英语人>词典>汉英 : 基础下部组织 的英文翻译,例句
基础下部组织 的英文翻译、例句

基础下部组织

基本解释 (translations)
infrastructure

更多网络例句与基础下部组织相关的网络例句 [注:此内容来源于网络,仅供参考]

A social and cultural infrastructure emerged together with public institutions such as the Hebrew University and Hadassah Hospital on Mount Scopus, Jewish Agency headquarters, YMCA, the King David Hotel and the Central Post Office.

一种社会和文化基础下部组织浮现出来,再加上公众公共机构,例如是希伯莱大学和斯各帕斯山的哈达萨医院,犹太事务局的总部,基督教青年会,大卫王旅馆以及中央邮局等。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

更多网络解释与基础下部组织相关的网络解释 [注:此内容来源于网络,仅供参考]

inflated value:膨胀价格

765inflated profits虚增利润 | 766inflated value膨胀价格 | 767infrastructuren. 下部构造,下部组织,基础结构,基础设施

inflict sth on sb:使某人遭受(打击、惩罚等)

724inflationn. 通货膨胀 | 725inflict sth on sb使某人遭受(打击、惩罚等) | 726infrastructuren. 下部构造,下部组织,基础结构,基础设施

l Secondary distribution voltage:二次配电电压

l Primary distribution system 一次配电系统 | l Secondary distribution voltage 二次配电电压 | l Infrastructure n. 下部构造,下部组织,基础结构,基础设施

prompted:提示, 鼓动, 促使, (给演员)提白

infrastructure 下部构造, 基础下部组织 | prompted 提示, 鼓动, 促使, (给演员)提白 | uranium 铀

speculate on:考虑, 推测

63:His wealth was made over to his children.他的财产已移交他的孩子们了. | 64:speculate on考虑, 推测 | 65:infrastructure下部构造, 基础下部组织

inter- between, among:在...中间

structure-infrastructure下部构造、下部组织、基础设施、基础建设 | inter-: between; among在...中间 | change-interchange互换