suspension functor
- suspension functor的基本解释
-
-
同纬映象函子
- 相似词
- 更多 网络例句 与suspension functor相关的网络例句 [注:此内容来源于网络,仅供参考]
-
When dismantle the machine, firstly, stop the suspension coop on the lower 2 sections of the standard sections, the operation staff go on the suspension coop top, the hoisting machine loosen rope, lift the pillar with small shaft, pull out the horizontal pin of pillar, let the pillar fall slowly to thedismantled section's middle angle bar, insert the horizontal pin again. At this time, loosen the connection screw of standard section with spanner, hang the shaft of hand crane on the upper angle bar, sway the shaft of hand crane upward, separate this standard section from the next section, and lay itin the suspension coop, dismantle the other standard section for the same method, and turn the shaft to another direction, draw the lifting wire rope tightly, the operation staff leave the suspension coop, open the lock stopping instrument, fall the suspension coop to next position and lock the brakeinstrument, the operation staff return to the top of suspension coop, continually dismantle note: forbid the staff leave on the top of suspension coop or in the coop when the suspension coop is running
8.1折除时,首先将吊笼用停层装置停靠在待拆除的标准节的下两节上,操作人员上到吊笼顶,卷扬机松绳,用小吊杆将顶梁略向上提起,拔出顶梁横销,使顶梁值得徐徐降下,降到拆除节下一节中间框架角处,并重新穿上横销,这时用板手将标准节连接螺栓松开,将手摇起重机小吊杆钩挂在待拆节上框架用钢土,到吊笼内,用同样的方法拆下另一节标准节,然后将吊杆转向不影响升降机运行的方向,收紧起升钢丝绳,操作人员离开吊笼,打开锁止机构,使吊笼下降到下一个拆除位置,并将锁止机构锁死,人员重返笼顶,进行下一拆除循环(注意:在吊笼运行时绝不允许有人员留在吊笼顶部或吊笼内
-
The configuration software through completes the stage suspension bar to the stage suspension bar system design realization the monitor and controls the stage suspension bar automation information system construction mainly to include the stage suspension bar long-distance monitoring, part and so on distribution line automated system, its goal uses the scene supervisory system, realizes data source automatic gathering, with the aid of the stage existing network resources auto loading to the real-time database, applies for all levels of control section provides the opening the data platform, causes the administrative personnel promptly to control and to grasp the suspension bar tendency, thus realizes the entire stage suspension bar movement process automation; And may to the real-time data which obtains carry on the statistics, the analysis, the optimization, thus for guaranteed the suspension bar equipment normal work, reduces the performance production cost to provide the important basis.
组态软件通过对舞台吊杆系统的设计实现完成舞台吊杆的监测和控制舞台吊杆自动化信息系统建设:主要包括舞台吊杆远程监控、配电线路自动化系统等部分,其目的是利用现场监控系统,实现数据源头自动采集,借助舞台现有网络资源自动加载到实时数据库,为舞台管理部门应用提供开放的数据平台,使管理人员及时控制和掌握吊杆动态,从而实现整个舞台吊杆运行过程的自动化;并可以对取得的实时数据进行统计、分析、优化,从而为保证吊杆设备正常运转、降低演出生产成本提供重要依据。
-
At this time, loosen the connection screw of standard section with spanner, hang the shaft of hand crane on the upper angle bar, sway the shaft of hand crane upward, separate this standard section from the next section, and lay it in the suspension coop, dismantle the other standard section for the same method, and turn the shaft to another direction, draw the lifting wire rope tightly, the operation staff leave the suspension coop, open the lock stopping instrument, fall the suspension coop to next position and lock the brake instrument, the operation staff return to the top of suspension coop, continually dismantle note: forbid the staff leave on the top of suspension coop or in the coop when the suspension coop is running
8.1折除时,首先将吊笼用停层装置停靠在待拆除的标准节的下两节上,操作人员上到吊笼顶,卷扬机松绳,用小吊杆将顶梁略向上提起,拔出顶梁横销,使顶梁值得徐徐降下,降到拆除节下一节中间框架角处,并重新穿上横销,这时用板手将标准节连接螺栓松开,将手摇起重机小吊杆钩挂在待拆节上框架用钢土,到吊笼内,用同样的方法拆下另一节标准节,然后将吊杆转向不影响升降机运行的方向,收紧起升钢丝绳,操作人员离开吊笼,打开锁止机构,使吊笼下降到下一个拆除位置,并将锁止机构锁死,人员重返笼顶,进行下一拆除循环注意:在吊笼运行时绝不允许有人员留在吊笼顶部或吊笼内
- 更多网络解释 与suspension functor相关的网络解释 [注:此内容来源于网络,仅供参考]
-
suspension functor:同纬映象函子
suspension 同纬 | suspension functor 同纬映象函子 | suspension homomorphism 同纬映象同态