- 更多网络例句与坑口相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Hong Kong District Council election, rivaled with two indigenous villagers, scored 12.6% of the poll.
1999年11月参加香港西贡坑口东区区议会选举,与 2名乡绅对撼,得票率12.6%。
-
Will come to rui Fang town water nan hole gold waterfall ,this seat at road side recite lean on have not ear teapot mountain cascade waterfall, because includes abundant pyrite with sulphur arsenic copper mine, lets earths surface submit golden, too is form yin and yang seas chief water source, ases gallop waterfall current let out but under shi jiu Like a piles up with gold mines waterfall, dazzling affecting, a screen limpid water curtain of straight rush gold yellow earths surface let people for a time rise play water idea, justs because heres water quality include huge amount of heavy metal material, for oneself safety, or prudent, gold waterfall locates in square self-improvement bridge side and long benevolence digging under this mountain six pithead, because in the early time at headstream picks up copper mine, mountain spring water with rainwater infiltration, slag sand deposits stream bed, and has fungus adhere multiply, hypsography differences compares big so form gold yellow waterfall spectacular sight, gold waterfall is gold melon stone local very characteristic a scenic spot, usually too very easy meets come this place screen nuptial dress new one.
来到瑞芳镇水湳洞的「黄金瀑布」,这座位在公路旁背倚无耳茶壶山的层叠瀑布,因含有丰富的黄铁矿与硫砷铜矿,让地表呈金黄色,也是形成阴阳海的主要水源,当奔腾的瀑水流泄而下时就像是一座堆满金矿的瀑布般,耀眼动人,一幕清澈的水帘直冲金黄色的地表让人一时兴起玩水念头,不过由於这里的水质含有大量重金属物质,为了自身安全,还是三思而后行,黄金瀑布位於本山六坑口下方的自强桥畔及长仁矿区,因为早期在上游采铜矿,山泉水与雨水渗入,矿砂沉积溪床,又有菌类附着滋生、地势落差较大所以形成金黄色的瀑布奇观,黄金瀑布是金瓜石当地很有特色的一个景点,平时也很容易遇到来此地拍摄婚纱的新人。
-
Interchange station for the Tsuen Wan Line, Tung Chung Line or Airport Express.
左边既车门将会打开。下一站:坑口。左边的车门将会打开。
-
We take a taxi to Hang Hau MTR station and go home.
之后,我们乘的士去坑口地铁站离开。
-
"Hang Hou","Central","$12.8#","6 - 13 min","06:00 - 23:40","Po Ning Road, Eastern Harbour Crossing, Island Eastern Corridor, King's Road, Gloucester Road,Chater Road, Connaught Road Central, Pedder Street",East Point City, Tseung Kwan O Centre, Victoria Park, Causeway
"坑口","中环",,"6 - 13分钟",,"宝宁路东区海底隧道东区走廊英皇道告士打道遮打道干诺道中毕打街","东港城将军澳中心维多利亚公园铜锣湾避风塘香港大会堂立法会大楼遮打花园皇后像广场香港汇丰银行总部大厦"
-
Project Evaluation ; Financing Project ; Pithead Power Plant.
项目评估;贷款项目;坑口电厂
-
Power plant of pithead of this coal company is to use what produce inferior coal and coal washing plant oneself is medium the item of integrated interest expenditures that coal makes fuel.
该煤炭企业坑口电厂是利用自产劣质煤和洗煤厂的中煤作燃料的综合利用项目。
-
The ratio of horizontal diatance from pipeline, base bordline of adjacent building to inner wall of pithead and vertical distance from base underside to bottom of foundation pit refer to chart 3.1.3
为管线、邻近建筑物基础边缘离坑口内壁的水平距离与基础底面距基坑底垂直距离的比值,见图3.1.3。
-
With the geological-economic evaluation program for pithead heap-leaching mining uranium deposits developed by the authors and the data of column-leaching tests and the geological resrver, the geological-economic evaluation is made to the residual geological reserves of both Lujing and Huangfengling deposit, and the geological reserves of Yangjiaonao deposit of the depleted mines in Lujing uranium ore-field, central-southern China.
采用自主研发的坑口堆浸地质经济评价程序,利用室内柱浸工艺实验数据和矿床地质资源数据,对鹿井铀矿田危机矿山鹿井、黄蜂岭矿床的剩余地质资源及羊角脑矿床的地质资源进行了坑口堆浸地质经济分析。
-
Under this geological-evaluation model a computer evaluating program is made in Ziyuan and Lujing uranium ore -fields.
通过对硬岩型铀矿坑口堆浸法的工艺流程分析,总结出坑口堆浸成本由矿石开采费用、主要原材料费用等14项要素组成,并建立了地质经济评价模型。
- 更多网络解释与坑口相关的网络解释 [注:此内容来源于网络,仅供参考]
-
bankhead:岸首
bankhead 丁坝 | bankhead 岸首 | bankhead 坑口
-
Hang Hau Grazier Association:坑口农牧业协会
Hang Hau Fishermen's Better Living Co-operative Society, Limited 坑口渔民改善生活有限责任合作社 | Hang Hau Grazier Association 坑口农牧业协会 | hang trawl 掺缯
-
pithead:坑口
pith 要旨 | pithead 坑口 | pithecanthrope 猿人
-
pithead:坑口, 其附近建筑物 (名)
pith 除去木髓, 杀死 (动) | pithead 坑口, 其附近建筑物 (名) | Pithecanthropus 猿人属; 爪哇直立猿人 (名)
-
pithead:坑口/其附近建筑物
pith /精力/ | pithead /坑口/其附近建筑物/ | pithecanthrope /猿人/
-
pithead power plant:坑口电站
pitch shortening 绕组节距缩短 | pithead power plant 坑口电站 | pitot tube 皮氏临测定管
-
pithead power plant:坑口电厂
电阻应变仪 resistance strain instument | 坑口电厂 pithead power plant | 煤柱尺寸 pillar dimension
-
Xuzhou gangue power plant pithead longgu mouth:徐州龙固坑口矸口发电厂
华能营口电厂二期 Huaneng yingkou power plant | 徐州龙固坑口矸口发电厂 Xuzhou gangue power plant pithead longgu mouth | 广州新会双水发电厂 Guangzhou new will double water plants
-
fallway:坑口
fallup 污染 | fallway 坑口 | false alarm 假警报
-
leadage:煤炭由坑口運至裝運港間的運費
煤碼頭 coal wharf | 煤炭由坑口運至裝運港間的運費 leadage | 煤油試驗 kerosene test