点1940座,覆盖面积128400平方公里。
-
First according to the hydraulic pressure elevator system diagram, use the machine design and hydraulic transmission knowledge calculates the diameter of the plunger, cylinder tube wall thickness as well as cylinder bottom thickness; second, through the examination confirmation to the obtained result to complete the work of cylinder design; Simultaneously has carried on the component choice and the computation; Through to the system calorific capacity computation the and the volume of cooling water while the fuel tank cools when needs to complete the hydraulic pressure elevator fuel tank design; Based on the system oil stream condition to calculated the tube internal pressure lose, the local pressure loss as well as the all of the pressure lose to carried on the system checking calculation; Finally through the consult correlation design handbook to calculation and examines the belt, the band pulley, the axis, as well as the key, has completed the hydraulic pressure elevator pumping station transmission system design.
首先根据液压电梯系统原理图,利用机械设计与液压传动等方面的知识计算出柱塞的直径、缸筒的壁厚以及缸底厚度,并对所得结果进行校核验证完成了工作油缸的设计;同时进行了元件的选择和计算;其次,通过系统发热量的计算和油箱冷却时需要的冷却水量的计算完成了液压电梯油箱的设计;依据系统油流状态计算出管内压力损失、局部压力损失以及总压力损失进行了系统的验算;最后通过查阅相关设计手册对带、带轮、轴、以及键进行设计计算和校核,完成了液压电梯的泵站传动系统的设计。
-
Firstaccording to the hydraulic pressure elevator system diagram, usethe machine design and hydraulic transmission knowledge calculatesthe diameter of the plunger, cylinder tube wall thickness as wellas cylinder bottom thickness; second, through the examinationconfirmation to the obtained result to complete the work ofcylinder design; Simultaneously has carried on the component choiceand the computation; Through to the system calorific capacitycomputation the and the volume of cooling water while the fuel tankcools when needs to complete the hydraulic pressure elevator fueltank design; Based on the system oil stream condition to calculatedthe tube internal pressure lose, the local pressure loss as well asthe all ofthe pressure lose to carried on the system checking calculation;Finally through the consult correlation design handbook tocalculation and examines the belt, the band pulley, the axis, aswell as the key, has completed the hydraulic pressure elevatorpumping station transmission system design.
首先根据液压电梯系统原理图,利用机械设计与液压传动等方面的知识计算出柱塞的直径、缸筒的壁厚以及缸底厚度,并对所得结果进行校核验证完成了工作油缸的设计;同时进行了元件的选择和计算;其次,通过系统发热量的计算和油箱冷却时需要的冷却水量的计算完成了液压电梯油箱的设计;依据系统油流状态计算出管内压力损失、局部压力损失以及总压力损失进行了系统的验算;最后通过查阅相关设计手册对带、带轮、轴、以及键进行设计计算和校核,完成了液压电梯的泵站传动系统的设计。
-
At present, 70,000 tons / year of adipic acid project completed the overall progress of the project 98%, adipic acid and related projects have been the end, assistive devices and production equipment also has entered the pre-production stage; and 50,000 tons / year project alcohol ketone the overall progress of the project completed 99%, nitric acid and hydrogen projects overall progress of the project 98 percent completed, with test conditions; In addition, 704 pumping stations - natural gas pipeline project Dushanzi overall progress of the project 98 percent completed.
目前,7万吨/年己二酸项目总体工程进度完成了98%,己二酸及配套项目施工已经收尾,辅助装置和生产装置也已经进入试生产阶段;且5万吨/年醇酮项目总体工程进度完成了99%,硝酸及制氢项目总体工程进度完成了98%,具备试车条件;另外,704泵站-独山子天然气管道项目总体工程进度完成了98%。
-
Work experience: Jsp language independent 2009.3 with the completion of a tourist-based information site 2008.7 using java language independent game to complete mine clearance 2007.7 using java language and students of Chinese medicine in collaboration management system design and production 2007.1 with jsp language independent producers completed an e-commerce site 2006.1 using C language independently Tetris game 2005.10 any department Mission branch secretary, learning members Social activities: 2007.8 during the summer vacation time in the Ministry of Oil Ministry of information and intelligence property attachment 2007.7 any time during the summer vacation某网吧network, and achieved good results 2006.4 Marketing Association to participate in school and actively participate in the activities of the Association 2006.3 mixed classes to join the sports department of the Student Union and Blue Society, participated in and organized the Department of basketball Personal qualities: Have a strong sense of curiosity, challenging and competitive awareness, diligence, to endure hardship Self-motivation, learning seriously and have a good self-learning ability Have a good team spirit and team spirit, good communication, coordination, a sense of responsibility
我写的一份中文简历,需要一个英文版本,麻烦哪位厉害的大哥大姐能帮我翻译一下啊,我实在不行了,小弟真的谢谢您!!另外我就30分了,实在对不起大家。。。下面是要翻译的话:工作经历: 2009.3 用jsp语言独立完成一个旅游型信息发布网站 2008。 7 用java语言独立完成扫雷游戏 2007.7 用java语言和同学合作进行医药管理系统的设计与制作 2007.1 用jsp语言独立制作完成了一个电子商务网站 2006。 1 用C语言独立完成俄罗斯方块游戏 2005。 10任系里团支部书记,学习委员社会活动: 2007。 8利用暑假时间在石油部信息情报物业部实习 2007.7利用暑假时间任某网吧网管,取得不错业绩 2006.4 参加校营销协会,积极参加协会的活动 2006.3 加入混合班学生会体育部及蓝协,参与并组织了系篮球赛个人素质:有强烈的好奇心,富有挑战和竞争意识,勤奋、能吃苦自我激励,学习认真,有很好的自学能力有很好的团队精神和协作精神,良好的沟通、协调能力,有责任感
-
The CL data file can be converted to NC code with NC post module of Pro/E, which can shorten design cycle of tricone rock bit, improve design quality and enhance the competitive capacity and innovative ability of enterprises.
在Pro/Engineer环境下首先由软件建立钻头牙轮的三维实体,然后应用Pro/NC模块完成了牙轮内圆孔的粗、精NC加工,生成了CL刀具路径数据;完成了牙轮外圆的粗、精NC加工,生成了CL刀具路径数据,同时完成了对粗、精加工两个序列的合并;通过本研究产生的CL文件经过NC post模块可生成数控机床的控制代码,从而可以缩短三牙轮钻头的设计制造周期,提高产品的设计质量,提高企业的技术创新能力和市场竞争能力。
- 更多网络解释与完成了相关的网络解释 [注:此内容来源于网络,仅供参考]
-
Mission accomplished:任务完成了
How'd it go?|放生怎么样? | Mission accomplished.|任务完成了 | Was he happy?|他开心吗?
-
Angry Men:一间屋子完成了所有的推理与判断
The last king of scotland:乌干达的血腥统治将军的故事. | 12 Angry men:一间屋子完成了所有的推理与判断. | The last of the Mohicans:看看印第安人的护卫之战.
-
We've already finished the work anterior to the schedule:我们已经提前完成了工作
619. You should fix the television antenna before recei... | 620. We've already finished the work anterior to the schedule. 我们已经提前完成了工作. | 621. This story is about people anterior to the fl...
-
You payed for your place in this world: Attagirl:你已经完成了使命:真棒
Don't say luck is something like a riddle 不要说幸运是遥不可... | You payed for your place in this world: Attagirl! 你已经完成了使命:真棒! | Better sit tight, gotta drop that phone 最好挺直坐下,挂掉该死...
-
Done:完成了
柯朗之说数学归纳法是以一种特别的方式证明关于无穷的命题,是否因为这里不是直接地、一步到位地完成了(done)对无穷命题的证明,只是潜在地证明无穷的结论呢?
-
Good done:好了,完成了
Thank you.|谢谢你 | Good. done.|好了,完成了 | Water.|水
-
Done, Drill Sergeant:完成了,教官
544]减去你用掉的油费 Less what you spends on gas-- | 545完成了,教官! Done, Drill Sergeant! | 546]阿甘! Gump!
-
The major part of the work is done:这项工作的大部已经完成了
②She has written a major novel.她写了一部高质量的小说. | ③The major part of the work is done.这项工作的大部已经完成了. | major作名词用,意思是"主修课程". 如:
-
This diploma certifies that you have completed high school:这文凭证明了你完成了高中的学业
4.certify: declare true or correct by official statements; a... | This diploma certifies that you have completed high school.这文凭证明了你完成了高中的学业. | 5.coincide: correspond exactly; be in agr...
-
Who said my op was complete? -[ Horn honks ]:谁说我的任务完成了
My op was to stop you from completing yours.|我的任务是阻止你完成你的... | -Who said my op was complete? -[ Horn honks ]|谁说我的任务完成了? | -Lighten up, man . -lt's just an op.|- 放轻松点 - 这只是任务...