- 更多网络例句与完工试验相关的网络例句 [注:此内容来源于网络,仅供参考]
-
On the base of analysis concerning Tianjing and Tanggo-Xingang soil properties and observation results of settlements, some rules of settlement of buildings in the area were obtained. Final settlements, settlements at end of construction and the time of final settlement were discussed. Tests used for determining paramcters of four models were introduced. The parameters in Duncan-Chang model are determined from isotropic consolidation test and the parameters in Gong-Xiannan model from Ko consolidation tests while the parameters in the model proposedin chapter 2 from the equal increment stress ratio test and ones in the bounding surface model developed in chapter 3 from the effective stress-path of CIU test.
根据天津市区及塘沽新港地区的地基土质情况以及沉降观测资料,分析了该地区建筑物沉降的一些规律,讨论了最终沉降量,完工时的沉降量以及沉降稳定时所需要的时间,介绍了确定各模型参数所需要的试验:Duncan—Zhang模型参数根据等向固结的三轴试验确定;龚晓南Ko固结模型根据Ko固结三轴试验确定;本文建立的非线性弹性模型根据等向增量应力比试验确定,边界面模型参数可根据固结不排水剪切试验的有效应力路径确定。
- 更多网络解释与完工试验相关的网络解释 [注:此内容来源于网络,仅供参考]
-
Armstrong:斯特朗
二舰俱由英国"阿姆斯特朗"(Armstrong)所建(部份建造后来被外判与米切尔Mitchell. 27吋,基本上为无防护巡洋舰. 全舰人员137名,管带(舰长)属参将. 超勇及扬威完工后,由清朝海军派出军官及水兵赴船厂所在地纽卡素试验,然后在.
-
date of tax levied:纳税日期
date of substantial completion ==> 实际完工日期 | date of tax levied ==> 纳税日期 | date of test ==> 试验日期
-
Retesting Prior to Contract Completion:合同完工前的重新试验
11.11 Failure to Pass Tests Prior to Contract Completion未能通过合同完工前的试验 | 11.12 Retesting Prior to Contract Completion 合同完工前的重新试验 | 12 DEFECTS 缺陷