water tube plate
- water tube plate的基本解释
-
-
水管板
- 相关中文词汇
- 水管板
- 更多网络例句与water tube plate相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The water chamber takes the shape of tilting cube, in favor of uniform distribution of cooling water on tube plate surface. The tube bundle is divided into two groups of zygomorphy according to the bisection system and it has eight support clapboards. The siphonopore center of each clapboard increases a certain distance corresponding to that of two tube plates and the cooling tube takes the shape of arch. The two-way cooling water of bisection flows through the condenser in opposite direction so as to improve the distribution of heat load for tube bundle. Around the throat of condenser, the final stage low-pressure heater, air extraction tube, intake device of bypass exhaust and the like are deployed.
它的特点是:水室呈倾斜立方体形状,有利于冷却水流在管板面上均匀分布;由于采用对分制,管束相应地分为左、右对称的两组,并且管束设有八块支撑隔板,每块隔板的管孔中心相对于两端管板的管孔中心依次抬高一定的距离,以使冷却管呈拱形状;对分制的两路冷却水以相反方向流过凝汽器,从而改善管束的热负荷分布;在凝汽器喉部布置了末级低压加热器,抽汽管道及旁路排汽接受装置等。
-
When a sudden power failure or accident or normal pump stops when the pump stops, the valve inlet water velocity to reduce stress Agency, the valve plate also fall, when its velocity is zero (that is, inlet flow rate is zero Department), large valve plate because of its own gravity and rapidly turn off (time 3s ~ 5s), the majority of water to prevent backflow, when the valve before and after the formation of a water pressure, water stress, on the one hand through the small valve at the bottom of the three slot for pressure relief vent pressure. 4 water stress from the bypass tube into the cavity patch up the control room (this process for the suction pressure chamber that can effectively absorb the energy of water), when water stress on cavity than inferior vena cava, the pressure of water promote the diaphragm down mobile , the current cavity pressure of water being squeezed out all the small valve plate slowly drop back to standby status, the process time to ease closure adjustable (3s ~ 150s), then the valve has been fully closed, watertight.
当突然停电或事故停泵或正常停泵时,阀门进水口处压力水流速降低,大阀板也随之下降,当其流速为零时,大阀板由于自身重力而迅速关闭(时间3s~5s),可防止大部分水倒流,此时阀门前后形成一种水压差,压力水一方面通过小阀板底部的三条泄压槽进行泄压。4)压力水从旁通管进入膜片控制室上腔(此过程为吸压腔,能有效吸收一部分水能量),当上腔压力水大于下腔时,压力水推动膜片往下移动,当下腔压力水全部被挤出来时,小阀板缓缓下降,恢复到待机状态,此过程中缓闭时间可调节(3s~150s),届时阀板已全部关闭,滴水不漏。
-
We have pivotal equipments including 1600 tons and 1200 tons water press,φ3000mm jarring machine, 9m digging machine(2 sets), 2.5m plate shear machine(2 sets),δ30、δ50、δ60 plate roll machine,φ3.4m vertical lathe(2 sets),φ100mm drill press(2 sets), 5×5.5×15m3 backfire furnace, digital flame cutter,γ radial instrument, automatic welding machine for membrane wall, automatic welding machine for tube plate, tube panel bender, hydraulic tube expander, ect.
其中大型、关键设备有1600吨和1200吨水压机、φ3000mm辗环机、9m刨边机(2台)、2.5m剪板机(2台),δ30、δ50、δ60卷板机,φ3.4m立车(2台),φ100mm摇臂钻床(2台),5×5.5×15m3大型回火炉,数控火焰切割机,γ射线仪,膜式壁自动焊机,管板接头自动焊机,管屏成排弯曲机,液压胀管机等,吊装设备最大起吊能力50吨。
- 更多网络解释与water tube plate相关的网络解释 [注:此内容来源于网络,仅供参考]
-
deck end plate:甲板缘支承板(木船)
甲板用水密穿线管 water tight cable gland for deck (or deck tube) | 甲板缘支承板(木船) deck end plate | 甲板支柱 deck pillar
-
water tube plate:水管板
water tube header 水管联箱 | water tube plate 水管板 | water tube single furnace boiler 单炉膛水管锅炉