英语人>词典>英汉 : tunnel work的中文,翻译,解释,例句,拼写相似词汇
tunnel work的中文,翻译,解释,例句,拼写相似词汇

tunnel work

tunnel work的基本解释
-

隧道掘进工作

更多网络例句与tunnel work相关的网络例句 [注:此内容来源于网络,仅供参考]

Early start for the tunnel, decoration and equipment installation work plan in early March to open the tunnel structure; Dalian Road Tunnel builders are being intensified Eastern wells internal structure of the construction work, and Jiang contact corridors drilling works to ensure completion of the opening on October 1 this year; and extremely rare in the world of the double-barrel double-Hing Road Tunnel builders are conflicting for the Northern Line on February 8 out of its hole for active preparations, the project will be completed by the end of 2004 all opened.

年初四开始,进行隧道的内装修和设备安装工作,计划在3月上旬实现隧道结构贯通;大连路隧道的建设者则正加紧东线工作井内部结构的施工以及江中联络通道的钻孔施工,确保今年10月1日竣工通车;而在世界上极为罕见的双管双层的复兴路隧道,建设者们正为北线盾构2月8日出洞作积极准备,该工程将于2004年底全线竣工通车。

It was shown that the 3D deformation in the tunnel at soft rock was obvious at F7 fault and phyllite section, with the characteristics of large deformation and longitudinal displacement developing in the opposite direction of work face and being stable at a distance about 2.0 times of tunnel diameter from the work face. And the 3D displacement of tunnels at F7 fault zone developed in an uneven symmetrical way, while there was good consistency for 3D deformation at slate section. Furthermore, there was a mutally verifying relationship between 3D deformation and ground stress distribution of tunnel region.

结果表明,F7断层和千枚岩地段软岩隧道三维位移十分明显,具有隧道大变形特性,其纵向位移背离开挖面方向发展并在相距开挖面约2.0倍洞径时趋于稳定状态;F7断层地段隧道三维位移呈不均匀对称地发展变化,而板岩地段三维位移变化的一致性较好;隧道三维变形规律与隧道区域地应力场的分布存在相互印证关系。

Self-introduction of the Presenter Mr Hsieh Y Shan, Director of Business Department 2 at RSEA Engineering Co. was in 1972 graduated and conferred Bachelor of Civil Engineering, then Master of Geotechnic Engineering.In 1982, studying in Austria the NATM method for 6 months. In 1983, he was conferred Engineering Award for Distinguished Youth by Engineers Society. Engaged in relevant tunnel work for 33 years, he managed the construction of Hsueh Shan tunnel, by taking responsibility of breakthrough of pilot tunnel and two main tunnels.

谢玉山先生,台湾荣民工程股份有限公司业务二处处长。1972年获土木工程学士,同年高考及格兼取得土木技师,1987年获亚洲理工学院大地工程硕士。1982年赴奥地利专题研究新奥隧道工法6个月。1983年获中国工程师学会优秀青年工程奖状。

更多网络解释与tunnel work相关的网络解释 [注:此内容来源于网络,仅供参考]

access to work:地盘施工处通路;工地施工处通路

access to the site 地盘出入口;工地出入口 | access to work 地盘施工处通路;工地施工处通路 | access tunnel 通道隧道

tunnel portal:隧道洞口

tunnel machine 隧道掘进机 | tunnel portal 隧道洞口 | tunnel work 开挖隧道

access tunnel:通道隧道

access to work 地盘施工处通路;工地施工处通路 | access tunnel 通道隧道 | accessible roof 可到达的屋顶;有通道的屋顶