英语人>词典>汉英 : 任务开关 的英文翻译,例句
任务开关 的英文翻译、例句

任务开关

词组短语
task switch
更多网络例句与任务开关相关的网络例句 [注:此内容来源于网络,仅供参考]

From the burden increased aspect clarify set up the necessity of station, then pass to drew up to set up generalize of transformer substation and line direction to consider, and pass to analysis of carry the data, safety, economic and dependable consider and made sure the 110 kV, 35 kV, 10 kV and station use electricity of lord connect line, then again through burden calculation and power supply scope made sure main number, capacity and model number of the transformer set, also in the meantime make sure the station uses capacity and model number of transformer, end, according to biggest keep on work electric current and short circuit calculating of calculation result, to the high pressure Rong break a machine, insulate a switch, female line, insulate son and wear a wall set tube, electric voltage with each other feeling machine, electric current with each other the feeling machine carried on choose a type, thus completed a 110 kV electricity a part of design.

本文首先根据任务书上所给系统与线路及所有负荷的参数,分析负荷发展趋势。从负荷增长方面阐明了建站的必要性,然后通过对拟建变电站的概括以及出线方向来考虑,并通过对负荷资料的分析,安全,经济及可靠性方面考虑,确定了110kV ,35kV ,10kV 以及站用电的主接线,然后又通过负荷计算及供电范围确定了主变压器台数,容量及型号,同时也确定了站用变压器的容量及型号,最后,根据最大持续工作电流及短路计算的计算结果,对高压熔断器,隔离开关,母线,绝缘子和穿墙套管,电压互感器,电流互感器进行了选型,然后进行配电装置和平面布置的设计以及防雷的设计,从而完成了110kV 电气一次部分的设计。

Easily reworked to suit the task, it was "started" by a mercury switch at burnout, and "stopped" by the closing of the air-speed switch as the rocket slowed near the peak of trajectory.

很容易改造,以适应任务,这是"开始"由水银开关倦怠,和"停止"闭幕空气高速开关作为火箭放慢近山顶的轨迹。

The aim of these researches is to improve the work performance and reliability of switching devices and finish the protection and control of the power supply system. This work is based on the design of VCB with multiple breaks and vacuum arc of high current in short-gap is studied.

本文探讨真空开关电弧外部形态特征和内部等离子体参数的诊断,旨在提出相应的调控理论以提高开关装置的工作性能和指标,完成电力系统的保护和控制任务。

In this paper we introduce a schema for embedded soft PLC system.Firstly We discuss development,characteristics,concept and key technology of soft PLC.Secondly we particularize this schema from hardware and software platform.

软PLC综合了计算机和PLC的开关控制、模拟量控制、数学运算、数值处理、通信网络等功能,通过一个多任务的内核,提供了强大的指令集、快速而准确的扫描周期、可靠的操作和可连接的各种I/O系统及网络的开发结构。

Continue monitoring interface status when switching mode/task.

继续监测接口状态开关模式/任务。

The average linewidth enhancement factor and the component effective linewidth enhancement factor are introduced for the performance analysis of interferometer all optical switches based on cross phase modulation of SOAs.

二、合理地选择和设定全光开关的性能参量是评价全光开关在OTDM解复用子系统中解复用性能的首要任务,本文选择全光开关中SOA平均线宽增强因子和器件有效线宽增强因子分析了基于SOA相位调制效应的干涉仪全光开关的性能。

By making point settings and switch assignments traction control can be applied whenever necessary.

通过做点设置和开关任务牵引控制可以是应用的,每当必要。只有当节流孔从中性被移动向餵方向时,这个作用经营

From the burden increased aspect clarify set upthe necessity of station, then pass to drew up to set up generalizeof transformer substation and line direction to consider, and passto analysis of carry the data, safety, economic and dependableconsider and made sure the 110 kV, 35 kV, 10 kV and station useelectricity of lord connect line, then again through burdencalculation and power supply scope made sure main number, capacityand model number of the transformer set, also in the meantime makesure the station uses capacity and model number of transformer,end, according to biggest keep on work electric current and shortcircuit calculating of calculation result, to the high pressureRong break a machine, insulate a switch, female line, insulate sonand wear a wall set tube, electric voltage with each other feelingmachine, electric current with each other the feeling machinecarried on choose a type, thus completed a 110 kV electricity apart of design.

本文首先根据任务书上所给系统与线路及所有负荷的参数,分析负荷发展趋势。从负荷增长方面阐明了建站的必要性,然后通过对拟建变电站的概括以及出线方向来考虑,并通过对负荷资料的分析,安全,经济及可靠性方面考虑,确定了110kV ,35kV ,10kV 以及站用电的主接线,然后又通过负荷计算及供电范围确定了主变压器台数,容量及型号,同时也确定了站用变压器的容量及型号,最后,根据最大持续工作电流及短路计算的计算结果,对高压熔断器,隔离开关,母线,绝缘子和穿墙套管,电压互感器,电流互感器进行了选型,然后进行配电装置和平面布置的设计以及防雷的设计,从而完成了110kV 电气一次部分的设计。

更多网络解释与任务开关相关的网络解释 [注:此内容来源于网络,仅供参考]

tool breakage:工具划伤

intellectual deterioration 智力衰退 | tool breakage 工具划伤 | task switch 任务开关

food for thought:人口无限

war aint what it used to be 开关战争迷雾 | food for thought 人口无限 | redio free zerg 任务游戏时的隐藏的歌曲

TIC Target Intercept Computer:目标截击计算机

TIA Trigger Internet Adapter 切换开关的因特网衔接器 | TIC Target Intercept Computer 目标截击计算机 | TIC Task Interrupt Control 任务中断控制

Task Switch:任务开关

tool breakage 工具划伤 | task switch 任务开关 | delorenzite 钛钇铀矿, 铁钛铀钇矿

Yuma:犹马

诺格公司已於2005年8月在亚利桑那州美国陆军犹马(Yuma)测试场使用1架RQ-8A进行了一次再补给任务展示. 展示过去中,该架VTUAV飞往其地面控制站视线外的预定补给点,在著陆后士兵们取下其搭载的2具荚舱,然后按下机上一个开关,