surrounding rock
- surrounding rock的基本解释
-
-
围岩
- 相关歌词
- I Wish Those Cats @ Fobia Would Give Me Some Free Shoes
- Gigolo
- I Declare War
- Tears
- Holding On To You
- Hit You With The Real Thing
- 相关中文词汇
- 围岩
- 更多网络例句与surrounding rock相关的网络例句 [注:此内容来源于网络,仅供参考]
-
In this thesis, the methods of surrounding rock masses stability classification on the basis of the geological documentation of muck and the boring parameters of TBM are approached, especially as follows:①The geological documentation of muck and the boring parameters of TBM in the Yellow River Diversion Project.of shanxi province is summarized systematically;②Based on the geological documentation of muck and the boring parameters of TBM, that whether the common methods of surrounding rock masses stability (the methods of regular factor classification) classification are feasible, is carried on the discussion;③According to the corresponding relation of muck and the boring parameters of TBM and the surrounding rock masses stability type, the extension assessment method of tunnel surrounding rock masses stability classification is set up, also the corresponding fortran calculation procedure worked out, and not only rational result in conformity with the reality can be obtained, but also the stability situation of surrounding rock masses in front of the working range can be predicted according to the change of the dependent value in the application instance of Yellow River Diversion Project;④Combining with the application instance of Yellow River Diversion Project, extension assessment method in the application of surrounding rock masses stability classification is compared and verificated in detail by applying fuzzy synthesis method by forefathers, and a certain degree discussion and summary about the application achievement of surrounding rock masses stability classification, which is assessed by extension assessment method and fuzzy synthesis method, are carried on.
本文基于渣料和TBM掘进参数的地质编录提供的地质信息进行了围岩稳定分类方法的探讨,重点进行:①对引黄工程中渣料和TBM掘进参数的地质编录的系统整理;②基于渣料和TBM掘进参数的地质编录获得的地质信息,对常用围岩稳定分类方法是否能够进行围岩稳定分类进行了探讨;③根据渣料和TBM掘进参数与围岩稳定类型的对应关系,应用可拓理论,建立了隧洞围岩稳定分类的可拓评价方法,还编制了相应的fortran计算程序,并在引黄工程的应用实例中不仅取得了与客观实际相符的合理结果,而且根据其关联度值的变化能够预测临近掌子面前方围岩的稳定情况;④结合引黄工程的应用实例运用模糊综合评判方法对可拓评判方法在围岩稳定分类中的应用进行了详细的验证、比较,并对前人在运用可拓学和模糊数学进行岩体稳定评判的应用成果方面,进行了一定的探讨、总结。
-
The entrance section of FuXi Double-arched Tunnel is modeled in the fact of factual shallow buried and unsymmetrical pressure condition. Adopting the three heading construction method to simulate twelve kinds of construction projects, confirm reasonable construction orders and left and right tunnel face interval, systematically analyze and research the changing law of the tunnel deformation and surrounding rock stress in soft and cracked condition of surrounding rock,bring forward pertinent advices against construction disease; Build the deep buried tunnel model in middle section of tunnel , separately adopt the central heading bench cut benching method and the central heading full cross method to simulate ten kinds of construction projects, establish the reasonable construction orders, sidestep length and tunnel face interval, which are due to the deep buried tunnel, systematically analyze and research the change law of the tunnel deformation and surrounding rock stress in the section with good surrounding rock condition, bring forward the reasonable construction projects which can make sure of construction safety and save construction time; Because the central wall is disturbed many times during constructing process, its displacement and stress distribution is very complex.
富溪隧道进口段依照实际的浅埋偏压状况建立模型,采用三导洞法开挖模拟了12种方案,确定了合理的施工顺序和左右主洞掌子面错距,系统地分析研究了软弱破碎围岩浅埋偏压段施工的隧道变形和围岩应力变化规律,提出了防止施工病害的针对性建议;洞身段按深埋隧道建立模型,分别采用中导洞台阶法和中导洞全断面法模拟了10种方案,确立了适合深埋隧道的合理施工顺序、台阶长度和掌子面错距,系统分析研究了围岩较好深埋段施工的隧道变形和围岩应力变化规律,提出了兼顾施工安全和节省工期的合理施工方案;由于受到多次扰动,中隔墙的位移和应力变化规律较为复杂,通过对各种方案的对比分析,得出了中隔墙在施工不同阶段的位移变化规律、应力变化规律和应力分布规律,尤其对于浅埋偏压段隧道施工时中隔墙位移和应力变化规律做了深入研究,提出了合理的施工建议。
-
From the results of numerical simulation, distributing characters of stress and strain field of surrounding rock mass under gravity is analyzed, which presents the effect of quality of surrounding rock mass, construction order and interactions of adjacent underground runnels while being constructed simultaneously. Impact of interlayer shearing belts on surrounding rock mass stability of underground c
对工程区右岸地下引水洞室群的围岩稳定性进行系统研究,可以控制工程投资,提高施工质量和支护设计精度;分析评价洞室围岩的整体及局部稳定性,消除洞室稳定的潜在危害,对保证地下洞室的施工安全、围岩的长期稳定以及优化设计具有十分重大的工程实践意义。
- 更多网络解释与surrounding rock相关的网络解释 [注:此内容来源于网络,仅供参考]
-
surrounding rock:围岩控制
围岩位移:surrounding rock displacement | 围岩控制:surrounding rock | 网络环境:the network surrounding
-
surrounding rock:的翻译
surrounding rock的翻译: | surrounding rock相关词的翻译: | 围岩:the surrounding rock
-
surrounding rock pressure:围岩压力
围岩 surrounding rock | 围岩压力 surrounding rock pressure | 围岩稳定 stability of surrounding rock