英语人>词典>汉英 : 交付周期 的英文翻译,例句
交付周期 的英文翻译、例句

交付周期

词组短语
delivery cycle
更多网络例句与交付周期相关的网络例句 [注:此内容来源于网络,仅供参考]

Since the Arjun's assembly takes 12-18 months, a fresh order of Arjuns will start being delivered 30-36 months after the order is placed.

由于阿琼的生产周期要12-18个月,新的订单要在30-36个月后交付。

The progress and quality of the cold frame bend-forming will influence ships building period and delivery directly.

肋骨冷弯加工的进度和质量直接影响船舶的建造周期和交付使用。

The issue is that every deliverable called for in your project life cycle must be tested.

问题是你的项目生命周期中的每一个交付产品都必须被测试。

One of the most competitive prices, flexible mode of operation, the shortest delivery cycle, first-class after-sales service is our advantage, companies have substantial conventional spot.

最具竞争的价格、灵活的经营方式、最短的交付周期、一流的售后服务是我们的优势所在,公司备有大量常规现货。

At shortenned zero receive, fixing of partses with consign time after, should the company expand to the service airplane of havings turnover piece(in addition to launching machine and airplane to rise and fall), but not only be limited by the product of our company 6 year ago, Collins' company of average fix a period is 23 days.

在缩短了零部件的接收、修理和交付时间后,该公司将服务扩展到飞机的所有周转件(除发动机和飞机起落架外),而不仅限于本公司的产品。6年前,柯林斯公司的平均修理周期是23天。

Islay orders will be in accordance with the brand does not seek many blind dealer orders, require dealers to combine the areas where consumer demand in order to ensure that the islay down jacket in the terminal according to the dynamic sales and profitability, with the security market opportunities, distributors even 100% of the cash delivery is also enthusiastic; have a high standard of cash flow, according to islay brand will increase input a new round of product development, branding, and so the cycle makes brands, distributors, consumers win.

伊斯雷订单将与品牌不寻求许多盲人经销商的订单,要求经销商相结合的地区,消费者的需求,以确保在终端下夹克艾莱根据动态的销售和盈利,市场的安全,根据机会,经销商甚至100%的现金交付,也热情,有一个高标准的现金流,根据艾莱品牌将加大投入了新一轮的产品开发,品牌等,使品牌的周期,经销商,消费者双赢。

A robust scope for evaluation and test must encompass every project deliverable at each phase in the development life cycle.

评价和测试的一个相对坚固的内涵范围必须包括项目在开发周期每一个阶段的每一个交付产品。

The cycle stock is the quantity of stock which is in permanent turnover and is understood as a half of an average size delivery.

该周期股票,股票的数量,这是永久的营业额,并作为一个普通大小的交付一半的理解。

The acceleration profile of the crane motion is designed to induce minimum payload pendulation during transpo rt,while the deceleration stage is designed to ensure freed om of residual oscillation near the end of the transport,and to deliver the payload at the target point.The techniques induce payload pendulation at least one half ofan oscillation cycle or integer multiples during each of the acceleration and deceleration stages.Starr(1995)designed a symmetric two-step acceleration and deceleration profile to transfer a suspended object.The duration on the constant acceleration steps is assumed to be negligible relative to the period of the payload oscillation.A linear approximation method of the oscillation period is used to generate the two-step symmetric acceleration profile.

3.1投入成型技术,各种形式的投入shapers , convolved参考命令,产生形投入指挥,驾驶起重机提出一套距离沿一套path.the加速度概况起重机议案旨在诱使最低载重pendulation期间transpo rt ,虽然减速阶段,目的是确保freed om残余振荡接近尾声的运输,并交付载荷到达目标point.the技巧诱使载荷pendulation至少一半ofan振荡周期或整数倍数。

Unearned revenue due to undelivered elements is recognized ratably on a straight-line basis over the related product ' s life cycle.

尚未完成交付而记入不应得的收入账目的金额应采用相关产品的生命周期直线法来应征税收。

更多网络解释与交付周期相关的网络解释 [注:此内容来源于网络,仅供参考]

Deliverable:交付品

在使用严格意义上的软件开发周期(SDLC,software development lifecycle)创建应用程序的一般阶段中,在这个周期中有很多可交付品(deliverable)必须交付,包括正式的访谈、详细的设计文档、与现有系统审的语义映射、流程文档等.

delivery cycle:交付周期

delivery conduit 输出管路 | delivery cycle 交付周期 | delivery date 交船日期

order to delivery cycle:从订单到交付的周期

order processing 订单处理; 订货处理; 订单产品的加工 | order to delivery cycle 从订单到交付的周期 | outbound movement 外向运输

Macrocycle:宏周期

ROPES线程同时在三个不同的等级或时间段上进行,它们是宏周期(macrocycle)、微周期(microcycle)和纳周期(nanocycle). 宏周期的时间跨度可以是几个月甚至几年,包括从概念生成到最后交付的整个开发线程. ROPES的宏线程包括四个互相交叠的阶段,