tail bay
- tail bay的基本解释
-
-
下闸首
-
-
尾水池
- 更多网络例句与tail bay相关的网络例句 [注:此内容来源于网络,仅供参考]
-
PS version on the version of the head or tail along Bay Edition version line to cracking.
印版裂开。pS版有可能在版头或版尾沿湾版线产生裂纹。
-
The simulation shows that the major impact factor on storm surge is the change of the area due to reclamation. The factor of elevated topography due to reclamation is minor. After the reclamation, the extreme high level of storm surge is increased by 1.85~0.09m, decreasing from tail to mouth in Hangzhou Bay. After the planned reclamation, storm surge increases as a whole. The increased peak value is 0.25m at the center of Hangzhou Bay.
结果表明,围涂引起的平面边界改变是影响杭州湾风暴潮的主要因素,围涂引起的地形抬升的影响是次要因素;已有围涂使杭州湾极端风暴高潮位抬升1.85~0.09m,抬升幅度由湾顶向湾口递减;规划围涂后,杭州湾风暴高潮位总体抬升,抬升值最大的湾中部为0.25m。
- 更多网络解释与tail bay相关的网络解释 [注:此内容来源于网络,仅供参考]
-
tail bay:后段船闸
taiga climate 泰加林气候 | tail bay 后段船闸 | tail beam 尾梁
-
tail bay:楼板下空间 ,尾池,最后节间
tail | 橡尾 ,悬橡 \\r\\n | tail bay | 楼板下空间 ,尾池,最后节间 \\r\\n | tail beam | 尾梁 \\r\\n
-
tail bay:下闸首
tail wire 尾端线,出线 | tail-bay 下闸首 | tail-board 尾板,后挡板
-
tail bay:尾水池,端跨
tail assembly 尾翼 | tail bay 尾水池,端跨 | tail bay wall 船闸后庭墙
-
tail bay WESTBANK:楼板下空间 ,尾池,最后节间
tail WESTBANK 橡尾 ,悬橡 | tail bay WESTBANK 楼板下空间 ,尾池,最后节间 | tail beam WESTBANK 尾梁
- 加载更多网络解释 (3)