- 更多网络例句与墙台相关的网络例句 [注:此内容来源于网络,仅供参考]
-
All equipments investments will be lower than old type equipments, truely attain efficiently and consume low a machines to use more, if reach a factory to need one set equipments and then can produce:The turf-grass brick, large road follows a stone, water mill brick, difference type road noodles azulejo, build brick wall brick, eight bore bricks and protect ascent brick, the farmland capital construction and highway two side 1 time's modeling one U type catchment dike, and Yan plank...etc.
6〉全部设备投资要低于老型设备,真正做到高效、低耗一机多用,如构件厂只需一台设备就能生产:草坪砖、大型路沿石、水磨砖、异型路面花砖、砌墙砖、八孔砖、护坡砖、农田基本建设及公路两侧一次性成型U型排水渠、檐板等多种水泥制品。
-
The frame, which is formed by buttress, breast wall and side wall bear the horizontal loads, and group pile cap bears the resultant force of vertical and horizontal loads.
由扶壁、墙、墙组成的框架抵抗水平荷载,而以承台、基抵抗垂直及水平荷载的共同作用力。
-
Over there towards the far end of the wall, are ten hemming machines .
莫罗:那边,在墙的那头,是十台包缝机。
-
The influence of the depth of diaphragm wall-pile cap, the soil properties at pile tip, the distance between diaphragm wall and pile, and the size of pile on the deformation and load transfer of diaphragm wall-pile system are investigated.
并分析了墙桩顶部承台厚度、桩持力层、墙桩净距以及桩截面积等的变化对墙桩荷载分担以及整体变形的影响。
-
Through the comparative analysis of the earth pressure calculated by the different calculation methods, it is known that when the earth pressure behind the abutment of the integral abutment bridge under the action of rising temperatures is calculated, it is not proper to use the m method to calculate the resistance coefficients of the abutment back wall and column earth while the resistance coefficient of the abutment back wall earth can be calculated by the Broms method. It is proper that the resistance coefficients of the earth of the abutment and pier piles should be considered by the p-y curve.
通过对不同方法计算的台后土压力的对比分析,得知:在计算升温引起的整体式桥台桥梁台后土压力时,桥台背墙及台柱土的水平抗力系数计算采用m法是不适合的;桥台背墙后填土的水平抗力系数可采用Broms法计算;土对台桩及墩桩侧的水平抗力系数按p-y曲线来考虑是适合的。
-
A basic panel is manufactured commonly in the size 12 x 2.85m (34.2 m2) on a casting table, which is the production unit for Rapid Wall, and in a large enough size to forman entire wall of a building structure.
一块基准墙板在浇铸台通常作成12 x 2.85m (34.2 m2)的尺寸,是速成墙的生产单位,尺寸大得足够成为一个建筑结构的一面墙。
-
We hope you pay more attention to jobs are as follows haven't been finished this week:(1) right and left side of upper water wall has been aligned and fixed;(2) Nine downcomers been pre-stored;(3) All the wall packing aligned and fixed, then install right and left side rigid beam;(4) Finishing welding counterpart of front wall packing;(5) Get two booster pump for turbine driven boiler feed water pump aligned and make inspection;(6) Electric Feed Water Pump Unit, Coupling and Motor Pump positioned;(7) Equipment in Start-up Boiler House aligned and make inspection;(8) Get three Reusing Water Pump aligned;(9) Equipment in Integrated Water Pump House aligned and make inspection.
本周,以下工作未完成,希望贵单位引起重视:(1)上水左右侧找正完,且加固完;(2)下降管9根预存完;(3)包墙全部找正完,加固完,之后安装左右侧刚性梁;(4)前包墙对口焊接完毕;(5)2台汽动前置泵找平找正,并验收;(6)电动给水泵组,耦合器和电泵就位;(7)启动锅炉房内设备找平找正,并验收;(8)3台复用水泵就位;(9)综合水泵房内设备找平找正,并验收。
-
Job as follows shall be finished next week:(1) Get right and left side of upper water wall positioned and reinforced;(2) Finish Pre-store nine downcomers;(3) All the wall are positioned and reinforced, and then install right and left side rigid beam;(4) Finish front wall counterpart welding;(5) Hoisting two rare roofs, Middle-temperature RH, four high temperature RH headers, hoist headers of middle-temperature RH and high-temperature RH, it can't install lifting rod.
下周,锅炉以下工作需要完成:(1)上水左右侧找正完,且加固完;(2)下降管9根预存完;(3)包墙全部找正完,加固完,之后安装左右侧刚性梁;(4)前包墙对口焊接完毕;(5)后顶棚吊装2片、中温再热器、高温再热器集箱4个,吊挂中再和高再集箱时,不能安装吊杆。6)2台汽动前置泵找平找正,并验收;(7)电动给水泵组,耦合器和电泵就位;(8)启动锅炉房内设备找平找正,并验收;(9)3台复用水泵就位;(10)综合水泵房内设备找平找正,并验收。
-
Hardware control panel, wall panels, service lights, VOD Taiwan, the Taiwan concert.
硬件有控制面板,墙面板,服务灯,点歌台,演唱台。
-
The tests of shaking table for a building model and anti-shearing of 9 pieces of bearing wall of masonry have been carried out to investigate the effect on results of shaking table test.
通过组合墙片的拟静力试验和模型房屋的振动台试验,分析研究了人工质量模拟对砖混结构振动台试验的作用和影响。
- 更多网络解释与墙台相关的网络解释 [注:此内容来源于网络,仅供参考]
-
bench table:墙台, 墙基
the ranks 普通士兵们 | bench table 墙台, 墙基 | proving room 发酵室
-
coping stone:盖顶石;墩台石
coping 盖顶(墙或栏);墙帽;栏顶 | coping stone 盖顶石;墩台石 | copper tube 铜管
-
proscenium wall:舞台台口侧墙
proscenium opening 舞台开口 | proscenium wall 舞台台口侧墙 | prostration 衰竭
-
counterfort retaining wall:挡土墙后垛墙(台)
436 14. 挡土墙 扶垛式挡土墙 counterfort retaining wall | 437 14. 挡土墙 后垛墙(台) counterfort retaining wall | 438 14. 挡土墙 基础墙 foundation wall
-
counterfort retaining wall:后垛墙(台)
垛式挡土墙扶垛式挡土墙counterfort retaining wall | 后垛墙(台)counterfort retaining wall | 基础墙foundation wall
-
scarcement:墙凹台
scarcelyhardlyany 几乎没有 | scarcement 墙凹台 | scarcement 壁阶
-
scarcement:墙凹台 壁阶
scarcemeansofproduction 紧缺生产资料 | scarcement 墙凹台 壁阶 | scarcemetal 稀有金属
-
stone base:石垣,包括石垣墙,橹台,天守台等
stone base 石垣,包括石垣墙,橹台,天守台等 | Shikizan Castle 信贵山城 | Kakegawa Castle 掛川城
-
bench stop:木工台挡头
bench snips || 台剪 | bench stop || 木工台挡头 | bench table || 墙台, 墙基
-
o Wall sconces:挂墙蜡烛台(嵌在墙上的)
o Beds 几张床 | o Wall sconces 挂墙蜡烛台(嵌在墙上的) | o Lanterns 灯笼