This article, based on key technique and different objective conditions in terms of geography and geology, such as soft soils, shallow water, and heavy sludge seen in ChangHong tunnel, presents features of key construction technique in ChangHong Project, such as slope stability and bottom settlement control in dry dock, cracks control and freeboard control technique respectively for element fabrication, pile foundation construction, and piles-tube connection technique, such technique like, sludge cleanup in immersion trench, and element sinking/positioning technique together with element joint (including connection to abutment and final joint).
文章根据沉管隧道工程建设的关键技术和宁波常洪隧道工程土软、水浅、淤重等客观地质地理环境条件,介绍了宁波常洪沉管隧道工程的施工技术特点,如干坞边坡稳定和管底基础变形的控制技术、本体防水混凝土管段制作的裂缝和干舷控制技术、管段江中桩基基础的施工和其与管底连接的技术工艺、管段基槽清淤和沉放定位施工技术,以及管段接头连接(包括与岸边段的连接和最终接头)的施工技术等。
-
This article, based on key technique and different objective conditions in terms of geography and geology, such as soft soils, shallow water, and heavy sludge seen in ChangHong tunnel, presents features of key construction technique in ChangHong Project, such as slope stability and bottom settlement control in dry dock, cracks control and freeboard control technique respectively for element fabrication, pile foundation construction, and piles-tube connection technique, such technique like, sludge cleanup in immersion trench, and element sinking/positioning technique together with element joint (including connection to abutment and final joint).
本文根据沉管隧道工程建设的关键技术和宁波常洪隧道工程土软、水浅、淤重等客观地质地理环境条件,介绍了沉管隧道工程的施工技术特点,如干坞边坡稳定和管底基础变形的控制技术、本体防水混凝土管段制作的裂缝和干舷控制技术、管段江中桩基基础的施工和其与管底连接的技术工艺、管段基槽清淤和沉放定位施工技术,以及管段接头连接(包括与岸边段的连接和最终接头)的施工技术等。
-
This article, based on key technique and different objective conditions in terms of geography and geology, such as soft soils, shallow water, and heavy sludge seen in ChangHong tunnel, presents features of key construction technique in ChangHong Project, such as slope stability and bottom settlement control in dry dock, cracks control and freeboard control technique respectively for element fabrication, pile foundation construction, and piles-tube connection technique, such technique like, sludge cleanup in immersion trench, and element sinking/positioning technique together with element joint (including connection to abutment and final joint).
本文根据沉管隧道工程建设的关键技术和宁波常洪隧道工程土软、水浅、淤重等客观地质地理环境条件,介绍了沉管隧道工程的施工技术特点,如干坞边坡稳定和管底基础变形的控制技术、本体防水混凝土管段制作的裂缝和干舷控制技术、管段江中桩基基础的施工和其与管底连接的技术工艺、管段基槽清淤和沉放定位施工技术,以及管段接头连接(包括与岸边段的连接和最终接头)的施工技术等。中国诺宇综合网http://www.siaaa.com
-
This article, based on key technique and different objective conditions in terms of geography and geology, such as soft soils, shallow water, and heavy sludge seen in ChangHong tunnel, presents features of key construction technique in ChangHong Project, such as slope stability and bottom settlement control in dry dock, cracks control and freeboard control technique respectively for element fabrication, pile foundation construction, and piles-tube connection technique, such technique like, sludge cleanup in immersion trench, and element sinking/positioning technique together with element joint (including connection to abutment and final joint).
本文根据沉管隧道工程建设的关键技术和宁波常洪隧道工程土软、水浅、淤重等客观地质地理环境条件,介绍了沉管隧道工程的施工技术特点,如干坞边坡稳定和管底基础变形的控制技术、本体防水混凝土管段制作的裂缝和干舷控制技术、管段江中桩基基础的施工和其与管底连接的技术工艺、管段基槽清淤和沉放定位施工技术,以及管段接头连接(包括与岸边段的连接和最终接头)的施工技术等。中国论文联盟http://www.lwlm.com
-
1 Laid on the observation points, the next gate in the first paragraph and the chamber are in side-dock-type pier and construction of a wide bottom seam laid 8 to each end of the settlement within 24 observation points nails; chamber 14 Fu wall segments are in lock wall at both ends of the floor laid four nails into account the settlement of 56 observation points; settlement nail making use of 40cmФ18 rebar welded copper top round hat hemisphere processed, buried, when coupled with oblique bars welded to the end of plate surface layer and vertical reinforcement, the top highlight the concrete surface, about 1.5 ~ 2.0cm in order to guarantee points are solid.
3.2.1观测点的布设上、下闸首及闸室坞式段均在边墩底板及施工宽缝的两端各布设8个沉降钉计24个观测点;闸室14节扶壁段均在闸墙底板两端各布设4个沉降钉计56个观测点;沉降钉的制作采用40cmФ18螺纹钢顶端焊接镀铜半球圆帽加工而成,埋设时配以斜筋焊接在底板面层及竖向钢筋上,顶端突出砼表面1.5~2.0cm左右,以保证点位稳固。
- 更多网络解释与坞边相关的网络解释 [注:此内容来源于网络,仅供参考]
-
side door loader:舷侧装载机
side docking keel 边坐坞龙骨 | side door loader 舷侧装载机 | side door 侧开门
-
side docking keel:边坐坞龙骨
side discharge 舷侧卸货 | side docking keel 边坐坞龙骨 | side door loader 舷侧装载机